Y. Karadzhov MICE MICO First EMR Plots 1.EMR detector has been successfully incorporated in the MICE DAQ system. 2.First 3 days of data taking in MICE.

Slides:



Advertisements
Similar presentations
PID Detector Size & Acceptance Chris Rogers Analysis PC
Advertisements

Muons going through MICE should –Have ISIS proton timing structure –Generate TOF signals –Satisfy ISIS and TOF trigger requirements MICE tracker DAQ will.
Bunch-by-bunch (relative) polarization measurements using inner annuli of STAR BBC Andrew Gordon April 4, 2008.
9 March 2005Edda Gschwendtner1 DAQ Terminology ISIS Terminology MICE Terminology Parameter Definitions.
1 Scintillating Fibre Cosmic Ray Test Results Malcolm Ellis Imperial College London Monday 29 th March 2004.
M. Bonesini - VC TOF status M. Bonesini Sezione INFN Milano Bicocca.
1 Analysis of TOF data Yordan Karadzhov St.Kliment Ohridski University of Sofia.
Online Reconstruction Update Linda R. Coney UCR Mar 25, 2010.
PID Detector Size & Acceptance Chris Rogers Analysis PC
Online Reconstruction Update Linda R. Coney UCR Dec 17, 2009.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
MICO 9th Aug 2010J.S. GraulichSlide 1 MOM report o Last Week o Run Plan for this Week o Machine Physics Jean-Sebastien Graulich, Geneva.
Linda R. Coney – 24th April 2009 Online Monitoring and Reconstruction Linda R. Coney 4 June, 2009.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting July 18, 2007.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Interface between Control & Monitoring and DDAQ o Introduction o Some background on DATE o Control Interface.
LarTPC Electronics Meeting Current Work at MSU Fermilab Dan Edmunds 23-February-2010.
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
TOF calibration Y. Karadzhov. Y. Karadzhov, MICE CM26 24 March Slide 2 TOF Calibration - Trigger TOF1 TOF 0 TOF 1 TOF 2 The blue line encloses the calibrated.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
14/1/20097 January 2009MICE CM23 - Harbin - Beamline Session1 MICE Beamloss Data Adam Dobbs.
Tracker Software Update Adam Dobbs, MICE CM37 7 th Nov 2013.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
VC MICO Report July 07Jean-Sébastien GraulichSlide 1 Main news  DAQ test bench running in Geneva 2 LDCs connected to 2 different PCs, 1 GDCs DAQ trigger.
24/03/2011P.-A. Loizeau – Univ. Heidelberg The CBM Time of Flight wall electronic readout chain Pierre-Alain Loizeau PI – Uni Heidelberg DPG 2011, Münster.
IceTop Tank Calibration Abstract This report outlines the preliminary method developed to calibrate IceTop tanks using through going single muon signals.
HCAL1 Status 2003 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance 2003 General design High Voltage system LED monitoring 2. Tests in muon halo beam.
Diana Parno – July 22, 2008 January PREx Test Run: Compton Photon Analysis Diana Parno Carnegie Mellon University HAPPEX Collaboration Meeting.
14/02/2007 Paolo Walter Cattaneo 1 1.Trigger analysis 2.Muon rate 3.Q distribution 4.Baseline 5.Pulse shape 6.Z measurement 7.Att measurement OUTLINE.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
Status of Møller Polarimeter Peter-Bernd Otte September 23, th Collaboration Meeting, Mainz.
Tracker Timing and ISIS RF Edward Overton 1. At CM32… 2 Had done some preliminary checks on the ISIS RF. Was beginning to think about how to handle the.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
Online Reconstruction 1M.Ellis - CM th October 2008.
MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
G4Beamline Simulated Electron Distribution within the HPRF Cavity 2/15/20121.
The ZDD data structure Each ZDD channel produces a positive “waveform”, one 8-bit sample every 2 ns This waveform is then splitted in “fragments”: a sequence.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
