Robert L Renshaw, Jr.. Campus Layout Project Specifications Design a wiring plan and Networking/Internetworking solution for an Ethernet extended star.

Slides:



Advertisements
Similar presentations
Chapter 3: Planning a Network Upgrade
Advertisements

Antonio González Torres
Communications Room: Router/WAP, Switch, Server, Patch Panel Communications Room: Router/WAP, Switch, Server, Patch Panel Hard-wired Ethernet Ports… Site.
Chapter 7: Intranet LAN Design
LAN Maps & Symbols Topologies & Devices. Physical & Logical Topologies Physical Topologies define the actual layout of the wire (media). For example,
Chapter 4 – Cisco Semester I
Network Engineering Taster Day Mark Clements. 30 March 2012Engineering Taster Day 2 Welcome to Engineering Taster Day: Morning Session Ambassadors Fire.
Top-Down Network Design Chapter Ten Selecting Technologies and Devices for Campus Networks Oppenheimer.
Module 5 - Switches CCNA 3 version 3.0 Cabrillo College.
CIT 470: Advanced Network and System Administration
Cisco 3 - Switches Perrine - Brierley Page 15/10/2015 Module 5 Switches LAN Design LAN Switches.
Threaded Case Study on RE Miller By Aidan Coleman Paul Guilfoyle.
Threaded Case Study - RE Miller (Nick Effler, Brian Ford, Cindy Coultas & Teresa Duchardt) April-May, 2000 b Project Goals Implement WAN Access to connect.
1 © 2003, Cisco Systems, Inc. All rights reserved. CCNA 3 v3.0 Module 5 Switches.
Ch.6 - Switches CCNA 3 version 3.0.
IT. Support Networking Threaded Case Study School: R.E. Miller By: Shane Coyne. Andrea Martyn. Gary Hall. Barry Gray. Presented by: Gary Hall & Andrea.
ROYAL PALM NETWORK PROJECT John Healy Tom Jamieson
Networking Project Ailis&Louise. General Requirements The Washington School District is in the process of implementing an enterprise wide network which.
Institute of Technology, Sligo Dept of Computing LAN Design Semester 3, Chapter 4.
1 CCNA 3 v3.1 Module 5. 2 CCNA 3 Module 5 Switches/LAN Design.
NETWORK DESIGN Customer requirements Network topologies Cable choice Hardware TSB 75 TSB72.
ACACIA Threaded Case Study Seamus Burns Ronan Conaghan Eugene Cullen.
Acacia Threaded Case Study Aoife McIntyre Cordelia Carty Mary Kearns.
Designing and Implementing Cabling Infrastructure Dr. Saif al Zahir King Fahd University of Petroleum & Minerals Computer Engineering Department Dr. Saif.
ACACIA Threaded Case Study Presented By: Louise Maguire, Caroline Kearney, Peter Honeyman, Michael Mctague.
1 Design and Documentation Honolulu Community College Cisco Academy Training Center Semester 1 Version
CSE 550 Computer Network Design Dr. Mohammed H. Sqalli COE, KFUPM Spring 2007 (Term 062)
How to Build a CAN Last Update Copyright Kenneth M. Chipps PhD 1.
What Is Network ?. A Network is a connected collection of devices and systems, such as computers and servers, which can communicate with each other.
Cable.ppt CCNA Exploration Semester 1 Chapter 10
Cisco’s Threaded Case Study Desert View
Cisco Threaded Case Study
By H.B.O. Systems July 13, 2000 Presenters: Janet Hughes, John Banister, Karen Oliver.
LAN Design of a Local High School Martin Kucek Chris C. Yu Sandy Ramirez Cisco TCS Project – Semester 3 © 2001 Martin Kucek / Chris C. Yu / Sandy Ramirez.
Robert E. Meyers CCNA, CCAI Youngstown State University Cisco Regional Academy Instructor Cisco Networking Academy Program Semester 3, v Chapter.
1 © 2003, Cisco Systems, Inc. All rights reserved. CCNA 3 v3.0 Module 5 Switches.
1 CCNA 3 v3.1 Module 5 Switches Claes Larsen, CCAI.
LAN DESIGN – first step 5 ISB – school year 2006/07.
Cisco 3 - Switches Perrine - Brierley Page 112/1/2015 Module 5 Switches.
Design and Documentation Chapter 8. Network Design Issues Your first step in the process is to gather information about the organization. This information.
1 Ram Dantu University of North Texas, Practical Networking.
LAN DESIGN Akhyari Nasir TATiUC.
Troubleshooting Networking Problems
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.1 Planning a Network Upgrade Working at a Small-to-Medium Business or ISP – Chapter.
Practical Networking.
Discovery 2 Internetworking Module 3 JEOPARDY K. Martin.
1 © 2004, Cisco Systems, Inc. All rights reserved. CCNA 3 v3.1 Module 5 Switches.
Sally Marable MEDT 7477 Spring Hull-Sanford Elementary School uses a client-server Ethernet network with a star topology. The Main Distribution.
LAN WAN MDF IDF Networked Clients Main Distribution Frame Server room/MDF Intermediate Distribution Frame Server Tech Room.
Peachtree Elementary (Gwinnett County) Network Infrastructure Melissa Campbell Gwinnett County Public School’s (GCPS) Local Area Network (LAN) consists.
Presentation on TCS By : 1. Ershad Islam 2. Maung Han Soey 3. Shaon Shahriar 4. Ahsanul Haque.
Threaded Case Study of Bangladesh Internet Press Ltd. (BIPL) By: Md. Ikbal Zavid Abul Kalam Asad Supervise By: Debanon Datta Legal Main Contact, CNAP Ahsanullah.
Introduction to Networks v5.1 Chapter 4: Network Access.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Planning a Network Upgrade Working at a Small-to-Medium Business or.
Physical Network Design. Phiysical Network Design Selecting Technologies and Devices for – Campus Networks – Entreprise Network.
Threaded Case Study Acacia School Project Project Members: Md. Shafayet Hossain Md. Shakhawat Hossain Md. Moniruzzaman Md. Maksudur Rahman.
Networking Solutions Chapter 3 – Networking Topologies, Connectors, & Wiring Standards.
An overview of the major components
Structural cabling.
CCNA 3 v3 JEOPARDY Module 5 CCNA3 v3 Module 5 K. Martin.
LAN Design Broadcast and Collision Domains
Making an Ethernet Cable
Structured cabling What, why & how.
CCNA 3 v3.1 Module 5 Switches.
Essentials of Networking
Module 5 - Switches CCNA 3 version 3.0.
Switching Basics and Intermediate Routing CCNA 3 Chapter 5
Главни развод (MC) главна тачка концентрације
Структурно каблирање Систематски приступ каблирању
Ram Dantu University of North Texas,
Presentation transcript:

