Preliminary Design Review 1: Project Plan Senior Design: Team Burja ___________________________________________________________________________________________________________________________________________________________________________________________

Slides:



Advertisements
Similar presentations
University of Notre Dame Department of Aerospace and Mechanical Engineering Matt Bertke, Paul DeMott, Patrick Hertzke, Will Sirokman 7 December 2004 AME.
Advertisements

Unit Number Oct 2011 Nov 2011 Dec 2011 Jan 2012 Feb 2012 Mar 2012 Apr 2012 May 2012 Jun 2012 Jul 2012 Aug 2012 Sep (3/4 Unit) 7 8 Units.
MSD 11209: WOCCS: Long-Range RF Module Meet the Team Danelle Grabski- Electrical Engineering Jacky Ng- Electrical Engineering Josh Doolin- Electrical.
9/2/04 Pratham Team Leader: Matt Ryan Chief Engineer: Gabe Letona Fabrication: Reed Langton CADCAM: Fraterno Vila Electronics/Control Engineer: Nick Martin.
Material Discharging AME 470: Senior Design ASME Bulk Material Transporter Matt Bertke, Paul DeMott, Patrick Hertzke, Will Sirokman 14 October 2004.
Pratham Team Leader: Matt Ryan Chief Engineer: Gabe Letona Fabrication: Reed Langton CADCAM: Fraterno Vila Electronics/Control Engineer: Nick Martin.
Preliminary Design Review 6:  Concept Revision  Chassis Design Senior Design: Team Burja ____________________________________________________________________________________________________________________________________________________________________
Pratham Presenter: Nick Martin Team Leader: Matt Ryan Chief Engineer: Gabe Letona Fabrication: Reed Langton CADCAM: Fraterno Vila Electronics/Control Engineer:
Pratham CAD/CAM Drawings & Component Integration Presenter: Nick Martin Team Leader: Matt Ryan Chief Engineer: Gabe Letona Fabrication: Reed Langton CADCAM:
Multidisciplinary Engineering Senior Design Project xxxxx Project Name Preliminary Design Review mm/dd/yy Project Sponsor: Team Members: Team Mentor: Acknowledgements:
9/2/04 Pratham Team Leader: Matt Ryan Chief Engineer: Gabe Letona Fabrication: Reed Langton CAD/CAM: Fraterno Vila Electronics/Control Engineer: Nick Martin.
Electronics and Power Distribution AME 470: Senior Design ASME Bulk Material Transporter Matt Bertke, Paul DeMott, Patrick Hertzke, Will Sirokman 4 November.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
Stefan Campbell: TEAM LEADER Carlos Celada:CHIEF ENGINEER Chris Villani:ELECTRONICS ENGINEER Laurel Weiske:CAD/CAM SUPERVISOR *All members will be equally.
Senior Design 1 Android Pilot Nation 2.0 Team Cuckoo’s Nest –Stewart Wilson –Marshall Miller –Oliver Peery –Michael Kness University of Portland School.
Preliminary Design Review 2: Product Requirements and Design Specifications Senior Design: Team Burja _________________________________________________________________________________________________________________________________________________________
Individual Design Concepts Senior Design: Team Burja __________________________________________________________________________________________________________________________________________________________________________________________________________
LIGO-G D LIGO R&D1 Advanced LIGO R&D Review The PSL Peter King & Rich Abbott October 8, 2002.
SOCCER WORLD CUP: NMBM NMBM PRESENTATION To the National Assembly The Joint Meeting of the Portfolio Committees on Provincial & Local Government.
Mobility and Navigation AME 470: Senior Design ASME Bulk Material Transporter Matt Bertke, Paul DeMott, Patrick Hertzke, Will Sirokman 23 September 2004.
PDR Computer Aided Design AME 470: Senior Design ASME Bulk Material Transporter Matt Bertke, Paul DeMott, Patrick Hertzke, Will Sirokman 11 November 2004.
Team Concept and Key Issues AME 470: Senior Design ASME Bulk Material Transporter Matt Bertke, Paul DeMott, Patrick Hertzke, Will Sirokman 16 September.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
Anonymous | Secure | User friendly
Jan 2016 Solar Lunar Data.

May Jun Jul Aug Sep Oct Nov Dec Material Available
Today 8 days 24 days 34 days 23 days 35 days 31 days May Jun
Average Monthly Temperature and Rainfall







Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Free PPT Diagrams : ALLPPT.com



2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March


©G Dear 2008 – Not to be sold/Free to use


Electricity Cost and Use – FY 2016 and FY 2017

Science CnD Business Model Results

Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Free PPT Diagrams : ALLPPT.com


Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3

2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Key Management Processes
Presentation transcript:

Preliminary Design Review 1: Project Plan Senior Design: Team Burja _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ AME 470: Senior Design ASME Bulk Material Transporter Matt Bertke, Paul DeMott, Patrick Hertzke, Will Sirokman 26 August 2004

Team Structure Team roles and responsibilities Senior Design: Team Burja _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ Team Leader Paul DeMott Chief Engineer Will Sirokman CAD/CAM and Fabrication Engineer Patrick Hertzke Electrical and Controls Engineer Matt Bertke

PRD Schedule Tentative Schedule of Preliminary Design Reviews Senior Design: Team Burja _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ 26-Aug Team Organization 21-Aug Design Requirements, Specifications and Constraints 7-Sep Individual Concepts 14-Sep Team Concept 21-Sep Mobility 28-Sep Grain Transportation and Delivery 5-Oct Controls and Electronics 12-Oct CAD/CAM 26-Oct List of all parts and their sources; estimate of production costs. 2-Nov Outstanding Issues 9-Nov None Scheduled 16-Nov None Scheduled

Gannt Chart Graphical display of project scheduling Senior Design: Team Burja _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________