1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.

Slides:



Advertisements
Similar presentations
Section 4.1 – Vectors (in component form)
Advertisements

Presentation #M2 EZ Parking Wontaek Shin (M2-1) Shanshan Ma (M2-2) Nan Li (M2-3) Stage 1: 1/24/2006 Design Proposal Overall Project Objective: Design a.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
M2: Team Paradigm :: Milestone 6 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Design Goal Design an Analog-to-Digital Conversion chip to meet demands of high quality voice applications such as: Digital Telephony, Digital Hearing.
S CRATCHPAD M EMORIES : A D ESIGN A LTERNATIVE FOR C ACHE O N - CHIP M EMORY IN E MBEDDED S YSTEMS - Nalini Kumar Gaurav Chitroda Komal Kasat.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
1 Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation 13: Final Presentation.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 3: Feb. 4 th Size Estimates/Floorplan Overall Project Objective: Design an.
Viterbi Decoder: Presentation #11 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 11: 12 th April 2004 Short Final Presentation.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 10: April 5th Chip Level Simulation Overall Project Objective: Design an.
M2: Team Paradigm :: Milestone 8 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
GPS Waypoint Navigation 525 Team M-3: Nicholas Bannister, Charles Norman, Jeremy Weagley, Julio Segundo, Steve Nielsen Presentation 1: Preliminary Design.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 9: March 31st Chip Level Simulatio Overall Project Objective: Design an Air-Fuel.
RF Triangulation: Indoor/Outdoor Location Finding Chip Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai Overall Project.
GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
Tracks & Routes GPS & You III. Using waypoints: point-to-pointUsing waypoints: point-to-point Using waypoints: routesUsing waypoints: routes Using tracksUsing.
1 Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Presentation 10 MAD MAC th April, 2006 Top-Level Layout.
Lucas-Lehmer Primality Tester Presentation 5 February 22, 2006 Team: W-4 Nathan Stohs W4-1 Brian Johnson W4-2 Joe Hurley W4-3 Marques Johnson W4-4 Design.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Encryption Transaction with 3DES Team W2 Yervant Dermenjian (W21) Taewan Kim (W22) Evan Mengstab(W23) Xiaochun Zhu(W24) Objective: To implement a secure.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 8: March 24th Chip Level Layout Overall Project Objective: Design an Air-Fuel.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Camera Auto Focus Presentation 3, February 7 th, 2007 Team W1: Tom Goff (W11) David Hwang (W12) Kate Killfoile (W13) Greg Look (W14) Design Manager: Bowei.
1 Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Presentation 8 MAD MAC nd March, 2006 Functional Block.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 5: Feb. 18 th Component Layout Overall Project Objective: Design an Air-Fuel.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 4: Feb. 11 th Gate Level Design Overall Project Objective: Design an Air-Fuel.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
1 Practicum Session 4 Introduction to GPS. 2 Outline Waypoints Waypoints The GoTo Function: go to a stored waypoint The GoTo Function: go to a stored.
Navigational Aids Know the theory and operation of modern air navigational aids.
AIR NAVIGATION Part 2 Distance Speed & Time.
PropaGator Oral Report 2 Andrew Wegener IMDL 2012.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Global Positioning System
Newton believed that every object ___attracts_____ every other object. The force of the attraction depends on the __mass___ and _distance__ of the two.
Team W3: Anthony Marchetta Derek R. Ritchea David M. Roderick Adam Stoler Milestone 1: Jan 21 st Project Proposal Overall Project Objective: Design an.
Dot Product Second Type of Product Using Vectors.
Lecture 4: Global Positioning System (GPS)
Project Presentation Power optimization of an IR remote control Presented by Hazem Awad.
Team RoboTrek Matt Kabert Ryan Bokman Vipul Gupta Advisor: Rong Xu.
Launch your browser (Explorer). Go to Minimize your browser until instructed otherwise.
Team 01 : QuadSquad Software Design Considerations Camille Chang 10/23/2013 the ECE quadcopter senior design Purdue University1.
Our Topics: Website Resources Garmin GPS 78S (D1N GPS Units) and cover WAAS OpenCPN basic use for Navigation Systems work OpenCPN Object.
-1- Soft Core Viterbi Decoder EECS 290A Project Dave Chinnery, Rhett Davis, Chris Taylor, Ning Zhang.
FlySpy Patent Liabilities Analysis
Objective: Solve linear systems.
Crossing and Passing MA-AFAS
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
How to calculate a dot product
كار همراه با آسودگي و امنيت
Section 3.1 – Vectors in Component Form
CHAPTER 4 COUNTER.
Unit 3 Review (Calculator)
Unit 2 Unmanned Aircraft
Fractions Year 6+
Calculate 9 x 81 = x 3 3 x 3 x 3 x 3 3 x 3 x 3 x 3 x 3 x 3 x =

Presentation transcript:

1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation 10 April 10, 2006 Overall Project Objective: Design a low-power chip that navigates an aircraft to pre- determined waypoints.

2 SRAM Col

3 Current Status  SRAM consumes –Write 52 uW –Read 26 uW –Static 20 uW

4 Cell Analysis Functional Component Recent Count Area (µm²) Power FSM2722, nW SRAM 3,988 3,988-20uW Registers/Buffers Clock / Counter Logic Done Logic 6,2101, ,50010,5003,5009.8uW-- Speed Comparator Altitude Comparator Waypoint Comparator , ,90016,000902pW1.42nW225.4uW Heading Calculator Distance Calculator Speed Calculator Angle Calculator 3,4563,4281,6261,24615,50015,5007,0006, nW11.12nW5.82nW4.71nW Total27, uW

5 Questions???