Robert L Renshaw, Jr.

Campus Layout Project Specifications Design a wiring plan and Networking/Internetworking solution for an Ethernet extended star topology LAN that uses both fiber- optic and CAT 5 UTP cabling. Project Specifications Design a wiring plan and Networking/Internetworking solution for an Ethernet extended star topology LAN that uses both fiber- optic and CAT 5 UTP cabling. Robert L Renshaw, Jr.

Totals MDF 24 Devices 12 Rooms IDF M1 22 Devices 11 Rooms Total 46 Devices 23 Rooms Totals MDF 24 Devices 12 Rooms IDF M1 22 Devices 11 Rooms Total 46 Devices 23 Rooms POP MDF IDF M1 Main Building First FloorCatchment Areas

Robert L Renshaw, Jr. IDF M2A IDF M2B TOTALS IDF M2A 20 Devices 10 Rooms IDF M2B 20 Devices 10 Rooms Total 40 Devices 20 Rooms TOTALS IDF M2A 20 Devices 10 Rooms IDF M2B 20 Devices 10 Rooms Total 40 Devices 20 Rooms Main Building Second FloorCatchment Areas

Robert L Renshaw, Jr. TOTALS IDF E1 30 Devices Total 30 Devices 15 Rooms TOTALS IDF E1 30 Devices Total 30 Devices 15 Rooms IDF E1 East Building First FloorCatchment Area

Robert L Renshaw, Jr. TOTALS IDF E2 30 Devices 15 Rooms TOTALS IDF E2 30 Devices 15 Rooms IDF E2 East Building Second FloorCatchment Area

Robert L Renshaw, Jr. TOTALS IDF W1 30 Devices 15 Rooms TOTALS IDF W1 30 Devices 15 Rooms IDF W1 West Building First FloorCatchment Area

Robert L Renshaw, Jr. TOTALS IDF W2 28 Devices 14 Rooms TOTALS IDF W2 28 Devices 14 Rooms IDF W2 West Building Second FloorCatchment Area

Project Totals Main Building First Floor - 23 Rooms, 46 Computing Devices Second Floor - 20 Rooms, 40 Computing Devices East Building First Floor - 15 Rooms, 30 Computing Devices Second Floor - 15 Rooms, 30 Computing Devices West Building First Floor - 15 Rooms, 30 Computing Devices Second Floor - 14 Rooms, 28 Computing Devices Total 102 Rooms 204 Computing devices Project Totals Main Building First Floor - 23 Rooms, 46 Computing Devices Second Floor - 20 Rooms, 40 Computing Devices East Building First Floor - 15 Rooms, 30 Computing Devices Second Floor - 15 Rooms, 30 Computing Devices West Building First Floor - 15 Rooms, 30 Computing Devices Second Floor - 14 Rooms, 28 Computing Devices Total 102 Rooms 204 Computing devices Robert L Renshaw, Jr.

