Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.

Slides:



Advertisements
Similar presentations
Fall Protection Falls 4,628 fatal work injuries were recorded in the United States in deaths a week or 12 deaths every day 806 construction related.
Advertisements

3 rd Harmonic He Vessel Welding Helium Vessel-to-Cavity No June 2008.
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
A Free Jet Hg Target Operating in a High Magnetic Field Intersecting a High Power Proton Beam Van Graves, ORNL P. Spampinato,T. Gabriel, ORNL H. Kirk,
MERIT Hg System Design V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Review Meeting Brookhaven National Laboratory Dec 12, 2005.
NTOF11 Hg System Design Status Van Graves Tony Gabriel, Phil Spampinato Collaboration Meeting – Princeton University Apr 2005.
Titan-izing the Target Module V.B. Graves 16 Dec 2005.
Moving Armor Target (MAT) Track Jacob Feist Cleon Stanley Thomas Hutton Sladana Lazic 03/30/2006.
AB/ATB-EA ML, le 30/03/071 MERIT INSTALLATION. AB/ATB-EA ML, le 30/03/072 MERIT INSTALLATION Total supported weight Solenoid: 5500 kg (12000 lbs) Hg System.
MERIT Hg System Final Design Review Hg Target System Design Interfaces V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma.
FDR Station 3 lift fixture, laser screens and brackets T. Brown and L. Morris with analysis support from A. Brooks December 3, 2007.
Target System Transportation and Decommissioning P.T. Spampinato V.B. Graves Hg System Safety Review CERN June 19-20, 2006.
Hg System Design V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
High Power Hg Target Conceptual Design Review Hg Jet Nozzle Analysis M. W. Wendel Oak Ridge National Laboratory February 7-8, 2005.
MERIT Collaboration Meeting ISSUES RELATING TO THE Hg-JET TARGET SYSTEM P.T. Spampinato V.B. Graves T.A. Gabriel Princeton University November 17, 2005.
MERIT Hg System Design Update V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting Princeton University Nov 17-18, 2005.
By: Joseph Martinez University of Michigan Supervisor: Dave Pushka, NuMI Project 3Q120-M Quadrupole Magnet Transport.
N UCLEAR S CIENCE AND T ECHNOLOGY D IVISION O AK R IDGE N ATIONAL L ABORATORY U.S. D EPARTMENT OF E NERGY Muon Collider-Neutrino Factory Collaboration.
High Power Hg Target Conceptual Design Review Hg Target System Cost Estimate V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February.
CERN Hg Jet System V.B. Graves P.T. Spampinato T.A. Gabriel MUON Collaboration Meeting Lawrence Berkeley National Laboratory February 16, 2005.
Mercury Nozzle Status V.B. Graves Hg Jet Design Meeting Princeton University Nov 15, 2004.
High Power Hg Target Conceptual Design Review Hg Target System Controls V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February.
MERIT Beam Collimator Design Nicholas Olesen 9 August 2006.
High Power Hg Target Conceptual Design Review Hg Target Design P.T. Spampinato V.B. Graves T.A. Gabriel Oak Ridge National Laboratory February 7-8, 2005.
N UCLEAR S CIENCE AND T ECHNOLOGY D IVISION O AK R IDGE N ATIONAL L ABORATORY U.S. D EPARTMENT OF E NERGY Muon Collider-Neutrino Factory Collaboration.
MERIT Hg System Final Design Review Hg Target System Design V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science & Fusion.
