P08428 LED Lighting Technologies for a Sustainable Entrepreneurial Venture Team Members Sponsor: RIT Facilities Management Services Shawn RussellProject.

Slides:



Advertisements
Similar presentations
Gen 2 IC LED Downlight Overview 11/1/10.
Advertisements

< C ² Carbon Reduction Technology Ltd A Revolution in Lighting - The e-lamp.
Design Constraints For Engineering Projects
EGEE 102 – Energy Conservation And Environmental Protection Energy Efficient Lighting.
2010 Energy OutWest Reno, Nevada 12-Mar-10 Baseload Electricity quantify, address, manage 2a) Lighting baseload: effective & efficient use to shape & affect.
P1 Energy and Electricity (1) The rate at which an object transfers energy depends upon 1.surface area 2. material object is made from 3. Surface type.
PERFORMING EFFECTIVE BUILDING SYSTEM RECOMMISSIONING STUDIES Joseph J. Watson, P.E. Booth # 312.
Energy Efficiency 4/29/2015 Lighting Akrem Awad 1.
Exhaust Heat Recovery Systems
400 Watts Metal Halide (455 Watts with ballasts) Pendant mount 22’ from the floor Six 4’, T8 lamps per fixture: 224 Watts (with ballasts) Mounted on the.
PNM Energy Efficiency Business Rebates for Facility Managers Retrofit Rebate Opportunities July 13, 2010.
Our Product: The BestCore™ Series Uses Philips Lumileds LEDs Over 100,000 hours life span Instant on, no start-up time High lumens per watt, making it.
Energy retrofit solution for 400w MH Highbays!! Question:How many fixture lumens do you need to replace one 400w MH highbay? Answer:About 20,000 lumens.
DESIGN THAT MATTERS Energy Efficient Stove Innovator – Mr. Prakash. Guide - Saleem Ahmed Students – Christy, Divya, Nived, Kishor, Puttaraj Energy Efficient.
| 1 © 2013 Universal Lighting Technologies ULT Marketing LED Product Capabilities.
Connecticut’s Energy Future Removing Barriers to Promote Energy Sustainability: Public Policy and Financing December 2, 2004 Legislative Office Building.
Energy, Society, and the Environment Unit 3 Energy Economics.
P08456-LED Lighting for an Underwater ROV Jeremy Schiele-Project Manager Jonathan Lent-Mechanical Engineer Ryan Seeber-Computer Engineer Justin VanSlyke-Mechanical.
R I T Advisors: Dr. Wayne WalterMechanical Engineering Dept. Faculty Jeffrey WebbTeacher’s Assistant Team Members: Aman Verma EE - Electrical Craftsman.
EPA Solar Oven Project #05301 Preliminary Design Review February 18, 2005.
NUMERICAL ANALYSIS OF UNIFORM SEMI-POROUS HEAT SINK FOR CHIP THERMAL MANAGEMENT Eric Savery.
ASIA CLEAN ENERGY FORUM “Energy Management Initiatives in Production Facility ” C. M. S. M. Fazvi Certified Energy Manager (Sri Lanka Sustainable.
BAE SYSTEMS DESIGN PROJECT: DAYLIGHTING TECHNIQUES/ AFTERNOON DE-”LIGHT” EDSGN 100 Sec. 6 Team 3: David Young, Robert Vadella, Victoria Rodriguez, Phil.
Grocery Measure: LEDs for Reach-In Display Cases Regional Technical Forum July 21 st, 2015 Mohit Singh-Chhabra.
Renewable Technologies Available in Ireland Paul Kane.
MANUFACTURING PROTOTYPE How do all the aspects of manufacturing come together to make a final product?
Ian Frank Matt Walter Jesse Steiner Luke Spencer Mike Celentano Nick Balducci Team Lead Chief Engineer Electrical Engineer Industrial Engineer Electrical.
Alarm Sounds When Refrigerator Door Remains Open Too Long Design Review 1 By Chi-Weng Kam Dan Strengier May 20, 2009.
Bicycle Harvesting Waste Energy: Bicycle Power Generation MSD-I RIT-Systems Design Review Winter/Spring P12414 January 13, 2012 Group # P12414.
2009 CAMPUS LIGHTING RETROFIT FORUM Laboratory Lighting Controls Upgrade New Laboratory Building Biological Sciences 3 Beat Title 24 Energy Standard by.
Sustainable Lighting Parking Garage ECO Parking Lights and INFINITI Energy Partners.
Chapter 9: Earth’s Resources and Environmental Protection
UAF research leads to inventions Invention Disclosures by Year.
SUSTAINABILITY What Does it Mean for Civil Engineers? Developed by Yvette Pearson Weatherton, Ph.D., P.E. This work was supported by a grant from the National.
Energy Efficiency in Industrial and Commercial Facilities 2003 Energy and Environmental Conference September 16, 2003.
The Science and Economics of Energy: Learning about Solar Energy.
Co- and Poly- generation Martin Hannemann Andi Prah Nuri Feichtinger Paul Polterauer.
Lecture No 111 Fundamentals of Metal removal processes Dr. Ramon E. Goforth Adjunct Professor of Mechanical Engineering Southern Methodist University.
ENERGY EFFICIENT LIGHTING Ver LED High Mount Area Light.1.1 LED HIGH MOUNT AREA LIGHT Using just 30 watts, the LED High Mount Area Light replaces.
LED Case Lighting in Vertical and Semi-Vertical Open Refrigerated Cases Eric Mullendore – Energy Analyst PECI 6/29/2010.
DAC PROJECT Capacity Building in Balcan Countries for the Abatement of Greenhouse Gases Setting priorities for GHG emissions’ reduction George Mavrotas.
Saving Energy and Improving Light Quality in Street Lighting P K Mukherjee Amit Khare CLASP Applications of the SEAD Street Lighting Tool Clean Energy.
Ian Frank Matt Walter Jesse Steiner Luke Spencer Mike Celentano Nick Balducci Team Lead Chief Engineer Electrical Engineer Industrial Engineer Electrical.
COURTNEY WALSH (ME) IAN FRANK (ME) MATT BENEDICT (ME) SHAWN RUSSELL (ME) WIN MAUNG (ME) NARESH POTOPSINGH (ME) Project Plan Presentation P0842X – LED Lighting.
Renewable and Non-Renewable Energy. There are two types of energy sources: Renewable and Non-renewable.
Phil Munsey, Facilities Energy Engineer Plant 17 Lighting Energy Reduction Project.
World energy production by source in 2004: Oil 40% coal 23.3% natural gas 22.5% hydroelectric 7.0% nuclear 6.5% biomass and other 0.7%.
CALCULATING PAYBACK PERIOD. Formula Payback Period = Initial Investment Net annual savings + Income.
POSITIVE AND NEGATIVE EFFECTS OF ENGINEERING. Cans Positive Low cost for the manufacturing process Recyclable Negative Aluminum might cause cancer and.
CenterPoint Energy Street Light Luminaire Replacement LED Street Light Conversion Program August 27, 2015.
Energy Conservation Building Upgrades Alma School District.
BIOMASS SUPPORTED SOLAR THERMAL HYBRID POWER PLANT
Urban Lighting Group manufactures advanced luminaries to optimize lighting performance and reduce energy consumption. Our use of Cree&™ LED outdoor lighting.
Lighting Terminology 1 PATRICK DAVIS, ORION ENERGY SYSTEMS.
Town of Mountain Village Lighting Projects. ICAST Mission To provide economic, environmental, and social benefits to communities in a way that builds.
What is an LED? A light-emitting diode, or LED, is a compound semiconductor device that converts electricity into light. One of more LEDs combined with.
JP Bedell SDA Lighting
Energy year 2015 District Heat.
Calculating Payback Period
Team Members Shawn Russell Project Manager David Eells
LIGHTRUSS Size 2 LED.
3E Plus Program Software Insulation Thickness Calculator
Regional Sales Manager
Regional Sales Manager
Regional Sales Manager
Light Distribution Model (Trace-Pro)
P07421 Sustainable Energy Wind Powered Parking Lot Light.
Regional Sales Manager
Engineering Materials 27
[PLACEHOLDER FOR DISTRIBUTOR LOGO]
Presentation transcript:

