Collection device : status report Semen Mitrofanov Marc Loiselet Thierry Delbar Flerov Laboratory of Nuclear Reactions Joint Institute for Nuclear Research.

Slides:



Advertisements
Similar presentations
NuPECC Brussels 2009 The Cyclotron Research Centre of Louvain-la-Neuve: Present status Marc Loiselet UCL, Centre de Recherches du Cyclotron Louvain-la-Neuve.
Advertisements

6th LHC Radiation Workshop November 2007 Université catholique de Louvain (UCL) Centre de Recherches du Cyclotron (CRC) Irradiation Facilities at.
GEANT4 Simulations of TIGRESS
Γ spectroscopy of neutron-rich 95,96 Rb nuclei by the incomplete fusion reaction of 94 Kr on 7 Li Simone Bottoni University of Milan Mini Workshop 1°-
Yoro TALL Santiago de Compostela (Spain) June 7 – 10, Second IP EUROTRANS Internal Training Course on Nuclear Data for Transmutation: status, needs.
S. Sidorchuk (JINR, Dubna) Dubna Radioacive Ion Beams DRIBsIII: STATUS and PROSPECTS S. Sidorchuk (JINR, Dubna) 9-16 May 2013, Varna, Bulgaria 1.
A Pyroelectric Crystal Particle Accelerator
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
INDIA-BASED NEUTRINO OBSERVATORY (INO) STATUS REPORT Naba K Mondal Tata Institute of Fundamental Research Mumbai, India NUFACT Scoping Study Meeting at.
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
Nufact 2008The Beta Beam WP1 Beta beam R&D status Elena Wildner, CERN on behalf of the Beta Beam Study Group EURISOL/Euronu.
experimental platform
Measurements of cross-sections of neutron threshold reactions and their usage in high energy neutron measurements Ondřej Svoboda Nuclear Physics Institute,
Beta Beams Safety issues and WBS E. Benedetto and E. Wildner EUROnu Safety Workshop 9-10 June 2011, CERN Outline Introduction: the Beta Beams Tentative.
XXXVIII th Rencontres de Moriond MORIOND WORKSHOP ON Radioactive beams for nuclear physics and neutrino physics Acceleration of RIB using cyclotrons Guido.
RAL/BENE meeting, April Marcos Dracos Collection system for future neutrino beams horn and target integration 2 LoI's sent –CERN –Strasbourg.
Cross section measurements at LNL M.Mezzetto (INFN-Pd) on behalf of INFN-LNL: M. Cinausero, G. De Angelis,G. Prete.
Mats Lindroos Measuring difficult reaction rates involving radioactive beams: A new approach John D’Auria, Mats Lindroos, Jordi Jose and Lothar Buchmann.
23 July 2010FLNR Dubna Summer Students Practice Flerov Laboratory of Nuclear Reactions, JINR, Dubna 2010 JINR, Dubna 2010 Studies with radioactive ion.
Radioactive ion beam facilities How does they work ? 2012 Student Practice in JINR Fields of Research 9.oct.2012 I. Sivacekflerovlab.jinr.ru.
Status of E391a Search for K L    decay G.Y.Lim IPNS, 32nd ICHEP 19 th August 2004 Beijing.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
© 2003 By Default! A Free sample background from Slide 1 JINR SCIENTIFIC COUNCIL 104 th Session, 25 September 2008, Dubna.
SLHC Introduction to the “Workshop on Cryogenics and Vacuum Sectorization of the SPL” R. Garoby – 9/11/2009.
1 Status of Neutrino Beamline Construction K. Nishikawa IPNS, KEK 2006 . 12 . 4.
05/02/08 EUROnu, Elena Wildner, CERN, 05/02/ EURO Beta Beams Kick-off meeting  Elena Wildner, CERN.
Radioactive ion beam production at other facilities
Mats Lindroos Future R&D: beta-beam Mats Lindroos.
CERN/BENE meeting, July Marcos Dracos Collection system for future neutrino beams horn and target integration 2 LoI's sent –CERN –Strasbourg Who.
MICE TARGET OPERATION C. Booth, P. Hodgson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 – The MICE Experiment2 - The.
Status Report for KEK-PS E391a KEK IPNS G.Y.Lim 14 April 2003.
J. Bouchez CEA/DAPNIA CHIPP Neuchâtel June 21, 2004 A NEW UNDERGROUND LABORATORY AT FREJUS Motivations and prospects.
EuCARD 1st ANNUAL MEETING, 2010 Progress on ion production studies for beta beams Elena Wildner, CERN 14/04/10 1 Rutherford Appleton Laboratory (RAL),