MERcury Intense Target (MERIT) Overview Van Graves, ORNL Syringe Procurement Kickoff Meeting Airline Hydraulics Bensalem, PA Oct 28, 2005.
Hg System Status V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting October 20, 2006.
Mercury Catcher Status V.B. Graves Hg Jet Design Meeting Princeton University Nov 15, 2004.
High Power Hg Target Conceptual Design Review Hg Target Interface with Solenoid V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory.
Hg System Decommissioning V.B. Graves P.T. Spampinato CERN Feb 7-8, 2008.
MICE Collaboration Meeting March 29 - April 1, CERN MICE Integration Edgar Black/IIT March Room.
High Power Hg Target Conceptual Design Review Design Requirements, Interfaces, and Schedule P.T. Spampinato V.B. Graves T.A. Gabriel Oak Ridge National.
Target System Operations and Hg Handling P.T. Spampinato V.B. Graves MERIT Hg System Safety Review CERN June 19-20, 2006.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
High Power Hg Target Conceptual Design Review Equipment Installation at CERN V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February.
Water Tests of Hg System V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting Dec 8, 2006.
Target Design Meeting Nozzle & Hg Collection Tests, Design Requirements, Instrumentation, Containment, Windows, Diagnostics, Controls, Base Support Structure,
Michael Brantley 2, Ryan Ferm 2, Nadia Siddiqui 2, Jason Newton 1, Reginald Scott 1 1 Department of Mechanical Engineering, Florida State University, Tallahassee,
Fall Protection in the Roofing Industry
NTOF11 Collaboration Meeting Non-Design Issues for the Mercury Jet Target P.T. Spampinato V.B. Graves T.A. Gabriel Princeton University April 29-30, 2005.
MERIT Hg System Final Design Review Hg Target System Operations V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
Summary of Hg System Review at CERN Van Graves 13 Sep 2005.
SOL-GEL COATING FACILITY CONCEPTUAL DESIGN REVIEW October 19, 2005.
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
Transport and handling at CERN for FAIR
ZDC Remote Handling Tool Structure and Force Analysis P. Debbins University of Iowa December 10, 2009.
MERIT Hg System Final Design Review Hg Target System Controls V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science &
Fire Hazards Analysis the ORNL Approach Jeff Sipes Fire Protection Engineer April 17, 2007.
Transport of the CLIC Modules and Elements CLIC Workshop October 2007 Two Beam Hardware and Integration Working Group Keith Kershaw (CERN)
Transport and Handling (T&H) considerations for HL-LHC
OPTICAL TOOLING Survey & Alignment. O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 2 Title_date OPTICAL INSTRUMENTATION AND TERMINOLOGY.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
Planning for Proto-DUNE PD Installation and Cabling at CERN
CLIC Handling Engineering Update
ProtoDUNE – DSS Installation, Alignment and QA
SBN Far Detector Installation & Integration
Escalator Installation
Present status of the flux return yoke design
MICE Partial Return Yoke Mechanical Design
A very first look at siting issues
Subpart M Fall Protection.
MERIT Beam Collimator Design
Presentation transcript:

Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 2 Hg System Safety Review June 2006 Outline  Baseplate descriptions  Design overview  Handling and installation

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 3 Hg System Safety Review June 2006 Baseplates  Purpose – provide mobility, alignment, and structural support for experiment components  Experiment requires magnet tilt of 3.8° and elevation ~ 50cm  Four structures  Common baseplate  Target transporter  Target cart  Magnet support beam  Primarily fabricated from AL6061-T6

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 4 Hg System Safety Review June 2006 MERIT Equipment

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 5 Hg System Safety Review June 2006 Target Transporter  Transports target cart and Hg system inside tunnel using rollers  Rails for target cart wheels  Jack brackets prevent rolling  Swivel hoist rings for lifting & cart tie-down  Structure shares common baseplate design but is shorter & carries smaller load, so no separate analysis performed

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 6 Hg System Safety Review June 2006 Target Cart  Supports Hg system during all phases of experiment  Rollers allow transfer from transporter to common base during integration with magnet  Provides lateral movement of Hg system to maintain alignment with solenoid  Structural analysis performed – Appendix E

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 7 Hg System Safety Review June 2006 Hydraulic System Power Unit  Has built-in lift points for 4-point spreader

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 8 Hg System Safety Review June 2006 Common Baseplate  Supports solenoid and Hg system during experiment  Solenoid mobility platform during installation  Rollers used to grossly align solenoid to beam  Provides minor lateral movement of solenoid for alignment to beam Magnet Restraints Magnet Lateral Positioning Lifting Jacks Leveling Jacks Baseplate Lift Points Rollers Cart Restraints Anchor Brackets Tow Brackets

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 9 Hg System Safety Review June 2006 Baseplate Design Constraints & Requirements  Total supported weight  Solenoid: 5500 kg (12000 lbs)  Hg System with 23liter Hg: 1800 kg (4000 lbs)  Baseplate: 450 kg (1000 lbs)  Movement requires lateral force of 3.8kN (850 lbs) (μ s = 0.05 per roller vendor)  Maximum width of 1.3m (51") to meet CERN facility constraints  Fabrication material to be non-magnetic (chose AL 6061-T6)  Must have lifting provisions for unloaded baseplate

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 10 Hg System Safety Review June 2006 Common Baseplate Analyses  Multiple finite-element studies performed to simulate various loading scenarios  Transport rollers  Lifting brackets  Hoisting  Leveling feet  Results showed adequate design in all loading conditions simulated  Additional manual calculations performed on specific critical baseplate components  Baseplate lifting point welds  Hydraulic jacking bracket welds  Hg cart restraint brackets  Included in Appendix E

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 11 Hg System Safety Review June 2006 Magnet Support Beam  Elevating solenoid into beam line will put leveling jack near its limit of travel, affecting stability & limiting height adjustment  Beam is used as spacer to allow more adjustability with leveling jack  Material: AL6061

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 12 Hg System Safety Review June 2006 Components & Estimated Weights Approximate Dimensions Centimeters (inches) Est. Weight Kilograms (pounds) MERIT (fully assembled)406x119x165 (160x47x65)7250 (16000) Primary Containment356x81x74 (140x32x29)860 (1900) Secondary Containment396x107x135 (155x42x53)680 (1500) Base Support Structure320x127x30 (126x50x12)360 (800) Target Cart117x84x20 (46x33x8)80 (175) Target Transporter157x119x30 (62x47x12)160 (350) Magnet Beam Support127x25x18 (50x10x7)14 (30) Hydraulic Cart (w/o oil)172x102x152 (68x40x60)1000 (2200) Hydraulic Fluid Drum61dia x 97tall (24dia x 38tall)230 (500) Mercury Flask15dia x 30 tall(6dia x 12tall)34 (76) Solenoid1800x940x1250 (708x370x490)5440 (12000)

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 13 Hg System Safety Review June 2006 Proposed Method to Lower Equipment into TT2  Target transporter and common baseplate not designed to be hoisted while supporting other equipment  Requires wedge to provide horizontal landing site  Hg system follows same basic process, except placed on transporter 1. Baseplate on wedge 2. Solenoid on baseplate 3. Baseplate towed up slope with turtle 4. Wedge removed, traverse down TT2

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 14 Hg System Safety Review June 2006 Installation Sequence Part 1 Transport Hg SystemRemove RollersTransport Baseplate, Install Magnet Remove Rollers, Level MagnetRoll Hg System into MagnetAdd Rollers

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 15 Hg System Safety Review June 2006 Installation Sequence Part 2  Baseplate & magnet may go in beam line prior to Hg system insertion  Align magnet axis to beam (common vertical plane)  Hg system in position for transfer  Insert Hg system  Elevate and tilt to final alignment Roll System into Beam LineRemove RollersElevate & Tilt

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 16 Hg System Safety Review June 2006 Conclusions  Baseplate structures custom-designed for MERIT experiment  Provides mobility, support, and alignment functions  Includes features for handling and lifting  Numerous structural analyses performed  Method proposed for equipment installation into TT2A  Rigging equipment (straps, chokers, etc) to be provided by CERN  Final installation procedure determined by CERN Transport