/faculteit technologie management CPN 2005 Business Process Redesign at a Mental Healthcare Institute: A Coloured Petri Net Approach M.H. Jansen-Vullers.

Slides:



Advertisements
Similar presentations
ARTIFICIAL INTELLIGENCE [INTELLIGENT AGENTS PARADIGM] Professor Janis Grundspenkis Riga Technical University Faculty of Computer Science and Information.
Advertisements

ICIS-NPDES Plugin Design Preview Webinar ICIS-NPDES Full Batch OpenNode2 Plugin Project Presented by Bill Rensmith Windsor Solutions, Inc. 3/15/2012.
Automatic Model Transformation for Enterprise Simulation
A Blended Curriculum for Bermuda Public Primary Schools
1 Analysis of workflows : Verification, validation, and performance analysis. Wil van der Aalst Eindhoven University of Technology Faculty of Technology.
The Zebra Striped Network File System Presentation by Joseph Thompson.
Mariska Netjes, Wil M.P. van der Aalst, Hajo A. Reijers - Analysis of resource-constrained processes with Colored Petri Nets CPN Workshop 2005 Analysis.
XML Documentation of Biopathways and Their Simulations in Genomic Object Net Speaker : Hungwei chen.
CPN'021 Coloured Petri Nets in UML-Based SW Development – Designing Middleware for Pervasive Healthcare Jens Bæk Jørgensen Centre for Pervasive Computing.
Revised by Ivor Perry Sept From Flow Charts to UML - 1.
/faculteit technologie management CPN 2006 Modeling Business Processes with CPN R.S. Mans.
1 Workflow Management Systems : Functions, architecture, and products. Wil van der Aalst Eindhoven University of Technology Faculty of Technology Management.
Performance Analysis and Monitoring Facilities in CPN Tools Tutorial CPN’05 October 25, 2005 Lisa Wells.
/faculteit technologie management Business Process Simulation A Tool Survey Monique Jansen-Vullers Mariska Netjes.
A 14← department of mathematics and computer science PROSE Checking Properties of Adaptive Workflow Nets K. van Hee, I. Lomazova, O. Oanea,
/faculteit technologie management Steps Towards Formal Verification of Agent-based E-Business Applications Nick Szirbik & Gerd Wagner Eindhoven University.
The BIM Concept Drawings, building views, visualizations, calculations and quantity take-offs are automatically derived from the 3D model. BIM= Building.
TimeCleanser: A Visual Analytics Approach for Data Cleansing of Time-Oriented Data Theresia Gschwandtner, Wolfgang Aigner, Silvia Miksch, Johannes Gärtner,
/faculteit technologie management DEMO CPN-tools Ronny Mans Eindhoven University of Technology, Faculty of Technology Management, Department of Information.
Modeling Worldviews Event Scheduling – Event Graphs State Machines Activity Scanning – Event Graphs and Petri Nets Process Interaction – Event Graphs and.
/faculteit technologie management 1 Process Mining: Extension Mining Algorithms Ana Karla Alves de Medeiros Ana Karla Alves de Medeiros Eindhoven University.
Future Plans for CPN Tools - General. 2 Plans for CPN Tools CPN’0624-Oct-2006 Version plans Improvements for current marking feedback Support for.
Principle of Functional Verification Chapter 1~3 Presenter : Fu-Ching Yang.
1 CPN Tools Future work. 2 Overview Language extensions Manual simulation Analysis techniques Editing Other.
A university for the world real R © 2009, Chapter 17 Process Mining and Simulation Moe Wynn Anne Rozinat Wil van der Aalst Arthur.
A university for the world real R © 2009, Chapter 23 Epilogue Wil van der Aalst Michael Adams Arthur ter Hofstede Nick Russell.
Introduction to BIM BIM Curriculum 01.
Comparing Python and Visual Basic
Scenario testing Tor Stålhane. Scenario testing – 1 There are two types of scenario testing. Type 1 – scenarios used as to define input/output sequences.
Włodzimierz Funika, Filip Szura Automation of decision making for monitoring systems.
Session 8-1 Session 8 The Power and Flexibility of EDExpress.
IBM Software Group © 2003 IBM Corporation April 7, 2004 WebSphere Business Integration Monitor Development Lifecycle WebSphere Business Integration.
Medical Audit.
1 Workflow Management Systems : Functions, architecture, and products. Wil van der Aalst Eindhoven University of Technology Faculty of Technology Management.
/ Copyright © Siemens AG All rights reserved. Corporate Technology Performance Prediction of Client-Server Systems by High-Level Abstraction Models.
Logarithmic Functions Integrated Math 4 Mrs. Tyrpak.
Standards for Mathematical Practice #1 Make sense of problems and persevere in solving them. I can: explain the meaning of a problem. choose the right.
Workflow Treatment with Coloured Petri Nets Alexandru Cicortaş Diana
Workflow/Business Process Management Introduction business process management and workflow management Wil van der Aalst Eindhoven University of Technology.
Thomas Dreibholz Institute for Experimental Mathematics University of Duisburg-Essen, Germany University of Duisburg-Essen, Institute.
Controls design Controls are “the plan of organization and all the methods and measures to safeguard its assets, check the accuracy and reliability of.
LRS Progress Report and Action Plan Update to the Profiling Working Group July 24, 2006.
Ch8. Analysis Joosung, Ko.
1 SVG for Process Visualization Johan Koolwaaij Peter Fennema Diederik van Leeuwen Telematica Instituut The Netherlands.
Towards a Process Oriented View on Statistical Data Quality Michaela Denk, Wilfried Grossmann.
ISA 95 Working Group Process Centric Exchanges Gavan W Hood July 23, 2015 GWH 2.1.
Standby-redundancy-models.PPT Building Standby Redundancy Models Last revised 12/06/2006.
From Natural Language to LTL: Difficulties Capturing Natural Language Specification in Formal Languages for Automatic Analysis Elsa L Gunter NJIT.
Using Workflow With Dataforms Tim Borntreger, Director of Client Services.
Prepared by: Basem Al Mestadi ID#  What is flow Chart  Real work Example  Flow Chart  Conclusion.
/faculteit technologie management PN-1 مهندسی مجدد فرآیندهای تجاری بخش دوم: مدلسازی فرآیندها به کمک Petri nets.
Second Model: “Model2”. What You Will Learn  How to build a simple layout  How to connect ports for routing flowitems  How to detail and enter data.
V7 Foundation Series Vignette Education Services.
M ODELING AND M ONITORING V ARIABILITY IN H OSPITAL T REATMENTS – A S CENARIO USING CMMN Nico Herzberg, Kathrin Kirchner, and Mathias Weske September 8,
Tool Support for Testing Classify different types of test tools according to their purpose Explain the benefits of using test tools.
Simulation study: waterfall approach Phases: - Requirements analysis - Model construction (conceptual) - Model implementation (tool) - Validation & Verification.
SAP GRC(Governance Risk and Compliance)/SECURITY ONLINE TRAINING  Magnific Name : SAP GRC/SECURITY 24*7 Technical support  faculty : Real time Experience.
1 Compare Versions of MS Project File Guy Gaudreault, PMP MPA – Montreal Chapter October 11, 2006.
5th Shire River Basin Conference 22 February 2017 Shire River Basin Management Project Shire Basin Planning Tool Sub-Component A1 Development of a.
Databases and DBMSs Todd S. Bacastow January 2005.
Klara Nahrstedt Spring 2009
Software Architecture in Practice
Advance Software Engineering
BUSINESS PLUG-IN B2 BUSINESS PROCESS.
Chapter 10 Verification and Validation of Simulation Models
Evaluating Transaction System Performance
Workflow/Business Process Management Introduction business process management and workflow management.
Census innovations in Italy and their technological implications
Applying Use Cases (Chapters 25,26)
Presentation transcript:

/faculteit technologie management CPN 2005 Business Process Redesign at a Mental Healthcare Institute: A Coloured Petri Net Approach M.H. Jansen-Vullers H.A. Reijers

/faculteit technologie management CPN 2005 Goal of the project Testing applicability of CPN Tools for BPR Criteria: –Modeling of a business process –Simulation of a business process –Redesign (modeling and comparison of scenario’s) –Understandability/communication purposes

/faculteit technologie management CPN 2005 Modeling the control flow

/faculteit technologie management CPN 2005 Notifications Answer, record, store, print, check patient file

/faculteit technologie management CPN 2005 Subpage ‘Assign’

/faculteit technologie management CPN 2005 Subpage ‘Intake’

/faculteit technologie management CPN 2005 Modeling resources 5 types of resources Modeled as lists in fusion places Working part-time: resting and resets necessary

/faculteit technologie management CPN 2005 Modeling time triggers (1)

/faculteit technologie management CPN 2005 Modeling time triggers (2)

/faculteit technologie management CPN 2005 Simulation Stochastic duration of transitions –Uniform, beta and exponential distributions Smaller unit of time in the model –Precision due to rounding of real values in time stamps Measurements –Flow time –Service time

/faculteit technologie management CPN 2005 Generating cases Color PAT = product ID * ST * CT * filetype;

/faculteit technologie management CPN 2005 Application of Monitors fun obsBindElem (determine_treatment'close_intake (1, {i, ct, id, spv, st, doc, file, tl0})) = IntInf.toInt(time())-(st) fun obsBindElem (determine_treatment'close_intake (1, {i, ct, id, spv, st, doc, file, tl0})) = ct

/faculteit technologie management CPN 2005 Simulation results

/faculteit technologie management CPN 2005 Redesign (example)

/faculteit technologie management CPN 2005 Simulation results - comparison

/faculteit technologie management CPN 2005 Conclusion - applicability –Modeling of a business process YES, but hard work! –Simulation of a business process YES, and monitors very helpful! –Redesign (modeling and comparison of scenario’s) Yes –Understandability/communication purposes ?? Models very complex for process owners…

/faculteit technologie management CPN 2005 Tool comparison (1) Protos –Only 24 transactions, but no simulation Workflow tools (e.g., Staffware, FileNet) –No configuration possible for measurements –No notion of reliability Arena (Rockwell) –Focus on standard building blocks (modeling support) –Drawback: expressive power

/faculteit technologie management CPN 2005 Tool comparison (2) ExSpect and CPN Tools +CP nets: expressive power, mathematical foundation, analysis techniques, reliability of simulation results +Extensions possible in GCL or ML –Difficult to understand by business users –Weak in modeling support

/faculteit technologie management CPN 2005 Tool comparison (3) ExSpect +Scripts hide some of the details +Number of building blocks already available +Soundness checks in Woflan CPN Tools +Performance during simulations (interactive evaluation with process owners)

/faculteit technologie management CPN 2005 Conclusion… bridging the gap! Modeling control flow is ok Hiding some standard requirements for modeling business processes necessary –Handling of resources –Handling of batches –Modeling triggers –Calculating flow time and service time

/faculteit technologie management CPN 2005 Thank you for your attention ! Questions ??