14 October 2004AME 470 – Team Unum PDR #11 – 18 November 2004 Housing and Packaging Issues Frankie Bott Tim Culbertson Team UNUM.

Slides:



Advertisements
Similar presentations
Handheld Wireless GPS Tracking Device Senior Design EEL 4914C : UWF, Fall 2006.
Advertisements

Disassembly of a Single Use Camera Cj Coakley Steve Jesukiewicz Maureen Mittura Michael Sanders.
Automated Golf Ball Teeing System Mr. Tee - The Automated Golf Buddy Jeremy Woods Mike Seyboth Tim Walker Tomas Krones.
Problems Encountered - Up to Midterm State Machine Transitions Much Too Fast - Solved by Decreasing Clock (LED Circuit) Difficult to Test LED (Column)
From 2D Package to 3D Form Product Design Sketching Activity.
14 October 2004AME 470 – Team Unum PDR #6 – 14 October 2004 Electrical Components Chris Tilton Team UNUM.
Speaker Timing System for the Western Protective Relay Conference ECE 481 Detailed Design Review September 15, 2006 Team Time’s UP! Frank Gonzales Tim.
Mr. Mixer (Automatic Mixing Machine) Final Presentation Alex Rust & Nate Lamie.
Pratham Presenter: Nick Martin Team Leader: Matt Ryan Chief Engineer: Gabe Letona Fabrication: Reed Langton CADCAM: Fraterno Vila Electronics/Control Engineer:
10/7/04AME 470 – Team Unum Team Unum PDR #5 – 10/7/04 Flow Control and Pressure Sensing System.
4 November 2004AME 470 – Team Unum PDR #9 – 4 November 2004 Product Control and Microprocessor Programming Chris Tilton Team UNUM.
7 December 2004AME 470 – Team Unum Critical Design Review Team Unum University of Notre Dame AME 470 Ltd.
Handling Large Projects  Project Decomposition  Stepwise Refinement Functional Decomposition Design Decomposition  Work Breakdown Structures (WBS)
14 October 2004AME 470 – Team Unum PDR #10 – 11 November 2004 Subsystem Integration Tim Culbertson Team UNUM.
Loran-C Receiver Team Deathstar: Christopher Birschbach Matthew Hayman Matthew Anderson Christina Corner Erin Mowbray October 5, 2004 ECEN 4610 Capstone.
9/30/04AME 470 – Team Unum Team Unum Connection System to Air Source and Inflatables PDR # 4 September 30, 2004.
10/28/04AME 470 – Team Unum Team Unum List of Parts 10/28/04 Frances Bott.
IB Computer Science: 1.6 Software Design Created by Kevin Scott.
Planning. SDLC Planning Analysis Design Implementation.
2 Lines Electronics I 2 C Analyzer Ching-Yen Beh Robert S. Stookey Advisor: Dr. J. W. Bruce.
PROPOSED APPROACH A clear, aesthetically pleasing casing shall be used. Two digital displays: standard and binary. Components shall be fixed onto a printed.
Status Report #7 Portable Solar Power Supply Team# 13 Eric Camacho John Michael McLeod Ky Dinhquoc Nguyen Kelechi (Kc) Nwogu 03/23/2011.
Status Report #8 Portable Solar Power Supply Team# 13 Eric Camacho John Michael McLeod Ky Dinhquoc Nguyen Kelechi (Kc) Nwogu 04/06/2011.
Leakage Current Detection System for Insulated Boom Trucks Team: Josh Struble (EE) Eli Forney (EE) Chris Hulsebus (EE) Lynn Nguyen (EE) Advisors: Glen.
PDR #8: Parts, Sources & Costs Team ACME Andrew Henebry, Tom Lauducci, Megan Snyder, Tim Stonelake.
Stefan Campbell: TEAM LEADER Carlos Celada:CHIEF ENGINEER Chris Villani:ELECTRONICS ENGINEER Laurel Weiske:CAD/CAM SUPERVISOR *All members will be equally.
Follow us on: TAMU Jobs Online System Upgrade Presented to HR Liaison Network Fall Meeting 2012 October 31, 2012.
Introduction to Design. Five Stage Electronic Design and Fabrication Process Design Stage Drawing Stage Experimentation Prototyping Stage Testing / Troubleshooting.
Shooting targets at varying unknown distances can be a challenge even for experienced shooters. Judging bullet drop can be a difficult task, and manual.
Status Report #6 Portable Solar Power Supply Team# 13 Eric Camacho John Michael McLeod Ky Dinhquoc Nguyen Kelechi (Kc) Nwogu 02/28/2011.