P08428 LED Lighting Technologies for a Sustainable Entrepreneurial Venture Team Members Sponsor: RIT Facilities Management Services Shawn RussellProject Manager David EellsMechanical Engineer Taylor ShivellMechanical Engineer Arthur DeaneElectrical Engineer Phil PietrantoniElectrical Engineer Christine LagreeIndustrial Engineer

Agenda Project Description & High Level Customer Needs (Shawn) Project Description & High Level Customer Needs (Shawn) Design Concept (Taylor) Design Concept (Taylor) System Design, Analysis and Testing System Design, Analysis and Testing – Light Output (David) – Fixture Lifetime – Color of Light (Arthur) Manufacturing Plan (Christine) Manufacturing Plan (Christine) Economic Analysis & Sustainability (Christine) Economic Analysis & Sustainability (Christine) Remaining Improvements and Tasks (Shawn) Remaining Improvements and Tasks (Shawn) Questions Questions

Project Description Create a new walkway lighting system with the use of LEDs to: Create a new walkway lighting system with the use of LEDs to: Reduce power consumption Reduce power consumption Increase replacement interval Increase replacement interval Primary market is RIT Facilities Management Services Primary market is RIT Facilities Management Services Current annual cost to maintain and power 125 residential lights: $10,020 Current annual cost to maintain and power 125 residential lights: $10,020 Customer NeedsEngineering Specifications Provide as much light as current system Minimum of ½ ft-cd on walkway (spread of 80’x12’) Long lifetime of fixtureDesign for 30 years Color temperature & CRI comparable to metal halide Color temperature between 3500K- 5400K, CRI > 70