Anatoli Romaniouk TRT Test manual Some important information p. 2-3Some important information p. 2-3 Noise studies p.4-7Noise studies p.4-7 Operation with.
EMR detector lying beam-face up in Geneva workshop.
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
M. Bonesini – CM 291 PID detectors summary M. Bonesini Sezione INFN Milano Bicocca.
DAQ deadtime memo Kaz, Grass 2012/01/04 1. Current dead time Dead time measured on 2011/09/29  With TDCmax=4, Deadtime =350 us  With TDCmax=8, Deadtime.
AMS Software Review ACC DAQ Monitoring Ch Chung, A. Goerres, Th. Kirn I. Phys. Institute B, KSC, 31st January 2011.
M. Bonesini - CM 22 RAL October 081 TOF0 status M. Bonesini Sezione INFN Milano Bicocca.
15-Aug-08DoE Site Review / Harvard(1) Front End Electronics for the NOvA Neutrino Detector John Oliver, Nathan Felt, Sarah Harder Long baseline neutrino.
Khaled Belkadhi (LLR-Ecole Polytechnique)1 DHCAL Test Beam Results using Full Train Reconstruction Khaled Belkadhi.
1 Outline First look at the 2007 data with the offline reconstruction (~1000evts) : –Clusters. –Reconstructed Space points. FastOffline plots: –2 differents.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
1M. Ellis - MICE Tracker PC - 1st October 2007 Station QA Analysis (G4MICE)  Looking at the same data as Hideyuki, but using G4MICE.  Have not yet had.
Monte Carlo simulation of the particle identification (PID) system of the Muon Ionization Cooling Experiment (MICE) Mice is mainly an accelerator physics.
V.Duk, INFN Perugia1 CHOD TDAQ status and rates Viacheslav Duk, INFN Perugia On behalf of the CHOD working group.
TRTViewer: the ATLAS TRT detector monitoring and diagnostics tool 4 th Workshop on Advanced Transition Radiation Detectors for Accelerator and Space Applications.
20 April 2007MICE Tracker Phone Meeting1 Analysis of cosmic/self-triggerd data of station 5 Hideyuki Sakamoto MICE Tracker Phone Meeting 20 th April 2007.
MAUS Status and Plans Chris Rogers, ASTeC, Rutherford Appleton Laboratory.
by students Rozhkov G.V. Khalikov E.V. scientific adviser Iyudin A.F.
Jean-Sebastien Graulich, Geneva
MDT and analog FEE mass production:
Beam Gas Vertex – Beam monitor
Hall C KPP Demonstration March 10, 2017.
Sergey Abrahamyan Yerevan Physics Institute APEX collaboration
Beam Test Results for the CMS Forward Pixel Detector
Beam Tests data vs Matlab simulations
Beam Tests data vs Matlab simulations
Presentation transcript:

Y. Karadzhov MICE MICO First EMR Plots 1.EMR detector has been successfully incorporated in the MICE DAQ system. 2.First 3 days of data taking in MICE Beam (30/06 – 02/07).

Y. Karadzhov MICE MICO Time distribution of the EMR hits Leading Edge Time of the EMR hits is shown in blue and the spill width (as measured by the DBB boards) is in read. All events in the run are accumulated. Left: time distribution of the EMR hits inside the spill window. Right: zoom over the end of spill.

Y. Karadzhov MICE MICO Typical event The time of the EMR hits is in blue, the time of the Particle Trigger signal (as measured by the DBB boards) is in red. 31 Particle Triggers in this event.

Y. Karadzhov MICE MICO Not so complicated event Only 4 Particle Triggers in this event. Even in this event we can’t associate the EMR hits with some of the received Particle Trigger signals.

Y. Karadzhov MICE MICO Conclusions First EMR data tacking exploiting the MICE DAQ system and MICE Beam channel was successful. All components of the detector and the electronics performs as expected. The data unpacking software was debugged and now gives reasonable results. Long way until the complete understanding of the detector is ahead. Suggestion: it may be useful to have data with only one Particle Trigger per spill.