Status Report of the LISOL Laser Ion Source Yu.Kudryavtsev, T.Cocolios, M.Facina, J.Gentens, M.Huyse, O.Ivanov, D.Pauwels, M.Sawicka, P.Van den Bergh,
NEUTRINO DETECTORS Cutting-Edge Accelerator Research for a Neutrino Factory and Other Applications Ajit Kurup for the FETS and UKNF Collaborations Cutting-Edge.
Review of synthesis of super heavy elements: reactions, decays and characterization. Experimental Setup of MASHA. Results of first experiments. study.
Status of KEK 150MeV FFAG M. Aiba (KEK) For KEK FFAG Gr. FFAG’05, 5 to 9 Dec., KURRI.
Summary of the WA104, T600 overhauling programme C. Montanari – INFN-PV, Italy M. Nessi – CERN, Switzerland weekly meeting, December 18,
Ondřej Svoboda Nuclear Physics Institute, Academy of Sciences of Czech Republic Department of Nuclear Reactors, Faculty of Nuclear Sciences and Physical.
Prospects to measure 8 B production VLADIMIR KRAVCHUK Laboratori Nazionali di Legnaro, Italy EUROnu week in Strasbourg 1-4 June 2010.
CERN, 15/03/05EURISOL - Beta Beam Task1 EURISOL and the Beta-Beam Task Status and Planning Michael Benedikt Mats Lindroos AB-Department, CERN.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
ISOLDE Physics Report Magdalena Kowalska. Injector schedule since last meeting 2 September: confirmation of 2 more weeks with protons – until December.
Ondřej Svoboda Nuclear Physics Institute, Academy of Sciences of Czech Republic Department of Nuclear Reactors, Faculty of Nuclear Sciences and Physical.
Neutron production in Pb/U assembly irradiated by deuterons at 1.6 and 2.52 GeV Ondřej Svoboda Nuclear Physics Institute, Academy of Sciences of Czech.
GDR Neutrino, Annecy 2007 Beta-beam team1 Beta-beams M. Benedikt, A. Fabich and M. Lindroos, CERN on behalf of the Beta-beam Study Group
Neutron production in Pb/U assembly irradiated by 1.26 AGeV deuterons. First experimental results Ondřej Svoboda Neutron production in Pb/U assembly irradiated.
Collection device for 8 Li and 8 B Semen Mitrofanov Marc Loiselet Thierry Delbar Université catholique de Louvain Centre de Recherches du Cyclotron Louvain-la-Neuve.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
P.F.Ermolov SVD-2 status and experimental program VHMP 16 April 2005 SVD-2 status and experimental program 1.SVD history 2.SVD-2 setup 3.Experiment characteristics.
Jacques Bouchez Radioactive Beams for Nuclear and Neutrino Physics Les Arcs Mars 2003.
© 2003 By Default! A Free sample background from Slide 1 JINR SCIENTIFIC COUNCIL 102 nd Session, September 2007, Dubna.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
1 Activation by Medium Energy Beams V. Chetvertkova, E. Mustafin, I. Strasik (GSI, B eschleunigerphysik), L. Latysheva, N. Sobolevskiy (INR RAS), U. Ratzinger.
Laboratori Nazionali del Sud Start EXCYT status and perspectives L. CELONA on behalf the EXCYT collaboration Istituto Nazionale di Fisica Nucleare-Laboratori.
NPA5, Eilat 7/4/20117/4/2011 Apparatus for intense 8 Li RIB production experiment at SARAF Phase I Tsviki Y. Hirsh 1.
Beam Preparation, Task 9 Department of Physics, University of Jyväskylä.
Three years of cross-section measurements of (n,xn) threshold reactions at TSL Uppsala and NPI Řež O. Svoboda, A. Krása, A. Kugler, M. Majerle, J. Vrzalová,
P1 – GANIL P2 – CNRS/IN2P3 P3 – INFN P4 – CERN P6 – CEA Saclay P7 – NIPNE Bucarest P18 – PSI Switzerland P19 – IPUL Latvia C2 – BINP Novosibirsk C3 – VNIITF.
Collection device for Li-8 and B-8.
Cross-section Measurements of (n,xn) Threshold Reactions
b-beams: R&D Challenges in FP7
of secondary light ion beams
of secondary light ion beams
Accelerator R&D for Future Neutrino Projects
FEBIAD ion source development efficiency improvement
XVth International Workshop on Neutrino Factories, Betabeams and Superbeams LAGUNA-LBNO Many thanks to D. Duchesneau, F. Di Lodovico, T. Patzak, A. Rubbia.
Neutron production in Pb/U assembly irradiated by p+, d+ at 0. 7 – 2
A High Intensity Neutrino Oscillation Facility in Europe
A High Intensity Neutrino Oscillation Facility in Europe
Presentation transcript:

Collection device : status report Semen Mitrofanov Marc Loiselet Thierry Delbar Flerov Laboratory of Nuclear Reactions Joint Institute for Nuclear Research Dubna Université catholique de Louvain Centre de Recherches du Cyclotron Louvain-la-Neuve NuFact’11 XIII Workshop on Neutrino Factories, Superbeams and Beta-beams. CERN, August the 1st, 2011

CRC LLN Centre de recherches du Cyclotron Université Catholique de Louvain LLN RIB typical intensities after post-acceleration and isobaric separation on experimenter’s target. Noble gases or extraction as molecules NuFact’11 XIII Workshop on Neutrino Factories, Superbeams and Beta-beams. CERN, August the 1st, 2011

Main idea – “Beam cooling with ionisation losses” – C. Rubbia, A Ferrari, Y. Kadi and V. Vlachoudis in NIM A 568 (2006) 475–487 Collection device task: To build the prototype of the collection device and test it on-line. To measure the extraction efficiency for Li-8. To study extraction technique of B-8. 7 Li(d,p) 8 Li and 6 Li( 3 He,n) 8 B * From Rubbia. NuFact’11 XIII Workshop on Neutrino Factories, Superbeams and Beta-beams. CERN, August the 1st, 2011

Collection device – what is it Scheme: beam->target->catcher->diffusion + effusion-> 8 Li detection NuFact’11 XIII Workshop on Neutrino Factories, Superbeams and Beta-beams. CERN, August the 1st, 2011

produce 8 Li in deuterium target stop and catch 8 Li in stopper extract 8 Li from the catcher detect and count β – decay of 8 Li We should start from 8 Li to make all tests and probe the whole system What we should do to realize it R&D stages: Main goal now is: NuFact’11 XIII Workshop on Neutrino Factories, Superbeams and Beta-beams. CERN, August the 1st, 2011

7 Li beam energy 29 MeV (energy losses in the target) intensity starting point - 1 pnA deuterium or CD 2 targets kinematics => narrow output angular cone for the 8 Li 1.The key points for 8 Li production (our tests) 2.Stop and Catch R&D stages: tantalum foils with 20x2μm thickness toroidal geometry (future) NuFact’11 XIII Workshop on Neutrino Factories, Superbeams and Beta-beams. CERN, August the 1st, 2011

R&D stages: 3. 8 Li extraction and effusing 4. Detection ohmic heating up to 1400° catch the 8 Li on “cold finger” detect the β decay of 8 Li using scintillators measuring ∆E, E, time structure, counting 7 Li beam intensity measurement (PIPS detector) Up to 1000 A NuFact’11 XIII Workshop on Neutrino Factories, Superbeams and Beta-beams. CERN, August the 1st, 2011