Design Concept Replace internal components of existing fixture with LED retrofit assembly Replace internal components of existing fixture with LED retrofit assembly Use 5 individual circuit boards to angle the light where it is needed Use 5 individual circuit boards to angle the light where it is needed Use simple design to direct light while minimizing component and assembly cost Use simple design to direct light while minimizing component and assembly cost

Light Output Analysis Ray-tracing software (TracePro) used to optimize design Ray-tracing software (TracePro) used to optimize design – Geometry of internal fixture components – Reflector design – Placement of LEDs – Lens configuration Plot shows a minimum of 0.5 foot-candle over entire area. Plot shows a minimum of 0.5 foot-candle over entire area. Plot assumes three fixtures spaced 80’ apart. Plot assumes three fixtures spaced 80’ apart.

Light Output Testing Small scale tests with 1 – 5 LEDs to determine: Small scale tests with 1 – 5 LEDs to determine: – Number of LEDs – Wattage of LEDs – Optics – Verify software models Photometry Testing Photometry Testing – Individual LEDs and Lens combinations tested to determine validity of datasheets Full scale light output on assembled prototype Full scale light output on assembled prototype – Prove software models – Verify that specifications were met

Fixture Lifetime Reduce maintenance costs Reduce maintenance costs Two Components: Two Components: – Fixture Lifetime Corrosion resistant components used to prevent premature failure Corrosion resistant components used to prevent premature failure Existing fixture housing re-used Existing fixture housing re-used – LED Lifetime & Ease of Replacement LEDs have a lifetime of 50,000 hrs LEDs have a lifetime of 50,000 hrs Each PCB can be easily removed when needed Each PCB can be easily removed when needed Thermal, environmental, and vibration testing were completed Thermal, environmental, and vibration testing were completed

Light Color/CRI Low color rendering index (CRI) indicates poor distinction between colors viewed under that light Low color rendering index (CRI) indicates poor distinction between colors viewed under that light Color temperature should be close to existing metal halide fixtures Color temperature should be close to existing metal halide fixtures – Not too blue, not too yellow Color temperature and CRI are properties of the LEDs, so LEDs were chosen with this in mind Color temperature and CRI are properties of the LEDs, so LEDs were chosen with this in mind A questionnaire was used to judge the CRI of the light from the LEDs and aesthetic appeal of the light color A questionnaire was used to judge the CRI of the light from the LEDs and aesthetic appeal of the light color

Power Analysis & Testing Current Metal Halide fixtures use 160 Watts Current Metal Halide fixtures use 160 Watts LED fixture uses 60 Watts LED fixture uses 60 Watts

Thermal Analysis & Testing Each circuit board was analyzed to determine the size and spacing requirements Each circuit board was analyzed to determine the size and spacing requirements Aluminum was laminated to the back of the boards to improve heat transfer Aluminum was laminated to the back of the boards to improve heat transfer More surface area was added to the back plate to dissipate added heat More surface area was added to the back plate to dissipate added heat Transformers were placed on their own mounting plate, away from the LEDs to distribute heat Transformers were placed on their own mounting plate, away from the LEDs to distribute heat Thermal tests were performed to further optimize the design and prove the FEA models Thermal tests were performed to further optimize the design and prove the FEA models – Temperature measured at several points – Large changes in temperature were examined and corrected

Summary of Testing TestPass/FailComments Light OutputPass EnvironmentalPass ThermalPass Light Color/CRIPass Power ConsumptionPass

Manufacturing Plan

Economic Analysis Budget for prototypes Budget for prototypes – Total of 3 prototypes: $ shipping Initial prototype cost – one fixture Initial prototype cost – one fixture – Initial investment per kit: $ Retrofit scenario – 125 fixtures Retrofit scenario – 125 fixtures – Approximate sale price per fixture: $430 – Total initial investment: $58,732 – Annual savings: $8,049 Energy savings: $3,777 Energy savings: $3,777 Labor and material savings: $4,600 Labor and material savings: $4,600 – Payback period: 7.3 years – Rate of return: 13.7%

CO 2 Emissions LEDMH kWh/year/fixture kWh for 125 fixtures32, , Annual lbs/kWh/fixture Annual lbs/kWh/125 fixtures38, , lbs/kWh for NY0.86 lbs/kWh for Hess/RIT Fuel Sources: Hess Biomass<1% Coal31% Gas23% Hydro11% Nuclear23% Oil12% Solar0% Solid Waste<1% Wind<1% Sustainability

Remaining improvements & tasks

Questions