Detector Systems Update MICO May 19, 2008. MICE Detector Systems  Beam Monitors u Over heating of sender boards has been s Solution.

Slides:



Advertisements
Similar presentations
Detector Systems Update MICO March 17, MICE Detector Systems  CKOV u Mississippi RAL  TOF0/1 u Hamamatsu PMT assemblies show an increasing.
Advertisements

MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
RFCC Module Update Derun Li Center for Beam Physics LBNL, Berkeley, CA MICO Weekly Phone Meeting March 21, 2011.
MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern DRAFT SEQUENCE OF EVENTS STEPS
Spectrometer Solenoids MICO 146 Steve Virostek LBNL June 6, 2011.
MICE Beam Monitors - STATUS MICO Meeting January 9, 2008 Alan Bross.
M. Bonesini - VC TOF status M. Bonesini Sezione INFN Milano Bicocca.
MICE Tracker Readout Overview channel AFE II-t boards - 8 Visible Light Photon Counter (VLPC) cassettes - 4 cryostats.
Detector Systems Update MICO April 23, MICE Detector Systems  CKOV u Nothing new  TOF0/1 u Tests to identify the source of the problems in the.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Introduction/Overview AFE-IIt firmware development VLSB firmware development Hardware progress.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
Detector Systems Update MICO April 14, MICE Detector Systems  CKOV u Nothing new  TOF0/1 u H6533MOD PMT assembly reliability is the main concern.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DDAQ Pending Issues o Detector FEE o Software framework o Trigger o Data Storage Jean-Sebastien Graulich,
Detector Systems Update MICO March 3, MICE Detector Systems  CKOV u CKOV humidity (HIH4000) and temperature (LM35) sensors in hand for installation.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
Tracker 2 Cryo &Electronics Update Linda Coney, UC Riverside Terry Hart, U Mississippi Ben Freemire, IIT Malcolm Ellis, Brunel University ADB MICE Collaboration.
Detector Systems Update MICO April 7, MICE Detector Systems  CKOV u Installed, first signals seen  TOF0/1 u 8 new H6533MOD assembly PMTs have.
KEK TB Phase II setup status Alan Bross MICE Tracking Group Meeting Daresbury Lab August 30, 2005.
Detector Systems Update MICO March 10, MICE Detector Systems  CKOV u No update  TOF0/1 u Tests with laser injection system progressing. u Tests.
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
MICE Tracker Readout Increased Data Readout Rate VLSB Development 16 AFE II t boards 8 Visible Light Photon Counter (VLPC) cassettes 4 cryostats.
Detector Systems Update MICO Feb 25, MICE Detector Systems  CKOV u CKOV installation planned during March shutdown u Cable issues resolved. Geneva.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO March 30, 2009.
1 MICE/AFE II t Update IIT Analog Front End (AFE) Test Stand AFE Conceptual Design Report (CDR) Terry Hart, Illinois Institute of Technology, February.
1 M. Bonesini - CM 25 RAL 5/11/09 PID status report M. Bonesini Sezione INFN Milano Bicocca.
MICE Tracker Readout and Data Acquisition; Solenoid Magnetic Field Measurement Terry Hart for the MICE Collaboration, Illinois Institute of Technology,
VC MICO Report July 07Jean-Sébastien GraulichSlide 1 Main news  DAQ test bench running in Geneva 2 LDCs connected to 2 different PCs, 1 GDCs DAQ trigger.
Cryo Update and Power Distribution Alan Bross Tracker Parallel – MICE CM October 7, 2007.
Takashi Matsushita Imperial College T. Matsushita 1 Tracker Status.
MICE CMPB Alain Blondel 19 April spokesperson remarks CMPB MICE NEWS.
Linda Coney MC VC May 19, 2011 MICE Operations Manager Report.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Detector Systems For May/June Run MICE Video Meeting April 24, 2008.
1 Re-gas compressors to 2.20 Mpa - Me New oil mist adsorbers in compressors at 20k hrs – Me Comp1 11K hrs, Comp2 11K, Comp3 20K, Comp4 18K Service cold.
Electrical & Control Power Supplies Trevor Hartnett.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be Jun at IIT and the 19th at Fermilab right before the.
MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien.
Tracker Summary Alan Bross MICE CM October 10, 2007.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
1M. Ellis - MICE VC - 1st November 2007 Cosmic Ray Test Preparations  The cosmic ray test was initially planned to be held in R12, but this proved to.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
M. Bonesini - MICE Inst Meeting M. Bonesini INFN Milano TOF installation plans.
MICE Phase 1 Koji Yoshimura KEK June
Online Reconstruction 1M.Ellis - CM th October 2008.
1 KEK test-beam software progress Malcolm Ellis MICE Video Conference 4 th May 2005.
1 AFE IIt/VLSB Update Terry Hart, MICE Tracker Phone Conference September 5, 2007.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
VLPC System Update A.Bross MICE CM Feb 9, Cryo  Production cryostats 1 and 2 ran smoothly at operating temperature  However, Cassette 109 in cryo.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
Detector Summary Tracker. Well, as far as the tracker hardware is concerned, we are done. – Need to do the system test to make sure nothing has degraded.
M. Bonesini – CM 291 PID detectors summary M. Bonesini Sezione INFN Milano Bicocca.
Software Overview 1M. Ellis - CM21 - 7th June 2008  Simulation Status  Reconstruction Status  Unpacking Library  Tracker Data Format  Real Data (DATE)
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
M. Bonesini - CM 22 RAL October 081 TOF0 status M. Bonesini Sezione INFN Milano Bicocca.
Tracker Readout Progress Terry Hart, MICE Tracker Meeting, July 29, 2008 Cosmic Ray Readout with 1 st Tracker at RAL 2 nd Tracker Preparation at FNAL Firmware.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
MICE VLPC Cryo Update Alan Bross MICE CM18 June 13, 2007.
AFE IIt/VLSB Update Firmware Progress Hardware Progress AFE IIt VLSB
Tracker Software Status
The Detector System of the MICE Experiment
Presentation transcript:

Detector Systems Update MICO May 19, 2008

MICE Detector Systems  Beam Monitors u Over heating of sender boards has been s Solution is to add fan. Retrofit kit to be shipped to RAL this week  CKOV u Nothing new  TOF0/1 u 22 Hamamatsu H6533MOD assemblies, with modified active divider were delivered to INFN MIB last Friday. u Tests, in presence of the Hamamatsu representative, will start tomorrow 20/5.  Calorimeter – Still Ready to Go

 Tracker Electronics u Cryo #1 and #2 working well and ready to ship u Multi-board readout with all 4 boards on Cryostats #1 and 4 boards on #2 has been accomplished. u Problems arose when full system (8 board, 2 cryostats) readout was attempted. The problem was traced to what appears to be a problem with VLSB boards. As of Friday 5/16, only 4 VLSB boards could be made to work simultaneously. s Investigation continues s May require firmware modification s Could be VME problem u The Goal is still to ship by June 4 th and start installation in R8 on June 16 th