1 Super-B Factory Scenarios John Seeman Assistant Director PPA Directorate SLAC SLUO Meeting September 11, 2006.

Slides:



Advertisements
Similar presentations
Crab crossing and crab waist at super KEKB K. Ohmi (KEK) Super B workshop at SLAC 15-17, June 2006 Thanks, M. Biagini, Y. Funakoshi, Y. Ohnishi, K.Oide,
Advertisements

Beam-Beam Effects for FCC-ee at Different Energies: at Different Energies: Crab Waist vs. Head-on Dmitry Shatilov BINP, Novosibirsk FCC-ee/TLEP physics.
SuperB and SuperKEKB * Y. Ohnishi KEK July 3, 2008 * SuperKEKB is the KEKB upgrade in the framework of the KEK roadmap 1.
Lattice Status SuperB Project Workshop SLAC, October 6-9, 2009 Yuri Nosochkov for the SuperB Lattice Team Major recent updates by P. Raimondi and S. Sinyatkin.
1 Possibilities of ILC parameters optimization with crossing angle SLAC, June 27, 2006 P. Raimondi, M.Pivi, A.Seryi.
SuperB Damping Rings M. Biagini, LNF-INFN P. Raimondi, SLAC/INFN A. Wolski, Cockroft Institute, UK SuperB III Workshop, SLAC, June 2006.
SuperKEKB IR Design Y. Funakoshi (KEK).
Super B-Factory Workshop, Hawaii, April 20-22, 2005 Lattice studies for low momentum compaction in LER M.E. Biagini LNF-INFN, Frascati.
SLAC Accelerator Department Super-B-Factory John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department Caltech Meeting.
First approach to the SuperB Rings M. Biagini, LNF-INFN April 26th, 2006 UK SuperB Meeting, Daresbury.
July 24, 2008Super-B Mini-MAC MeetingPage 1 Super-B Overview John Seeman Accelerator Systems Division SLAC.
Linear Super-B Factory Progress John T. Seeman FPCP Workshop Vancouver BC April 9, 2006.
Beam-beam studies for Super KEKB K. Ohmi & M Tawada (KEK) Super B factories workshop in Hawaii Apr
Issues for Optimization of a Super-B Factory John T. Seeman SBF Workshop SLAC June 14, 2006.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
Beam-beam simulations M.E. Biagini, K. Ohmi, E. Paoloni, P. Raimondi, D. Shatilov, M. Zobov INFN Frascati, KEK, INFN Pisa, SLAC, BINP April 26th, 2006.
Status on SuperB effort SLAC, June 14, 2006 P. Raimondi.
Working Group 3 Summary M. Sullivan / Y. Funakoshi.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
SuperB Accelerator & ILC SuperB Accelerator & ILC M. E. Biagini, LNF-INFN for the SuperB Team ILC GDE visit, LNF, Jan. 22 th 2008 D. Alesini, M. E. Biagini,
SuperB Design Progress Paris, Jan 27, 2007 P. Raimondi for the SuperB Team.
ITEP Meeting 07.25,2006 Moscow Marcello A Giorgi1 ITEP Meeting on the future of heavy flavour physics July 24-25,2006 Marcello A. Giorgi Università di.
July 7, 2008SLAC Annual Program ReviewPage 1 PEP-II in Run 7 and Transition Planning John T. Seeman Assistant Director PPA/LCLS.
New Ideas for Super B Factories for Flavour Physics Steve Playfer University of Edinburgh, Future Directions, BEACH 2006 Lancaster, July 2006.
