TPAC1.2 JC / 1 st July2009 Results from Barnaby Levin (summer student) 1.

Slides:



Advertisements
Similar presentations
STAR Pixel Detector Phase-1 testing. 22 Testing interrupted LBNL-IPHC 06/ LG Lena Weronika Szelezniak born on May 30, 2009 at 10:04 am weighing.
Advertisements

Wafer Level Packaging: A Foundry Perspective
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Analysis of chip with 100 events, July 2001 Variation in pixel to pixel average ADC values (fixed pattern noise) Pixel ADC value event to event repeatability.
Panasonic Electric Works Corporation of America NaPiCa Light Sensor Oct 2009.
Temperature Dependence of FPN in Logarithmic CMOS Image Sensors Dileepan Joseph¹ and Steve Collins² ¹University of Alberta, Canada ²University of Oxford,
Neural Network Based Approach for Short-Term Load Forecasting
29 June 2004Paul Dauncey1 ECAL Readout Tests Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P. Dauncey, C. Fry, R. Halsall, M.
Atmospheric, Oceanic & Planetary Physics, University of Oxford A Dudhia MIPAS QWG13 Firenze June 2007 Page 1 Radiometric Offset Impact on L2 Anu.
Measuring Time Preference and the Elasticity of Intertemporal Substitution Miles S. Kimball, Claudia R. Sahm and Matthew D. Shapiro September 7, 2006 Michigan-Rand.
Molly, Gwyn, Sam, and Eric.  Configure DACs to have their digital input set to zero (2.5V) when they receive power  Ramp up to higher voltage at a “user.
Section 4.4 Creating Randomization Distributions.
Major Modifications and System Modeling Use a Peltier cooler as an actuator instead of a power resistor. Relocate the ambient sensor further away from.
TPAC1.1 Jamie Crooks. TPAC1.1 (honest) First Batch Four boards – Received 10 at last meeting from Paul – Tested before bonding 9 boards operated correctly,
TPAC1.2 Results Jamie Crooks 1 st June Status TPAC1.2 received WAFERSEPISUBSTRATEDPWDICED QTY 312STDYES75 312STDNO75 312HI RESYES75 318HI RESYES75.
The SEN kg Load Cell And The Wheatstone Bridge.
Lecture 3: Bridge Circuits
Jeopardy People DatesEventsCultureTriviaEconomy.
A 200x100 Array Of Electronically Calibratable Logarithmic CMOS Pixels
U-GAGE ® T30UX Series Ultrasonic Sensor with TEACH-Mode Configuration.
Penn ESE370 Fall DeHon 1 ESE370: Circuit-Level Modeling, Design, and Optimization for Digital Systems Day 11: October 1, 2010 Variation.
FPIX_flip_chip_test module calibration tests November 14 th 2012.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Engineer Training RTRun – Real Time Software TJ8300 / TJ8500 RTRun – Real Time Software.
SCT Week -CERN- September 23, Defective ASIC’s A. Ciocio - LBNL.
VTT ASSEMBLY 5 CHARACTERISATION KATE DOONAN & RICHARD BATES 2012.
ECFA Sep 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P.
TPAC1.1 Progress JC: Dec 8 th. Laser No further investigation of odd scans on V1.1 De-ionizing filter needs replacing – On order… Bulb needs replacing.
Do Now Find the mean, median, mode, and range of each data set and then state which measure of central tendency best represents the data. 1)2, 3, 3, 3,
11 Sep 2009Paul Dauncey1 TPAC test beam analysis tasks Paul Dauncey.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
NA62 Gigatracker Working Group Meeting 23 March 2010 Massimiliano Fiorini CERN.
MSP430 Project Justin King Oz Serpersu Nadiah Khalid Tim Dew.
Vendredi 18 décembre 2015 Status report on SPIROC chips Michel Bouchel, Stéphane Callier, Frédéric Dulucq, Julien Fleury, Gisèle Martin- Chassard, Christophe.
© ABB Corporate Research January, 2004 Experiences and Results from Initiating Field Defect Prediction and Product Test Prioritization Efforts at.
Lecture 3: Bridge Circuits
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Kevin Nash MaPSA-Light test system 1. The System 2.
1 Reverse Breakdown Voltage Studies Use Minglee’s leakage current as a function of reverse bias voltage measurements to look for evidence of ESD at array.
1 Oct 2009Paul Dauncey1 Status of 2D efficiency study Paul Dauncey.
, Dan Peterson Apparent inconsistencies and other issues in the xBSM measurements of IBS Scans We have studied the pinhole and CodedAperture.
Principles of Computer Engineering: Lecture 4: The Wheatstone Bridge
ELECTRONICS – Input Transducers Engineering Science – National 5.
Receiver Circuit Testing Test setup Eye diagrams BER measurement Eye - BER relationship.
USB_DAQ (PGA309EVM) for Real Sensor Application Iven Xu May. 20 th,
“The Role of Experience in Software Testing Practice” A Review of the Article by Armin Beer and Rudolf Ramler By Jason Gero COMP 587 Prof. Lingard Spring.
Pier Paolo Granieri, TE-CRG Collimation Upgrade Specification Meeting #35 21 st March, 2014.
网上报账系统包括以下业务: 日常报销 差旅费报销 借款业务 1. 填写报销内容 2. 选择支付方式 (或冲销借款) 3. 提交预约单 4. 打印预约单并同分类粘 贴好的发票一起送至财务 处 预约报销步骤: 网上报账系统 薪酬发放管理系统 财务查询系统 1.
$200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200.
PIXEL 2000 P.Netchaeva INFN Genova 0 Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme,
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
Single Pixel Mixer Tests July 2008 (version 2, posted 11 Aug 2008)
(2) Bridge Circuits.
TPAC1.0 Jamie Crooks.
MaPSA-Light Chip Test setup firmware Brown: M. Narain and others
The Trait Model of Change
Get Quick and Affordable Solution for Epson Printer Repair in Hudson, NY Call
Get Troubleshooting for Epson Printer Repair in Amsterdam, NY Call
Get Quick and Affordable Solution for Epson Printer Repair in Geneva, NY Call
Get Troubleshooting for Epson Printer Repair in Buffalo, NY Call
How to fix Printer Errors- Reliable Printer Repair Services at an affordable rate-
مراجعة عامة.
Imperial laser system and analysis
abacus4u & AbacusIEEE Sample calculation
TPAC status JC/Jan2010.
Similarities Differences
EXPERIMENTAL METHOD.
Types of Errors And Error Analysis.
Special Meadows Board Meeting
DESY test beam report: March 2019
Presentation transcript:

TPAC1.2 JC / 1 st July2009 Results from Barnaby Levin (summer student) 1

Config load errors Vary VDD1V8SRAM, plot configuration errors (random data) 2

Conclusion Single-column defects are generally “real” ie cannot be fixed by adjusting VDD1V8SRAM Nominal voltage 1.62v (±2%) as previously set up is generally good Two sensors tested are “on the edge” at 1.62v and showed variable/increasing dead columns during trimming – A special version of the power dongle set to 1.68v (±2%) has been made for these boards – No correlation between these chips and wafer Similar study at different temperatures will be conducted soon 3