Nov-1st 2004, MICE TV Conf. Plans for absorber tests at KEK Shigeru Ishimoto KEK.

Slides:



Advertisements
Similar presentations
COE RAC SECTOR ITI UTTARSANDA
Advertisements

Absorber R&D and Instrumentation MICE Meeting at FNAL, Jun 8-11, 2006 Shigeru Ishimoto KEK and MICE Japan “Sakuraso” Japanese Primula and Green House.
Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
Liquid Hydrogen Absorber
Photo KEK March-28, 2002 MICE Absorber and Test Cryostat Shigeru Ishimoto (KEK) Shoji Suzuki (KEK) Edgar Black (IIT) Mary Anne Cummings (NIU) (1) MICE.
10 June 2006MICE Collaboration Meeting CM-151 Can MICE Solid and Liquid Absorbers be Characterized to better than 0.3 Percent? Michael A. Green 1, and.
The Use of Small Coolers for Hydrogen and Helium Liquefaction
Cooling Channel Count Recap Cooling channel components # Engineering? Absorber: temperature 8*3 yes pressure 2*3 yes He temp 2*3 level 8*3 yes length (optical)
1 MICE Hydrogen System Elwyn Baynham, Tom Bradshaw, Iouri Ivaniouchenkov RAL MICE / RAL Safety RAL, 30 October 2003.
1 Cooling the Hydrogen (Helium) Absorbers with Small Coolers Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Video.
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
Absorber R&D and Test Results CM16 at RAL, Oct 8-11, 2006 Shoji Suzuki & Shigeru Ishimoto KEK.
EXPERIENCE FROM KEK Norihito Ohuchi 2009/11/9-101 Workshop on cryogenic and vacuum sectorisations of the SPL.
Agreement on scope of supply and extent of interface among different suppliers of the AFC module This talk covers the scope of supply on the Absorber Focus.
1 Status of Hydrogen System Development MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov, Tom Bradshaw, Elwyn Baynham, Mike Courthold,
1 MICE at RAL MICE Collaboration RAL, 2 November 2003 Elwyn Baynham, Tom Bradshaw, Iouri Ivaniouchenkov, Tony Jones, Jim Rochford Engineering.
CM26 – 26 th March 2010 Step IV: Liquid Hydrogen Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
1 MICE Absorber working group Columbia, 13 June 2003 MICE Hydrogen System. Preliminary HAZOP. Elwyn Baynham, Tom Bradshaw and Iouri Ivaniouchenkov,
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
1 MICE hydrogen system layout. 2 MICE hydrogen system layout (2)
MICE Absorber Test Cryostat Plan-II S. Ishimoto KEK MICE-AFC Phone Meeting, Aug-27, ‘04.
Background to the current problem 1. As a result of the high stresses in the bobbin due to the magnet load, the bobbin end plate needs to be increased.
MICE Absorber and Test Cryostat Shigeru Ishimoto KEK MICE AFC Module Phone Conference (March 12, 2004) (1) MICE Absorber Test Process (2) MICE Absorber.
MICE LH2 ABSORBER BODY Shigeru ISHIMOTO KEK OCT Non-Welding Bolt-Type Absorber.
March 14, 2003 MICE Absorber/Coil Integration MICE LH2 Absorber 1.Assembly 2.Safety 3.Staging 4.Instrumentation.
Available thin solenoids with dimensions of about 1 m  X 1 mL with field about 1 tesla in KEK/IPNS KEK/IPNS Y.Makida 2005/March/28.
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
bobbin Thermal radiation shield Magnet cryostat Large End Flange The leading dimensions.
Hydrogen Delivery System – R&D Activities T W Bradshaw M Courthold M Hills J Rochford Daresbury Controls Group etc…
Absorber Design Details Mary Anne Cummings MICE MEETING Columbia June 13, 2003.
MICE hydrogen review Summary of system hardware. System function To provide 22 litres of liquid hydrogen for use as a muon absorber within a superconducting.
Liquid-hydrogen absorber: Shigeru Ishimoto KEK Contents (1)Introduction (2)MICE absorber design (3)Prototype absorber test at KEK (4)MICE absorber instrumentation.
MICE CM30 7 th July 2011 Liquid Hydrogen Delivery System M Hills (STFC, RAL) T Bradshaw (STFC, RAL) M Courthold (STFC, RAL) S Ishimoto (KEK) A Muir (STFC,
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Cryogenics Science Center/KEK (Nobuhiro KIMURA –20/April./2010 at ATF2 meeting ) 1 Resent Progress at KEK N. KIMURA, T. TOMARU, Y. AJIMA, T. KUME, A. YAMAMOTO,
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
Absorber Production Status Contents (1)MICE absorber design/status (2)MICE absorber instrumentation (3)Schedule (4)Summary Sasanqua at KEK on 13-DEC,’09.
HD target.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Beaver Watching MICE meeting at FNAL Jun-08, 2006 Absorber Progress MICE VC Aug-16, 2006 Shigeru Ishimoto & Shoji Suzuki, KEK.
Preliminary Design for the Coupling Coil Cryostat in MICE
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
Development of solid hydrogen target in RIKEN RIKEN T. Ohnishi, H. Takeda, T. Suda KEK S. Ishimoto, S. Suzuki RCNP Y. Takahashi ANL I. Tanihata  Introduction.
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION KEKB Review Committee/ NAKAI Hirotaka KEK Crab Cavity - Cryogenics - KEKB Crab Cavity Group - presented.
CM 28 – 6 th October 2010 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
EuCARD WP 7 – High Field Magnets Task – Radiation certification Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task
Hydrogen Pre-Operation Safety Review 4 th October 2011 The Hydrogen Delivery System – An Introduction M Hills.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
MICE/MuCool Coupling Magnets to 22 ICST/HIT MICE/Muool Coupling Magnets Progress Li Wang for MICE Group Institute of Cryogenics.
Subjects for SC FF magnet system at ATF2 Infrastructures at ATF2? How supply cryogen at ATF2 (set up cryogenic system?) (Gas helium recovery line?) Set.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Restoring Komag Yasuhiro Makida Consideration of restoring and modifying Komag for a stand alone operation without the refrigerator. Contents 1.Magnet.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
Spectrometer Solenoid Design and Test Results Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
1 Status of infrastructure MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
1 MICE absorbers work package MPB – 27/10/15 Mike Courthold Mark Tucker Phil Warburton Steve Watson.
-1- Steve Virostek (LBNL) and Li Wang (SINAP) Instrumentation for the MICE Coupling Coil Steve Virostek Lawrence Berkeley National Lab February.
Final Design Cryogenic and mechanical configurations
Teleconf ACS – FREIA 28th March 2017
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
MICE Meeting at RAL, Oct-23, 2005
LARP Vertical Test Facility
Small Coolers for MICE MICE Collaboration Meeting RAL Michael A. Green
(vertical cryostat, Gersemi)
Presentation transcript:

Nov-1st 2004, MICE TV Conf. Plans for absorber tests at KEK Shigeru Ishimoto KEK

Absorber test plan KEK Absorber body *Pressure test at 20K with dummy windows US/FNAL Windows *Pressure test at R.T. RAL *Pressure test at R.T. *Cooling test at 20K KEK *Pressure test at R.T. with windows *Pressure test at 20K with windows KEK Absorber test cryostat - Absorber body test - Windows test - Cryocooler cooling test at 20K and 4.2K - Sensor calibration

Cooling power with full radiation shield Radiation heating from 300K KEK/RIKEN Cryocooler RDK415D for solid hydrogen target WARNING; Operation & extraction of full cooling power from Cryocooler is not always easy.

MICE absorber system with Cryocooler He refrigerator Exit to cool the transfer tube G-H 2 cylinders/H 2 tank/ Metal hydride G-H 2 safety exit and reservoir tank He, N 2 gas exit/return H 2 leak monitor L-He Dewar L-N 2 Dewar G-He cylinders Absorber vacuum system Safety exit for H 2

MICE absorber system with Cryocooler for L-He absorber G-He exit and recovery He, N 2 gas exit/return H 2 leak monitor L-N 2 /He Dewar G-He cylinders Absorber vacuum system Safety exit for H 2 L-He Dewar L-He 1 + q W  35 x 2 x q L/day Exit to cool the transfer tube

MICE absorber system with Cryocooler

MICE absorber system with Cryocooler H2 In Pipe

Absorber test cryostat ATC-002 (dimensions) MICE (needs larger Cryocooler flange for pips) D2; Cryocooler flange W W H2 H1 D1

Absorber test cryostat ATC-002 (absorber support) Inside diameter of MICE magnet bore S-S tube for absorber support at room temp. top flange

Absorber test cryostat ATC-002 (top view) Top flange Absorber  needs modify

Absorber test cryostat ATC-002 (Mirapro) Ordered; Nov ’04 Arrive; Mar ’05

Thermometers & level sensor 4 wires measurement  use standard read-outs  required wide are in LH2 pipe

CX-1050-SD 10 sensors ware calibrated at FNAL. LH 2 level sensor and thermometers

Calibration of LH 2 level sensor x5 Cryocooler + LH 2 condenser

Test area (KEK-east counter hall) H 2 gas exhaust duct to fan Nov-26, ‘04 H 2 gas tank (2m 3 ) LH 2 target (~ 0.5 L) for E559 LHe-II target for E549

Summary 1/2 (Test Item) (I) Cooling test by LH 2 (Cryocooler) ; H2 ABSORBER 1) Pre-cooling test to 20K ---- LH 2 < 1 L 2) Absorber pressure/leak test at 20K ---- P=2.0 bar, leak < Torr*L/s 3) Heat leak test at 20K  measure the H 2 evaporation rate (II) Cooling test by LHe (Dewar + Cryocooler) ; He ABSORBER 1) Pre-cooling test to 4.2K ---- LHe ~ full 2) Absorber pressure/leak test at 4.2K ---- P=2.0 bar, leak < Torr*L/s 3) Heat leak test at 4.2K  measure the He evaporation rate (III) Windows test 1) Windows pressure/leak test at 20K ---- if required (IV) Sensor test (without absorber) 1) Thermometer calibration 2) LH 2 level sensor calibration

Summary 2/2 (status/schedule) (1) Test Cryostat ---- ordered to MIRAPRO Nov, ‘04 will arrive by the end of March (2) Cryocooler --- ready, will arrive soon have to share with the VLPC test at KEK? (3) Absorber body ; ready, needs modification and piping (4) LH 2 Reservoir and piping around Cryocooler needs design and fabrication --- fabrication start from March?  needs detail MICE design (5) Thermometers calibrated CX-1050; ready (6) LH 2 Level sensor and housing --- AMI capacitance sensor ; ready needs copper block to fit Cryocooler (7) LH 2 Level resistance sensor uncalibrated CX-1050; ready