1 Z cables with New Fiber Howard Budd University of Rochester Rochester Meeting Jul 24 2009.

Slides:



Advertisements
Similar presentations
Using the What Am I Template Copy the presentation to your hard drive. Open the slides using slide sorter and copy slides #3, 4 and 5 for each question.
Advertisements

Vertex Detector: Engineering Issues Craig Buttar University of Glasgow Cambridge GLDC meeting Sept 07.
EE 4780 Huffman Coding Example. Bahadir K. Gunturk2 Huffman Coding Example Suppose X is a source producing symbols; the symbols comes from the alphabet.
The Identity, Initiatives, & Insights of Jesus. The Identity, Initiatives, & Insights of Jesus Scripture: John Review from Last Week Three Questions.
MINER A NuMI MINER A Director’s Review 10 January 2005 H. Budd Univ. of Rochester Optical Cables and Scintillator Extrusions 10 January MINERvA.
WLS Fiber Pigtails Howard Budd University of Rochester Dec T2K Collaboration Meeting.
1 G4MICE studies of PID transverse acceptance MICE video conference Rikard Sandström.
CPR2 Optical Cables Joey Huston Michigan State University …taking optical signals from edge of CPR/crack detectors to PMT boxes mounted on back of wedges.
1 Start at Estimating Cable Labor Howard Budd University of Rochester Rochester Meeting Nov
Physical Media Now that we’ve been over how to encode data as signals, what are the physical media that carry these signals?
Fiber Attenuation Length Test for MINERvA Jaewon Park University of Rochester Jupiter/MINERvA Meeting, Sep 10, 2005.
1 Preliminary Cable Labor Estimate Howard Budd University of Rochester Rochester Meeting Dec
Diamonds & R&D on Pigtails Howard Budd Sep
Polishing the Ferrules Howard Budd Aug Visit We visited the place where the polisher is made We got 2 collets which the ferrules fit well in.
Measuring the Ferrules Howard Budd Aug Measuring the Nipple The caliper used to measure the nipple This picture is to show how we measure the.
Polishing the Ferrules Howard Budd Sep Polishing Epoxy on the Ferrule We glued fibers in the 10 ferrules that Dave Warner gave us One problem.
Polishing the Ferrules Howard Budd Aug Looking at the Old Ferrules I found 3 polished ferrules One was shown in the previous ppt file We photographed.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Apr, 16, 2008.
Diamonds & t2k production Howard Budd Oct
Fiber Attenuation Length Test -Update- Jaewon Park University of Rochester Jupiter/MINERvA Meeting, Dec 7, 2005.
1 Production 2 WLS QC Howard Budd University of Rochester Rochester Meeting Oct
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 20, 2011.
EXAMPLE 1 Finding a Mean Geysers Over a span of 12 hours, Old Faithful Geyser in Yellowstone National Park erupted 10 times. The lengths (in minutes) of.
Technical Specification April 23rd-24th 2013Handling Engineering Group1  Technical documents during tender  Contract execution  Documents during contract.
CAM2: and why Lab Impex bought a licence Morgan Jones AWE.
How the Web Works AGED How the Web Works Most people use an internet service provider (ISP) or an online service provider (OSP) like AOL to access.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
Website Test Nick Montez. My Website Animated Clipart.
Planning your site/organization on the Web Please use speaker notes for additional information!
Scientific Method. My 4 out of 5 Rule If you make an observation.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep 26, 2011.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 17, 2011.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
By: Emily Ejzak. What is a pendulm and how does it work ? A pendulm is a fixed mass that moves to and fro. It works by moving back and fourth.
David M. Strong Pepperdine University Why It Might Seem That Christmas Is Coming Early This Year.
Neural Networks. Molecules Levels of Information Processing in the Nervous System 0.01  m Synapses 1m1m Neurons 100  m Local Networks 1mm Areas /
MINER A Main INjector ExpeRiment for v-A Active segmented scintillator detector: 5.87 tons Nuclear targets of C, Fe and Pb.
Fiber routing test Marc & Qian (We did not glue in any fibers and only used tape for temporary purpose. We routed four fibers.)
PERMISSION ANALYZER 2 Reports NTFS permissions from the file system combined with user and group data from the Active Directory.
PS Timing & Alignement Progresses 17 April 2008 LPC Clermont.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 8, 2016.
About My Fitness Test Results UNIT 1 By _______________________ P5– Interpret their test results and personal level of fitness. M2 – Explain their test.
Tracking Upgrade R&D Meeting. Columbia University A. Seiden September 22, 2003.
The Ludlum Project Advisors: Dr. Randal Ruchti, Dr. Dan Karmgard Mark Vigneault Teacher: Mark Kirzeder Students: Kristen Anderson Mengwen Zhang.
7.8 Geometric Probability
Probability vs. Impact Matrix
Distance and Midpoint Formulas
Secondary Storage Management 13.5 Arranging data on disk
APCS Grading Day A User’s Manual.
Results for p = 0.1 Graphs at different values of Call Arrival Rate for Call Blocking Probability (in %) System Utilization (Efficiency) (in %) Average.
Rich Occupancies and Bandwidth in Minimal Upgrade Layout
The E835 SCI-FI Detector In Ferrara It has been built a scintillating fibers detector for the tracking system of exp. E835 (Charmonium spectroscopy) a.
HBr V(m+7) H+: Bandwidths
Program Plan For B2B Marketers
My birthday I’m four years old. How old are you?
קורס פיננסי – מושגים פיננסיים / כלכליים
Secondary Storage Management 13.5 Arranging data on disk
Comments on Dual Readout Calorimeter
What shape am I? I am a plane shape. I have 4 sides.
Far Detector Performance and Calibration
Subclipse CSCI 3130 Summer 2016.
Learning Path Planning Sheet Objective: Average Number of Days Needed:
Potential Profile and Spectroscopic Measurements in the TU/e Fusor
Introduction to Databases
11/26 Notes Averaging There appears to be a built in functionality to specify 2 clockrates: Cockrate IN (a high one) and clockrate OUT (some lower one,
Default coloring is average filter value
Applied Electromagnetic Waves
This is my sheet And this is my sheet.
Presentation transcript:

1 Z cables with New Fiber Howard Budd University of Rochester Rochester Meeting Jul

2 Cable Average, Z MIE started with new fiber on 221 From fits with new fiber using mapper cables attenuation length of new fiber ~950 and old fiber ~840 This means that its hard to average cables made with this fiber with the old fiber

3 New Fiber My thought is a new “mapper” directory will be created where cables made with the new fiber will go. My thought is the inner detector active region should use Z cables with this new fiber I have created QC sheets for the Z cables with the new fiber, so they can be released. I will probably redue the sheets when I get all the files in the right place for the QC program