Tyingitall TOGETHER TOGETHER Robert L Renshaw, Jr.

Main Building First Floor Cut-Sheet Diagram MDF IDF M1 Robert L Renshaw, Jr. POP

MDF Wire Map Robert L Renshaw, Jr.

IDF-M1 Wire Map Robert L Renshaw, Jr.

Main Building Second Floor Cut-Sheet Diagram IDF M2B IDF M2A Robert L Renshaw, Jr.

IDF-M2A Wire Map Robert L Renshaw, Jr.

IDF-M2B Wire Map Robert L Renshaw, Jr.

East Building First Floor Cut-Sheet Diagram IDF E1 Robert L Renshaw, Jr.

IDF-E1 Wire Map Robert L Renshaw, Jr.

East Building Second Floor Cut-Sheet Diagram IDF E2 Robert L Renshaw, Jr.

IDF-E2 Wire Map Robert L Renshaw, Jr.

West Building First Floor Cut-Sheet Diagram IDF W1 Robert L Renshaw, Jr.

IDF-W1 Wire Map Robert L Renshaw, Jr.

West Building Second Floor Cut-Sheet Diagram IDF W2 Robert L Renshaw, Jr.

IDF-W2 Wire Map Robert L Renshaw, Jr.

West Building East Building Fiber-Optic Backbone Topology MDF POP IDF E2 IDF W2 IDF W1 IDF M1 IDF M2A IDF M2B IDF E1 Main Building Robert L Renshaw, Jr.

MDF Cut-sheet SW-MDF Workgroup Switch To SW-M1 in IDF-M1 To SW-M2A in IDF-M2A To SW-E1 in IDF-E1, SW-W1 in IDF-W1 & POP via Fiber Distribution Panel located in the POP RTR-MDF Router Robert L Renshaw, Jr.

IDF-M1 Cut-sheet SW-M1 Workgroup Switch To SW-MDF in MDF Robert L Renshaw, Jr.

To SW-M2B in IDF-M2B To RTR-MDF in MDF IDF-M2A Cut-sheet SW-M2A Workgroup Switch Robert L Renshaw, Jr.

IDF-M2B Cut-sheet SW-M2B Workgroup Switch To SW-M2A in IDF-M2A Robert L Renshaw, Jr.

To SW-E2(W2) in IDF-E2(W2) To Fiber Distribution Panel in POP IDF-E1 & IDF-W1 Cut-sheet SW-E1(W1) Workgroup Switch Robert L Renshaw, Jr.

IDF-E2 & IDF-W2 Cut-sheet SW-E2(W2) Workgroup Switch To SW-E1(W1) in IDF-E1(W1) Robert L Renshaw, Jr.

To SW-E1 in IDF-E1 To SW-W1 in IDF-W1 To RTR-MDF in MDF POP Cut-sheet Fiber Distribution Panel Robert L Renshaw, Jr.

Backbone Cabling Wire Map Robert L Renshaw, Jr.

Equipment & Pricing Equipment & Pricing Robert L Renshaw, Jr.

MDF Equipment Rack Fiber-Optic Distribution Panel Patch Panels (UTP) Router (with Fiber-Optic Module) Workgroup Switch (SW-MDF) Robert L Renshaw, Jr.

POP Equipment Rack Fiber-Optic Distribution Panel (Horizontal Cross Connect) Fiber-Optic Distribution Panel (Main Cross Connect) Robert L Renshaw, Jr.

IDF Equipment Racks Patch Panels (UTP) Fiber-Optic Distribution Panel Workgroup Switches (SW-IDF-M1) (SW-IDF-M2A) (SW-IDF-M2B) (SW-IDF-E1) (SW-IDF-E2) (SW-IDF-W1) (SW-IDF-W2) Robert L Renshaw, Jr.

Cisco 7505 Interface Processor (Modular Router) Robert L Renshaw, Jr.

Cisco 7505 Router Modules 10BaseT Multi-Mode Fiber Single-Mode Fiber Robert L Renshaw, Jr.

Workgroup Switches Catalyst 3500 XL Series Robert L Renshaw, Jr.

Patch Panels 48 port Fiber Distribution(5.25"x19") uses 3 rack spaces CAT 5 Patch Panels Robert L Renshaw, Jr.

Project Expenses Robert L Renshaw, Jr.

Designed and presented by: Robert L Renshaw, Jr.