John Wloch Wind-Aid Preliminary Design Review 1 April 2008 Andy CrutchfieldJames Gates Keri Macaulay David Rupp.

Slides:



Advertisements
Similar presentations
Microcomputer Circuits Prof Jess UEAB 2007 Designing a Microprocessor Chapter 1.
Advertisements

Basic Overview of Project Management and Life Cycle ACES Presentation T. Gregory Guzik January 21, 2003.
Lab 09: Performance Test 1 Advanced Energy Vehicle.
Cory Fulkerson (Project Manager) - Mechanical Engineer John Graham - Computer Engineer Clayton Hooks - Electrical Engineer O’Raphael Okoro - Electrical.
Revolutionary Technologies Group C1 Nicholas Arch, Nicholas Fraser, Robert Huth, Patrick Noble, Michael Toomey Preliminary Design Review March 20, 2008.
John Wloch Wind-Aid Critical Design Review 4/22/2008 Andy CrutchfieldJames Gates Keri Macaulay David Rupp.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Tuesday March 25, 2008.
John Wloch Wind-Aid Preliminary Design Review 19 February 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.
Preliminary Design Review HMS Bloodhound Matt Morris, Matt Prygoski, Jay Slaggert Fred Thwaites, Dan Zibton.
Week 3: End of Day P Progress Edge Organized page for ease of additional document addition Added New Documents.
Small-Scale Solar Power Solar Power Rangers ~ Rachel Paietta 10 April 2008.
Bad News Bots E2 Project Design Review 6 - 2/21/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
Bad News Bots E2 Project Design Review 8 – 4/3/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
John Wloch Wind-Aid Preliminary Design Review 26 February 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.
PDR: 3/27/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.
Interactive Xylophonic Keyboard Mini-Mozarts October 12, 2006 Gordon Farmer Michael Johnson Eric Laumann Bryan Marek Philip Moss.
John Wloch Wind-Aid Preliminary Design Review 8 April 2008 Andy CrutchfieldJames Gates Keri Macaulay David Rupp.
David H. Dowell Injector RF Design November 3, LCLS Injector RF Gun: Design, Fabrication & Tuning Plans D. H. Dowell,
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
Pinwheel Technologies (C3)
Preliminary Design Review Week 7 Group A3: HMS “Bloodhound” Matt Prygoski Matt Morris Jay Slaggert Fred Thwaites Dan Zibton Thursday March 20, 2008.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
PDR: 4/10/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
John Wloch Wind-Aid Preliminary Design Review 25 March 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.
A6: Team Rallye Potable Water Still Presented by: Full Group November 15, 2006.
Toteable, Potable Water A2 Nate Barbera Katie Kimar Ryan Reis Connie Slaboch.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday February 21, 2008.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
AME Senior Design Group E3: Hewlett-Packers February 26, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
AME Senior Design Group E3: Hewlett-Packers March 11, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Interactive Xylophonic Keyboard Mini-Mozarts November 9, 2006 Gordon Farmer Michael Johnson Eric Laumann Bryan Marek Philip Moss.
A6: Team Rallye Potable Water Still Presented by: Nicole Del Rey November 9, 2006 Nicole Del Rey Mike McConnell Tim Rodts Eric Sabelhaus.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Lab 08: AEV Design Analysis Tool Advanced Energy Vehicle (AEV)
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
First-Year Engineering Program Performance Test 1: Design Concept Comparisons Objective and Goals Lab Procedure Analysis Test Readiness Review.
Status Report #7 Portable Solar Power Supply Team# 13 Eric Camacho John Michael McLeod Ky Dinhquoc Nguyen Kelechi (Kc) Nwogu 03/23/2011.
Status Report #8 Portable Solar Power Supply Team# 13 Eric Camacho John Michael McLeod Ky Dinhquoc Nguyen Kelechi (Kc) Nwogu 04/06/2011.
John Wloch Wind-Aid Preliminary Design Review 11 March 2008.
Golf Swing Robot EE 486 Project Presentation College of Engineering and Technology Presented by Nasser Almarri.
E-Store System for MEHE Final status report Team #2 Sandeep, Vijay, Jennifer, Ali, Meghna April 6 th, 2007.
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
Status Report #5 Automatic Child Safety Gate: Corry Winslow Roger Battles Philip So Description: A telescoping gate with sensor technology through the.
April 1, 2007 Global Design Effort 1 Materials for S4 meeting Discussion of risks in BDS WP April 1, 2007.
AME Senior Design Group E3: Hewlett-Packers March 18, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Status Report #6 Portable Solar Power Supply Team# 13 Eric Camacho John Michael McLeod Ky Dinhquoc Nguyen Kelechi (Kc) Nwogu 02/28/2011.
CIR I Wind Generation in Alaska: A Case Study Update on the Fire Island wind project.
Improved Robotic Arm for Sensitivity Characterization of Occupancy Sensors Will Hedgecock Brian Auerbach John Sullivan.
Lab 07: AEV Design Analysis Tool Advanced Energy Vehicle (AEV)
ASPERA-3 Mar. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 3_25/ Page 1 Monthly Status Report Report due 3/25/00 Schedule statused.
Bangarang Musical Engineering University of Notre Dame Department of Aerospace and Mechanical Engineering Group Members: Roberto Ayala, Ryan Bradley, Pat.
Revolutionary Technologies Group C1 Nicholas Arch, Nicholas Fraser, Robert Huth, Patrick Noble, Michael Toomey Preliminary Design Review February 21, 2008.
Revolutionary Technologies Group C1 Nicholas Arch, Nicholas Fraser, Robert Huth, Patrick Noble, Michael Toomey Preliminary Design Review January 31, 2008.
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
John Wloch Wind-Aid Preliminary Design Review 5 February 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday, April 10, 2008.
AME Senior Design Group E3: Hewlett-Packers February 7, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
AME Senior Design Group E3: Hewlett-Packers (Robo-football Quarterback) March 27, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
© NOTES - Doc. Ing. Pavel Pivoňka, CSc. DC MOTORS ROTATING MACHINES - SAME CONSTRUCTION AS GENERATORS: MOTORIC RUN = 1 working status of DC machine SUPPLY.
ISCOM 471 Week 5 Learning Team Assignment Scheduling Across the Supply Chain Executive Summary and Presentation To purchase this material click below link.
BIM EXECUTION PLANNING PROCESS
LCLS Klystron Modulator AIP Sec 28 AIP Review Feb 2010
10/month is the present production rate 2 FTE + sporadic contributions
Load Balancing: List Scheduling
Team A.W.E.S.O.M.-O 4000 February 27, 2007.
BIM EXECUTION PLANNING PROCESS
Advanced Energy Vehicle
Load Balancing: List Scheduling
Pulsar Construction Schedule
Presentation transcript:

John Wloch Wind-Aid Preliminary Design Review 1 April 2008 Andy CrutchfieldJames Gates Keri Macaulay David Rupp

Current Status – On Schedule Prototype assembly completed Prototype testing begun Wind-Aid Show Stoppers: High startup generator torque We are on schedule, per group and class project timetables

Last Week Action Item 1: Finished prototype assembly Utilized all machined and purchased items Assembly methods analyzed Action Item 2: Began testing prototype A mechanical weakness detected Startup torque greater than expected 3V in 9-11 mph wind Wind-Aid

Last Week Wind-Aid Testing—without load

Last Week Wind-Aid Testing—With Load

Next Week Action Item 1: Complete initial documentation of project Executive Summary Supporting design information Graphics Wind-Aid Action Item 2: Electronic circuits and coding Begin coding for intelligent design Work toward constructing final prototype circuits

Wind-Aid Questions?