Designing An Electronic Trigger For A Paintball Marker To Allow User Selectable Firing Rates Team WTR.
Final Demonstration Team 2A The Charles Machine Works Downhole Generator Project.
UEET 101 Reverse Engineering Group Project
FM CONVERTER. Team Members Dan Harkins Team Leader Beau Blackwell George Henry Shawn Welch Dr. Georgios Lazarou Advisor.
Trey Herrington Electrical Engineer - Backup Power Supply - Backup Power Supply - PCB Design - PCB Design Samantha Prine Electrical Engineer -Enclosure.
Mountain Bike Rallying SDII Final Presentation November 25, 2008.
Product Analysis Tesco Cordless Jug Kettle
Industry Systems Input, Process or Output? Click on the right part of the system to move on.
ECE 477 Final Design Review
1 VV Support Fixture FPA Stage 1 PDR Review August 10, 2005 T. Brown.
Programming 2 Intro to Java Machine code Assembly languages Fortran Basic Pascal Scheme CC++ Java LISP Smalltalk Smalltalk-80.
R16601: Glass Fab Wire Saw Integration/Roadmap. “Glass Fab, Inc. is currently looking to replace their wire glass cutting saw with a smaller, more efficient.
High-level language programming paradigms. Programming languages come in many forms or 'paradigms'. Each form of language offers advantages over other.
The Camera Control System. Ruth Ayalon - ME Erin Gillespie - ME Claudia Forero - ISE Jennifer Grant - EE Manny Maceda - EE Chris Nimon - EE Edward Yiu.
Morgan Kaufmann Publishers
Past, Present and Future
System Design Ashima Wadhwa.
ECE 477 Final Presentation Team 04  Spring 2010
Samyukta Gade Materials Engineering, Cal Poly IME 458
We are Wireless Audio (WaWA)
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
ECE 477 Digital Systems Senior Design Project  Spring 2006
Group 11.
JSAL Team.
ECE 477 Final Presentation Group 5  Spring 2005
Ask yourself these questions when writing a specification
ME 280 Lab Final Project Begins November 3rd for sections 3, 4 and 5, and November 7th for sections 1 and 2 Due December 1st for sections 3, 4 and 5 and.
IENG 217 Cost Estimating for Engineers
Packaging Considerations
Advanced Energy Vehicle
SHU: The Running Companion
Project Work Breakdown Structure
Small, Lightweight Speed and Distance Sensor
Tub Lift Rev. 2 Dom Group
ME 280 Lab Final Project Begins November 5th for sections 4 and 6, and November 9th for sections 1, 2 and 3 Due December 2nd for sections 1, 2 and 3 and.
My design (camera and packaging) may meet the following points:
ME 280 Lab Final Project Begins November 4th for sections 3, 4 and 5, and November 8th for sections 1 and 2 Due December 2nd for sections 3, 4 and 5 and.
For More Details:
LET’S PLAY JEOPARDY!!.
Presentation transcript:

14 October 2004AME 470 – Team Unum PDR #11 – 18 November 2004 Housing and Packaging Issues Frankie Bott Tim Culbertson Team UNUM

14 October 2004AME 470 – Team Unum Rapid-prototyping our Housing Approximately 36 hours per shell $2/hr for machine +$10/hr for Strebinger’s time Total Estimated Cost = $150 Important part of our design (detailed housing design)

14 October 2004AME 470 – Team Unum Details of Lower Housing

14 October 2004AME 470 – Team Unum Details of Upper Housing

14 October 2004AME 470 – Team Unum Outer Details of Housing BUTTONS MICROPROCESSOR AND POWER LCD AIR HOSE

14 October 2004AME 470 – Team Unum Final Design Considerations No need for microprocessor/power accessibility Will be battery operated and preprogrammed Ergonomic Design Easier for user to hold and operate Smaller Package Refined design with smaller components, improved portability Improved User Interface Tested user interface will be improved

14 October 2004AME 470 – Team Unum Upcoming Activities Assembly Debugging Programming Testing Working Product Questions?