SyncGen Multiple Unit Selectivity for Stator Ground Faults Using a Sensitive Directional Element Snapshot Presentation.

Slides:



Advertisements
Similar presentations
D ESIGN S UMMARY O BJECTIVES B ACKGROUND P ROTOTYPE E NGINEERING A NALYSIS P ROTECTION I MPACT A CKNOWLEDGMENTS T EAM B ARDEEN N EUTRAL G ROUNDING S CHEMES.
Advertisements

New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
Submitted by: Name:Rajendra Kumar Choudhury Branch:Electrical Engg.
Transmission Operator Protection System Misoperations 2014 ERCOT Transmission Protections System Misoperations Data – 138kV and 345kV Combined (Not including.
SYMMETRICAL COMPONENETS OF POWER SYSTEM
ECE 4334: Capstone Design Fall 2009 Welcome ! Facilitator: Dr. Len Trombetta.
GENERATOR PROTECTION.
Generator Management Relay
© 2010 Eaton Corporation. All rights reserved. Neutral Switching of Grounded Sources Dave Loucks, PE.
Copyright © SEL 2004 Protection for Abnormal System Conditions Presented at: Clemson Power Systems Conference 2005 March 10, 2005 E. O. Schweitzer Schweitzer.
Protective Relaying Refresher
Power System Analysis/ Power System 1 EEE 4113/ EEE 3131
ECE 4335/4336: Capstone Design Spring 2015 Dr. Len Trombetta (course coordinator) Dr. Pauline Markenscoff (undergraduate academic advisor) Ms. Cecily Smith.
Transformer Testing Station Determining Sensitivity of a Relay to Inter-turn Faults on an Energized Power Transformer Sponsored by: Schweitzer Engineering.
ME Project: Air Conditioner Lab Team: 10 Members: Sean M. Gallagher, Brian Davison, Prathana Vannarath, Pam McDowell Customer: University of Delaware Mechanical.
Selective Stator Ground Protection Expo Presentation.
SyncGen Multiple Unit Selectivity for Stator Ground Faults Using a Sensitive Directional Element Design Proposal Presentation.
Team Members: Jon Klein Nguyen Vu Kyle Menges Christine Lowry Chris Stein Priya Narasimhan Julie Coggshall Week 2 – End Of Day:  Progress Update  Concept.
Team 10 Air Conditioning Experiment Members –Sean Gallagher –Pamela McDowell –Brian Davison –Prathana Vanarath Sponsors –Dr. Wexler –Dr. Advani Advisor.
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com Challenges and Solutions for Large-Scale PV Integration on RPU’s Distribution.
Presentation Outline Background Problem assessment Idea development Proposed program Future efforts.
Generator Protection. Amount of Protection Rated power of the generator Ratio of its capacity to the total capacity of the system Configuration of the.
Unit Transformer Unit transformer are step up transformer which is connected to generating house & step up voltage from 15kV voltage to 132 voltage level.
Differential protection : (protective relaying by Blackburn)
Upgrading Remote Access to the Analog Model Power System Amrit Dahal Ryan Litzko Client: Dr. Brian Johnson, ECE Dept. ECE 544: Control Systems and Critical.
May15-30: Fast, Compact, High Strength Magnetic Pulse Generator.
Interconnect Protection of Dispersed Generators
Hybrid Wind and Solar Generation System MAY Team: Daoxi Sun, Riley O'Connor, Trevor Webb, Shihao Ni, Xiaokai Sun, Ben Ryan Advisor, Client: Venkataramana.
 Fiber optic network in ring topology  Custom software implementing a Time Division Multiplexing (TDM) scheme  Documentation summarizing conclusions.
Texas Integrated Energy Solutions. Development Team, Background, Objective, & Justification 2.
Senior Design, Spring 2013 Jane Peters Riley Groves Jared Jasper Matt Murphy Muzi Li.
{ IAFF 6159: 10 Interdisciplinary Seminar on International Science & Technology Policy Spring 2013: Syllabus.
2015 RTP – Study Scope of Short Circuit Analysis RPG Meeting May 19,
NERC Event Analysis Update Member Representatives Committee Meeting October 28, 2008 Robert W. Cummings NERC Director of Event Analysis & Information Exchange.
Wind Turbine Design and Implementation Phase III Senior Design May Team Andrew Nigro (EE) Chad Hand (EE) Luke Rupiper (EE) Ryan Semler (EE) Shonda.
MSD I – Mid Project Presentation Winter 08/09 P09454: Design & Testing of Centrifugal Pump Components.
CLEMSON UNIVERSITY DG CONFERENCE UPDATE ON THE CURRENT STATUS OF DG INTERCONNECTION PROTECTION WHAT IEEE 1547 DOESN’T TELL YOU ABOUT INTERCONNECTION PROTECTION.
Problem Statement Expanding the capabilities of an auto repair paint drying system that uses newly developed ultraviolet (UV) light activated paint. This.
Advisor: Dr. Edwin Jones 1 Client: Paul Jewell ISU Engineering Distance Learning Facility May01-13 Design Team: David DouglasCprE Matt EngelbartEE Hank.
Slide 1 Line Current Differential Application on Short Lines Presentation to SSCET October 26 th, 2012.
Protection of Microgrids Using Differential Relays
Department of Electrical Engineering Southern Taiwan University of Science and Technology Robot and Servo Drive Lab. 2015/11/20 Simple position sensorless.
Michael Lisoski Leblanc Meneses Jason Schaer Bryan Staton.
June 11, 2010NATIONAL POWER ELECTRONICS CONFERENCE1 A HARDWARE GRID SIMULATOR TO TEST GRID-CONNECTED INVERTER SYSTEMS ARUN KARUPPASWAMY B DR.VINOD JOHN.
ECE445: The Design Review Sept 2, Documentation Roadmap Request for Approval Proposal Design Review Final Paper &Presentation Sept 10Sept 16Sept.
Queensland University of Technology CRICOS No J Protection of distributed generation connected networks with coordination of overcurrent relays.
11 New Setting Free Algorithm for Out of Step Tripping Sept MOSCOW H Kang – ART Areva T&D B Cvorovic, P Horton- SAS Areva T&D.
David Lorrain Christian Washington John West Chris Le Meggie Alleman October 25, 2012 Team 10Advisor: Dr. Jerry Trahan.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call April 20, 2015 Sam Francis Oncor Electric Delivery.
Announcements Read Chapters 10 and 11
Air Conditioning Experiment Department of Mechanical Engineering University of Delaware.
Mid – Semester Presentation Senior Design February 18, 2010.
ECE791 Senior Design Experience Project Requirements and Timeline.
Cheng-Ting Hsu Presenter: Cheng-Ting Hsu Cogeneration System Design for a High-Tech Science-Based Industrial Park Department of Electrical Engineering.
Plasma Sense Amplifier
Abstract Each July, the Association for Unmanned Vehicle Systems International holds an annual International Aerial Robotics Competition (IARC), with major.
Tim Southerton Brian Grosso Matthew Morris Lalit Tanwar Kevin Meehan Alex Reid.
Client Senior Design Electrical and Computer Engineering Iowa State University Introduction Abstract Architectural plans are currently being developed.
Sub-Synchronous Frequency Detection Using SEL OGIC ® Control Equations SSF Relay ERCOT Workshop NPRR562 Subsynchronous Resonance Larry Gross.
Generation Protection 2016 Operator Training Seminar Billy Lee System Operations Administrator Spring 2016.
Protection of Power Systems
Undergraduate Research: Challenges, Rewards, and Lessons Learned ASEE SE Conference Louisville, KY, 2 April 2007 Robert J. Barsanti Jr. Associate Professor.
Protection of Power Systems
Assumptions Limitations
Microcontroller Enhancement Design Project
Turbomachinery Flow Visualization P08453
Team Members: Kyle Jones Mark Magee Jason Rippee
Wind Turbine Energy Conversion System Design and Integration
Transformer Testing Station
October 9, 2003.
Presentation transcript:

SyncGen Multiple Unit Selectivity for Stator Ground Faults Using a Sensitive Directional Element Snapshot Presentation

Team SyncGen Sponsor – Lawrence Gross Relay Application Innovation Advisor – Brian Johnson Webmaster / Client Contact – John Trombetta Team Contact – Robert Schloss Documentation Manager – Jason Panos

Background Research and testing of stator ground protection methods for high speed synchronous generators RAI customer has multiple generators on ungrounded bus using traditional protection scheme detecting faults from neutral overvoltage Interested in a faster and more robust protection scheme for their system

Traditional Protection

The Problem Multiple generators on a common ungrounded bus Fault seen on all generators Impossible to directly isolate the faulted generator from system measurements Units must be sequentially tripped until the faulted generator is isolated Non-faulted machines must be restarted if tripped in the detection process Leads to large disturbances in the system

The Solution New microprocessor relay algorithms and low ratio CTs designed to detect zero sequence current flow Detect stator ground faults from zero sequence current flow Zero sequence current flows into the faulted unit and away from non-faulted units Faulted unit easily isolated so other units on the bus unaffected

Testing Test the method of stator ground fault detection from zero sequence current flow on the 20kVA generator in the model power system Induce faults in the stator to determine how far into the winding faults can be detected A second generator on the ungrounded bus will allow us to prove the non-faulted generator will be unaffected Two custom SEL-351 relays with low ratio CTs will be used for the fault detection and tripping

Deliverables Equations for the level of selectivity that can be achieved on a system based on values of relay sensitivity, CT ratios, generator impedances, and relay settings Level of stator protection obtainable Relay settings, test cases, test bed Fault simulation results Compare results to the traditional scheme Presentation paper for WPRC in October

Constraints Operational limits of laboratory generators Limit to the level of faults we can safely induce without damaging the machine IEEE standards of protection Ratio of CTs in the SEL-351

Budget Hardware and Supplies: Model Power System, instruments, CT’s, laptop, MathCAD, photocopying, supplies, posters = $200 Two SEL-351’s = $7,060 (loaned) Facilities: Shop $25 per hour (We do not believe we will need any.) Engineering Time: Three 10 hours a week * 24 weeks = $36,000 Dr. 2 hours a week * 24 weeks = $7,200 Total Estimated Cost: $50,460

Schedule / Time Line Accelerated Time line Want to present findings at WPRC Testing completed by July 26 to finalize draft Rough draft of paper complete by August 4 if accepted for WPRC

Major items for Spring Semester IPS – Completed Abstract for conference – In progress Lab familiarization – Apr Begin Testing – May 1

Major Items for Summer Testing – Completed July 26 Draft of Paper for WPRC – Aug 4 Review with sponsor/PPT development for WRPC

Major items in Fall Semester Final Paper – Sept 15 Conference – Oct 17-19

Questions?