Luminosity of the Super-Tau-Charm Factory with Crab Waist D. Shatilov BINP, Novosibirsk TAU’08 Workshop, Satellite Meeting “On the Need for a Super-Tau-Charm.
SuperB Lattice Studies M. Biagini LNF-INFN ILCDR07 Workshop, LNF-Frascati Mar. 5-7, 2007.
1 BINP Tau-Charm Project 3 February 2010, KEK, Tsukuba E.Levichev For the BINP C-Tau team.
2 nd workshop on SuperB 17.03,2006 LNF Marcello A Giorgi1 Marcello A. Giorgi Università di Pisa and INFN Pisa Closeout Remarks 2nd Workshop on SuperB FRASCATI.
SLAC Accelerator Development Program: SuperB Mike Sullivan OHEP Accelerator Development Review January 24-26, 2011.
A.Variola B. What is the ‘crab waist’ scheme? And why does it make a high luminosity factory possible? Machine parameters ILC & SuperB.
Introduction of Accelerators for Circular Colliders 高亮度 TAU-CHARM 工厂 & 先进光源, 2014/09.
SuperB Accelerator Overview & Status M. E. Biagini, LNF-INFN for the SuperB Accelerator Team SuperB Meeting Elba, May 31 th, 2008.
EPS Krakow July 16-22, 2009 B-factory developments 1 e+e- Factory Developments M. Sullivan EPS 2009 Krakow, Poland July 16-22, 2009.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
Design and Parameters for a linearly colliding Super B-FACTORY
M. Sullivan for the SLAC SuperB Workshop Jan , 2009
Update on B and Phi Factories
Crab Waist Collision Studies for e+e- Factories
Large Booster and Collider Ring
The SuperB Accelerator Lattice M. E
2nd Workshop on a Super B-Factory INFN-LNF, Frascati, Italy
First Look at Nonlinear Dynamics in the Electron Collider Ring
CEPC-SppC Accelerator CDR Copmpletion at the end of 2017
BINP Tau-Charm Project
Super-B Overview John Seeman Accelerator Systems Division
A SuperB-like cell for OCS6 (work in progress...)
SuperB Accelerator Overview and Status
XII SuperB Project Workshop LAPP, Annecy, France, March 16-19, 2010
The project of t-charm factory with crab waist in Novosibirsk
CEPC partial double ring scheme and crab-waist parameters
Comparison of the final focus design
LHC (SSC) Byung Yunn CASA.
Interaction Region Design Options e+e- Factories Workshop
SuperB CDR Machine P. Raimondi for the SuperB Team Paris, May 9, 2007.
Beam-beam simulations with crossing anlge + crab-waist
Beam-Beam Effects in the CEPC
AC Power for a Super-B Factory
Summary of Washington DOE Review
Overall Considerations, Main Challenges and Goals
Beam-Beam Effects in High-Energy Colliders:
Super-B Accelerator Overview
SuperB IRC Meeting Frascati, Nov. 13th 2007
Super-B Factory in a “4400m” Tunnel
Cost Algorithm for a Super-B Factory
M. E. Biagini, LNF-INFN SuperB IRC Meeting Frascati, Nov , 2007
MEIC New Baseline: Performance and Accelerator R&D
Beam-beam simulations
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
MEIC Alternative Design Part III
Presentation transcript:

1 Super-B Factory Scenarios John Seeman Assistant Director PPA Directorate SLAC SLUO Meeting September 11, 2006

Super-B Contributors (Accelerator): LNF: Biagini, Raimondi, Zobov Pisa: Giorgi, Paoloni BINP: Koop, Levichev, Shatilov KEKB:Ohmi SLAC: Novokhatski, Roodman, Seeman, Seryi, Sullivan, Wienands Caltech:Albert Also: PEP-II and KEKB staff

3 Super-B Workshops Frascati: November 2005 Daresbury: April 2006 SLAC: June 2006 KEK: September 13-15, 2006 SLAC: October 19-24, 2006 Frascati: November 13-15, 2006

4 Outline There are two present avenues of study for a future very high luminosity B-Factory: –Super KEKB (extension of present machines) Use existing KEK tunnel, magnets, RF system, New injector, vacuum system, crab cavities, IR High current and high AC power –“Damping ring style” collider “Super-B” (new concept): New lattice similar to ILC damping ring New IR similar to ILC final focus Crab-waist for low vertical beta but long bunches Present currents and low AC power Reuse “PEP-II RF and magnets”

5 K. Oide

?

7 To be tested in 2007

8 K. Ohmi Sept 2006

9 K. Oide Horizontal tune even closer to the half integer (0.503)

10

11 K. Oide July 2006

12 IP FF ILC “like” rings & ILC “like” Final Focus P. Raimondi Super-B Factory

13 Super-B Factory Design Design still fresh and changing Started with ILC parameters but has evolved toward smaller rings as new features were added: –Full lattices developed –IR developed with good beam-stay-clear –New IR included in lattice studies –4 GeV x 7 GeV –Dynamic apertures are good –Tune plane is good. –Fewer bunches are needed, so shorter rings than ILC

14 Possible site: Tor Vergata near Frascati and Rome Near INFN Frascati Near future subway 3 km rings possible

15 K. Oide July 2006

16

17 IP layout 35cm 2*  =30mrad L*=35cm QD0a QF1_HER QD0b LER beam HER beam  =9mrad  =28mrad QD0a and QD0b have the same Ks QD0a is shared, all the other quads are on the beams trajectories QF1_LER 70cm 40cm August 2006 Raimondi

18 Collisions with crossing angle = 2*25mrad and long thin bunches with a small vertical beta. Horizontal PlaneVertical Plane Raimondi

19

20 Vertical waist has to be a function of x: Z=0 for particles at –  x (-  x /2  at low current) Z=  x /  for particles at +  x (  x /2  at low current) Crabbed waist realized with a sextupole in phase with the IP in X and at  /2 in Y 2Sz 2Sx  z x 2Sx/  2Sz*  e- e+ YY Crabbed waist removes bb betratron coupling Introduced by the crossing angle

21 FFTB-style Final Focus IP phase sextupoles

22 HER cell LER cell Extra 1.2m bends Use PEP-II quads and dipoles

23 HER ring lattice with FF (Option A: 2.7 km) August 2006

24 HER ring lattice with FF (Option B: 1.7 km) September 2006

25 Ring Parameters Energy (GeV)47 C (m)2762 B w (T) L bend (m) N. bends96 B bend (T) Uo (MeV/turn) Wiggler sections44  z (mm) 7.0  s (ms) 17  x (nm) Emittance ratio0.25% EE 1.0x x10 -3 Momentum compaction1.85x x10 -4 s Vrf (MV)5.519 N part (x10 10 ) I beam (A) Tousheck lifetime (min) P beam (MW) Frf (MHz)476 N bunches 4167 Gap5% P wall (MW) (50% eff) 2 rings23.2 xx 20mm xx4m4m  xp200  rad yy200  m yy 20nm  yp100  rad zz 7mm 2*  30mrad IP Parameters August 2006

26 Luminosity vs current Zobov and Shatilov Nominal

27 Beam size blowups vs current Zobov and Shatilov

28 Luminosity Tune Scan (0.8/ ,  z = 7 mm; 3x10 10 particles) L max = 2.2x10 36 cm -2 s -1 New Qx=0.57 Qy=0.60

29 A x = (0.0:20  x ) A y = (0.0:40  y ) Luminosity and size blowups vs 2*  New 2*  =30mrad,  y=133  m Larger crossing angle Ax Ay

30 Ring dynamic aperture with FFTB-FF dp/p=0dp/p=-0.5%dp/p=0.5% 40  x 20  x 20  y 12  y

31 Recent Super-B Parameters Optimization Relaxed damping time => 17msec Relaxed y/x IP  s => 200  m/20mm Relaxed y/x IP  s => 20nm/4  m Relaxed crossing angle => 2*15mrad Relaxed bunch length => 7mm L dependence quadratic with current up to L of 2 x is “possible” for 25 to 30 MW. PEP-II magnets and 476 MHz RF system reused. Wiggler sections added to shorten damping time.

32 Conclusions A very high luminosity B-Factory seems to have several possible technical avenues. Recent studies show good progress for an “ILC like” ring and FF solution but of shorter length. The AC power is similar to present B- Factories. The study group aim is to have a “Technical Paper” written by the end 2006.