Collection device – efficiency measurement Scheme: beam->target->stopper->diffusion + effusion-> 8 Li detection no oven All details are the same (in comparison with “Oven” setup) NuFact’11 XIII Workshop on Neutrino Factories, Superbeams and Beta-beams. CERN, August the 1st, 2011

Point #1 Beam and target preparation Modification of the ECR-source for the production of Li ions. Update of the beam line. Update of the experimental area. On-line tests with the primary beam (intensity up to 10nA) Target R&D, tests What was done 7 Li 8 Li Point by point… NuFact’11 XIII Workshop on Neutrino Factories, Superbeams and Beta-beams. CERN, August the 1st, 2011

Point #2. Catcher-oven research and design Development of temperature tests and design Technical drawings Material (Ta) shopping Manufacturing of the oven-catcher unit Offline tests Point by point… What was done NuFact’11 XIII Workshop on Neutrino Factories, Superbeams and Beta-beams. CERN, August the 1st, 2011

Point #3 Assembling of the experimental setup, tests. Assembling of the oven-catcher unit in the laboratory and Igloo R tests. Off-line (laboratory) temperature and vacuum tests of the experimental setup. On line (Igloo R) tests with the primary beam(intensity up to 0.7 nA). Point by point… What was done NuFact’11 XIII Workshop on Neutrino Factories, Superbeams and Beta-beams. CERN, August the 1st, 2011

Fresh…. NuFact’11 XIII Workshop on Neutrino Factories, Superbeams and Beta-beams. CERN, August the 1st, 2011

Fresh…. NuFact’11 XIII Workshop on Neutrino Factories, Superbeams and Beta-beams. CERN, August the 1st, 2011

Fresh…. NuFact’11 XIII Workshop on Neutrino Factories, Superbeams and Beta-beams. CERN, August the 1st, 2011

Point #4 Detection of 8 Li and full beam runs (starting September’10) Development of the data acquisition system and electronics. Off-line (generator & source) tests development. Off-line (generator & source) tests running. Online testing Only mechanics ? No…but…. On-line beam tests November’10 T(oven) = 1400°C, T(diff.pipe)=1550°C T(oven) = 1200°C, T(diff.pipe)=1247°C T(oven) = 1300°C, T(diff.pipe)=1300°C Beam pulsing t 1/2 = sec; λ = ln2/t 1/2 => λ=0.83 Go further with ohmic heating NuFact’11 XIII Workshop on Neutrino Factories, Superbeams and Beta-beams. CERN, August the 1st, 2011

we hoped to finished with Li-8: June’11 update September’11 (September – 3 beam runs, October – 1 run) Prototype design study/Prototype technical drawings for the B-8: June’11-September’11 Workshop (pcs machining) September-October’11 Off-line + on-line tests for B-8: fall’11 B-8, the goal is to be fully prepared in December’11 Time schedule after meeting NuFact’11 XIII Workshop on Neutrino Factories, Superbeams and Beta-beams. CERN, August the 1st, 2011

it will be 8 BF 3 molecule production: 8 B+AlF 3 => 8 BF 3 we will test pure boron diffusion Detect the decay of B Now the B setup is under construction and drawing The runs are scheduled for the November’11 and December’11 Spring’12 – full time measurements for Boron. Few words about Boron… NuFact’11 XIII Workshop on Neutrino Factories, Superbeams and Beta-beams. CERN, August the 1st, 2011

Few words about future… who knows… NuFact’11 XIII Workshop on Neutrino Factories, Superbeams and Beta-beams. CERN, August the 1st, 2011 Sketch of the future …. Far in the future in a galaxy far, far away….. Price & cost – up to 10 M€

Collection device : status report Semen Mitrofanov Marc Loiselet Thierry Delbar Thank You for Your attention Flerov Laboratory of Nuclear Reactions Joint Institute for Nuclear Research Dubna Université catholique de Louvain Centre de Recherches du Cyclotron Louvain-la-Neuve NuFact’11 XIII Workshop on Neutrino Factories, Superbeams and Beta-beams. CERN, August the 1st, 2011