Some ideas about WP 5 Olimia Congress Centre, Slovenia, 31 May 2011.

Slides:



Advertisements
Similar presentations
Overview and Further Planning of WP5 Integration Moderated Discussion Sunday 12 th February – Chaired by Prof. A. Moropoulou - Prof. R.
Advertisements

The Value of a Project Management Office Copyright: Kathy J. Lang, 2004.
Protocol Development.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
COST on the go: the experience of an Italian COST Actions’ representative Piermaria Corona.
CENTRAL EUROPE PROGRAMME SUCCESS FACTORS FOR PROJECT DEVELOPMENT: focus on activities and partnership JTS CENTRAL EUROPE PROGRAMME.
ESS VIP project on Validation
PRESENTATION LAYOUT  SLIDES 2-6: Introduction to WP5  SLIDES 7-8: Task 5.1  SLIDES 9-18: Analysis of the input we have so far to Task 5.1  SLIDES 19-20:
State of the Art in Theory and Practice of Rural Development Measures Partner 4: The University of Wales Aberystwyth.
Acquiring Information Systems and Applications
Integrated Control of Industrial and Chemical Substances in Cyprus Integrated Control of Industrial and Chemical Substances in Cyprus Final Conference.
1 Revisions to 21 CFR Supplements and Other Changes to an Approved Application PhRMA Perspective FDA Public Meeting – 7 Feb 2007.
Release & Deployment ITIL Version 3
What is Business Analysis Planning & Monitoring?
Quality assurance in IVET in Romania Lucian Voinea Mihai Iacob Otilia Apostu 4 th Project Meeting Prague, 21 st -22 nd October 2010.
30-31 March 2005 Workshop "IMS over Fixed Access" - Washington 1 TISPAN_NGN Project plan Martin Niekus Alain Sultan
Professional Certificate – Managing Public Accounts Committees Ian “Ren” Rennie.
M. Reimeris, The Ministry of Finance of Lithuania (Managing Authority)
EMI SA2: Quality Assurance (EMI-SA2 Work Package) Alberto Aimar (CERN) WP Leader.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
MARIFISH (Era-Net) Programme – Sequencing of Activity Work Packages Jul-10 Implement communications strategy Jan-07Jul-09Jan-10Jul-07Jan-08Jul-08Jan-09.
SIXTH FRAMEWORK PROGRAMME FP INCO-MPC-1 MEditerranean Development of Innovative Technologies for integrAted waTer managEment.
UN/CS/RAI/USAA/DB01/ Development of a Strategic Plan for a Digital Archives Programme Common Services Working Group on Archives and Records.
Quality Management (WP5) Roman CHIRCA Agency for Innovation and Technological Transfer TecTNet ………... This project has been funded with support from the.
SacProNet An Overview of Project Management Techniques.
1 PRODUCTION OF A MANUAL FOR STATISTICS ON ENERGY CONSUMPTION IN HOUSEHOLDS MESH PROJECT 3 rd Working Meeting Vienna, 4 rd October 2012 WP3: Draft Manual.
Acquiring Information Systems and Applications
Action Plan for WP.3 What is expected from project extension Welfare Mix Days Ulcinj, July Adriatic Welfare Mix.
Initial plans for WP 4 KickOff Meeting ICT-AGRI 2.
1 Strategic Plan for Digital Archives Programme DAP PROJECT SCOPE OVERVIEW STATUS.
RISK AWARE TITLE : RISK – Advanced Weather forecast system to Advise on Risk Events and management ACRONYM : RISK AWARE Duration: 36 months Status: Running.
Request for Proposal (RFP)
Implementation Strategy July 2002 STANDARDS DEVELOPMENT LIFECYCLE PROCESS ORP Publishes & Maintains 8 Standing Committee Recommends Approval / Disapproval.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
1 | 2010 Lecture 3: Project processes. Covered in this lecture Project processes Project Planning (PP) Project Assessment & Control (PAC) Risk Management.
Coordinating an Observation Network of Networks EnCompassing saTellite and IN-situ to fill the Gaps in European Observations Kick-Off Meeting, February.
The Interstate Council for Standardization, Metrology and Certification of the Commonwealth of Independence States (CIS) The report of 13 th session of.
Structuring of work related competences in Chemical Engineering STRENGTH Leonardo da Vinci ToI Project ES1-LEO RESULT 7 STRENGTH Quality.
WP4 – Policies, strategies, plans and innovative energy efficient solutions in urban transport Steering Committee Meeting Rijeka, Croatia 26/02/2015 Presented.
eMerger Integration Planning
Essnet STAND-PREP Rome, 6-7 June 2011 Rome, 6-7 June 2011 ESSnet “Preparation of standardisation” WP1 report: outline of the report, content, responsibility.
What is project management?
Project Management.
Standardisation in the European Statistical System inventory of normative documents and the standard-setting process – results of the ESSnet on Standardisation.
ICH Quality Topics Update
1 WP7 Presentation WP7 -- Project Evaluation Computer Engineering and Networks Laboratory, ETH Zurich Lukas Ruf.
NCB Noël Barengo, MD, PhD, MPH Department of Public Health University of Helsinki, Finland Unit of Clinical Research, University Hospital La Paz,
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
Request for Proposal (RFP) In response to the RFP – the first step is to prepare a proposal 1. Review Customer Requirements and come up with candidate.
European network for Health Technology Assessment | JA | EUnetHTA European network for Health Technology Assessment THL Info.
Pre-Workshop on Intervention of Science and Technology in Traditional Crafts Date : 14 th Dec Venue : Seminar Hall, First Floor of S & H Building.
Work Package 2 „Implementation of the SRA” Call secretariat Annette Angermann & Wenke Apt Rome, 11 June 2015.
CITYFIED PROJECT METHODOLOGY: AN INNOVATIVE, INTEGRATED AND OPEN METHODOLOGY FOR NEAR ZERO ENERGY RENOVATION OF EXISTING RESIDENTIAL DISTRICTS Cristina.
Quality Control Plan: Introduction
M. Reimeris, The Ministry of Finance of Lithuania (Managing Authority)
Lithuanian Standards for Evaluation of EU Structural Funds
Funded by the Erasmus+ Programme EPP JO-EPPKA2-CBHE-JP Lina Tsakalou

Civil Protection Financial Instrument – Prevention Projects
Working Group on Statistical Confidentiality, October 2009
ESS.VIP ADMIN Sorina Vâju.
ITDG meeting of of October 2011
The basics ESSnet on SDMX prepared in 2008/2009
Common Implementation Strategy for the
Quality Control Plan: Introduction
ESS.VIP Validation Item 5.1
Actions on Data validation
5.b3 Monitoring & Reporting 2019
1st Technical Committee Meeting – 08th Nov
Presentation transcript:

Some ideas about WP 5 Olimia Congress Centre, Slovenia, 31 May 2011

Work packages and tasks timetable

WP 5 Topics Objectives 1.Development of integrated documentation protocols; 2.Knowledge base decision making procedures; 3.Strategic planning for implementation and validation of the CHIC. Objectives Development of integrated documentation protocols; Knowledge base decision making procedures; Strategic planning for implementation and validation of the CHIC.

WP5 Objective no. 1 Development of integrated documentation protocols The protocol in form of questionaire about the heritage object will be proposed The protocol will content baiscs about object and necessary data for decission making

WP5 Objective no. 2 Knowledge base decision making procedures; Several criteria groups can be developed: historic value, architectural value, material/structural conditions,material/structural conditions, risk status,risk status, socio-economic aspects any other criteria group locally defined Each group will be weighted by the end user regarding their local needs and understanding of prioritization

WP5 Objective no. 3 Strategic planning for implementation and validation of the CHIC. The protocol and criteria will be given to end users to apply them according to their needs and local understanding of problem of retrofitting and maintenance ot heritageobjects

Proposed Methodology for Integrated Documentation Protocols At present there is no existing common procedures nor an established methodology for collecting, organizing and presenting data that could be used as a background for decision making in the selection of refurbishment strategies because of: should encompass all the criteria of a Problems in Methodology Incompatible Interventions Problems in Regulations Problems in the National Codes and Euro codes Total Quality Control System Integrated Documentatio n Protocols ALL DECISION MAKING SYSTEMS REQUIRE QUALITY CONTROL IN ALL THEIR PROCEDURES

Knowledge based decision making procedures. DOCUMENTATIONMONITORINGINSPECTIONDIAGNOSIS INTERVENTION STUDY INTERVENTION WORKS INTERVENTION WORKS ASSESSMENT The criteria for ranking the buildings and prioritize the activities of inspection, diagnosis & intervention are defined by Necessity Indexes.

Decision Making Procedures INTEGRATED DOCUMENTATION PROTOCOLS (IDENTITY CARD MODELS) ARE THE TOOL THAT ACCORDING TO THE NECESSITY OF PERFORMING: INSPECTION - DIAGNOSIS - INTERVENTION WORKS LEAD TO

Deliverables and Milestones WP5 Nr.DELIVERABLE WP/Lead Beneficiary Status D 5.1Integrated documentation protocols and harmonised criteria for IC models WP 5 / NTUAIn progress NrMilstoneWP / Lead Beneficiary Due date 5 Presentation of outline of EU CHIC Guidelines Steering Committee & Advisory Committee meeting - 5 WP 5 / NTUAMonth 27