March 2009LOFAR MKSP Update: SKA and PrepSKA Paul Alexander.

Slides:



Advertisements
Similar presentations
SKA New Technology Demonstrator Ray Norris CSIRO Australia Telescope National Facility.
Advertisements

SKADSMTAvA A. van Ardenne SKADS Coördinator ASTRON, P.O. Box 2, 7990 AA Dwingeloo The Netherlands SKADS; The.
Square Kilometre Array (SKA) Project PRE-CONSTRUCTION PHASE Briefing for Industry & Science Organisations Tuesday 14 th August Wellington.
SADC HPC Workshop, 2 Dec 2013, Cape Town
November 2004 The Research Infrastructures in FP7 DG RTD – Directorate ‘Structuring ERA’
Paul Alexander DS3 & DS3-T3 SKADS Review 2006 DS3 The Network and its Output Data Paul Alexander.
Jan Geralt Bij de Vaate DS4-T4 Wideband Integrated Antennas DS4-T4 Jan Geralt Bij de Vaate ASTRON.
Schediwy: Advantages and Disadvantages of Sparse Aperture Arrays Fermilab: October 2009.
5-6 May 2009 AWG Meeting LAX1 Technology Development Project US contributions to global.
Update on the SKA R. T. Schilizzi AA 13 December 2011.
SKA South Africa Overview Thomas Kusel MeerKAT System Engineering Manager April 2011.
System designAA Consortium - BolognaOctober 2012 AA Consortium AA System configuration options 23 October 2012.
Paul Alexander, Peter Hall Design Issues and Implementation ChallengesAAVP 2010 Design issues and implementation challenges Paul Alexander and Peter Hall.
SPDO report Richard Schilizzi and Peter Dewdney US SKA Consortium Meeting Madison, 17 November 2008.
Dec 2010 AAVP Cambridge workshop AAVP AAVS1/2-low demonstrators Jan Geralt Bij de Vaate.
AA-mid demonstrator Dion Kant AAVP – 10 December 2010, Cambridge, UK.
Name1 SKA(DS) System Design Aspects 4 th SKADS Workshop, Lisbon, 2-3 October 2008 SKA(DS) System Design Aspects: building a system Laurens Bakker.
SKA-Japan Industry Forum [SKA-Japan Workshop 2010] EMC & Microwave Systems November 05, 2010.
Georgina Harris1 2-PAD 4 th SKADS Workshop, Lisbon, 2-3 October Polarisations All Digital Dr Georgina Harris / Prof Tony Brown SKADS System Design.
Bi-Directional RF Data Communication A Robot Control Device Team BDRFC.
AA-Low Technical Progress Meeting, October 2012, Medicina, Italy AAVS0 & AAVS0.5: System Design and Test Plan Nima Razavi-Ghods Eloy de Lera Acedo.
Ian McCrea STFC Rutherford Appleton Laboratory Chilton, Oxfordshire, UK On behalf of the EISCAT_3D Project Consortium.
The Preparatory Phase Proposal a first draft to be discussed.
DVA Series Work Flow P. Dewdney Apr 15, SPDO DVP Work Flow 2 DVA-1 CPG.
SKA Introduction Jan Geralt Bij de Vaate Andrew Faulkner, Andre Gunst, Peter Hall.
EPOS Preparatory phase Torild van Eck (ORFEUS) Call INFRA Deadline: December 3, 2009 Funding: between 3 and 6 MEuro Duration: max 4 year.
S. Montebugnoli 2 nd SKADS Workshop October 2007 Stelio Montebugnoli IRA - INAF- Italy.
SKA – The Reference Design Peter Hall SKA International Project Engineer, ISPO Next-Generation Correlators Workshop Groningen, June.
Transition from SKADS to PrepSKA Richard Schilizzi Lisbon, 3 October 2008.
André van Es 2 nd SKADS Workshop October 2007 Review on Deliverables and forward look André van Es.
Andrew Faulkner1 Technology Readiness Levels 4 th SKADS Workshop, Lisbon Technology Readiness Levels TRLs Andrew Faulkner.
Rosie Bolton1 SKADS Costing work 4 th SKADS Workshop, Lisbon, 2-3 October 2008 SKADS Costing work: Spreadsheets to scalable designs Rosie Bolton Dominic.
Andrew Faulkner1 SKADS and SKA 4 th SKADS Workshop, Lisbon SKADS and SKA Andrew Faulkner.
3rd September 2006SKADS Workshop 2006Mike Garrett 1 DS2 - Science & Data Simulations Mike Garrett (JIVE)
Paul Alexander & Jaap BregmanProcessing challenge SKADS Wide-field workshop SKA Data Flow and Processing – a key SKA design driver Paul Alexander and Jaap.
1 Support for New Research Infrastructures in the EU 7 th Framework Programme for Research Elena Righi European Commission SKADS Workshop, Paris, 4 September.
CRISP & SKA WP19 Status. Overview Staffing SKA Preconstruction phase Tiered Data Delivery Infrastructure Prototype deployment.
Rosie Bolton SKADS Workshop April 10th 2008 SKADS Costing work: beyond the benchmark scenario Rosie Bolton Paul Alexander, Andy Faulkner and SKADS Costing.
2 nd convergence workshop: introduction R. T. Schilizzi Penticton 22 July 2004.
AAs in PEP Jan Geralt Bij de Vaate. PEP Project Execution Plan for the pre construction phase of the SKA Consortium to be formed AA-low ready for construction.
SKA System Design Kobus Cloete 9 December 2010 AAVP Workshop "Exploring the Universe with the world's largest radio telescope"
Integrated receivers for mid-band SKA Suzy Jackson Engineer, Australia Telescope National Facility SKADS FP6 Meeting – Chateau de Limelette – 4-6 November,
SKA DRAO SKA success dependent on technology development –major improvements in price/performance Survey Speed -> (A eff / T sys ) 2 x Field of View.
Andrew Faulkner 2 nd SKADS Workshop October 2007 SKADS Benchmark Scenario Andrew Faulkner.
Peter Wilkinson1 Conclusions 4 th SKADS Workshop, Lisbon, 2-3 October 2008 SKADS aims to –Demonstrate SKA Scientific Viability and Readiness –Demonstrate.
Peter Wilkinson SKADS Workshop: Paris 10 October nd SKADS Workshop: Introduction “What is it about?” Peter Wilkinson University of Manchester.
MeerKAT DBE Past Present Future Alan Langman 28 September 2009.
1 ASTRONET Coordinating strategic planning for European Astronomy.
System designAA Consortium - BolognaOctober 2012 AA Consortium The path to AAVS1 22 October 2012.
ASKAP: Setting the scene Max Voronkov ASKAP Computing 23 rd August 2010.
Australian SKA Pathfinder (ASKAP) David R DeBoer ATNF Assistant Director ASKAP Theme Leader 06 November 2007.
Summary of the Paris SKA Meeting 4-8 September 2006 R. T. Schilizzi.
Andrew Faulkner1 DS4 Deliverables 4 th SKADS Workshop, Lisbon DS4 Deliverables Andrew Faulkner.
Roshene McCool1 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Local Oscillator distribution over fibre Roshene McCool SPDO – Signal.
Paul Alexander 2 nd SKADS Workshop October 2007 SKA and SKADS Costing The Future Paul Alexander Andrew Faulkner, Rosie Bolton.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Project Management Plan. Project Organisation DVA-1 Board n One member for each stakeholder n Oversees execution of DVA-1 on time and within budget n.
Rosie Bolton 2 nd SKADS Workshop October 2007 SKADS System Design and Costing: Update and next steps Rosie Bolton University of Cambridge.
1 1 SKA - CRISP WP19 17 th March 2013 Dr. Rahim Lakhoo (a.k.a Raz) P.I – Dr. David Wallom.
Square Kilometre Array eInfrastructure: Requirements, Planning, Future Directions Duncan Hall SPDO Software and Computing EGEE 2009.
Paul Alexander1 DS3 Deliverable Status 4 th SKADS Workshop, Lisbon, 2-3 October 2008 DS3 Deliverables Review.
Engineering Commissioning May 2016 SKA1 LOW – Assembly, Integration & Verification Adam MacLeod AIV Consortium Manager & ASKAP System Engineer.
Andrew Faulkner April 2016 STFC Industry Day: Low Frequency Aperture Array Andrew Faulkner Project Engineer.
Mid Frequency Aperture Arrays
Aperture Array Station Processing
Technical Foundations & Enabling Technologies – DS4
SKADS White Paper - Technologies -
DVA1 as Part of the Dish Verification Program (DVP) Washington, DC P
A Draft Funding Model for the SKA
ASTRONET Coordinating strategic planning for European Astronomy
Presentation transcript:

March 2009LOFAR MKSP Update: SKA and PrepSKA Paul Alexander

March 2009LOFAR MKSP Overview –Internationally coordinated project has really started – PrepSKA –SKA Programme Development Office (SPDO) coordinating development work –Three concept specifications defined (Memo 100) –Reference science plan currently being constructed against which concept specifications will be tested –Costed system design by 2012 Q2 (2013 Q2)

March 2009LOFAR MKSP

March 2009LOFAR MKSP Specifications Freq RangeCollectorA eff /T sys Survey Speed m 2 K -1 m 4 K -2 deg 2 70 – 450MHzSparse AA4-10,0003x – 1000MHzDense AA10,0002 x MHz 0.8 – 10 GHZ m Dish10,0004x10 7 Wide-band 1.4 GHz

March 2009LOFAR MKSP Frequency (MHz) Sky Brightness Temperature (K) A eff A eff /T sys Fully sampled AA-hi Sparse AA-lo T sky Becoming sparse above f AA A eff / T sys (m 2 / K) Tailoring the AA system Dishes 800MHz

March 2009LOFAR MKSP Conceptual Configuration Station Core ~5km dia Central Processing Facility Comms links Not to scale! 180km Dishes spread along spiral Dishes AA-hi AA-lo ~250 Aperture array stations ~2500 Dishes

March 2009LOFAR MKSP Where are we in the Global Project? 2020-Operations and science exploitation 2020Completion of Phase Construction of Phase-2 and Initial science Production verification and Phase-1 construction 2011Site selection Technology development 2006Short listing of sites Technology research 2000Start of global project SKADS PrepSKA

March 2009LOFAR MKSP ESFRI Body set up by European Science Ministers To develop a strategic roadmap for major Research Infrastructures (RIs) in Europe Based on international peer- review RIs must be –Of Pan-European interest –At a mature level –Some projects of global dimension ELT FAIR KM3NET SKA (Global) SPIRAL2

March 2009LOFAR MKSP PrepSKA Awarded €5.5M from EC + larger national matching funds PrepSKA will address the following: Design of the SKA SKA location Legal framework and governance structure for the SKA Cost-effective mechanisms for SKA procurement SKA funding Socio-economic impact of the SKA WP #TitleBudget (€k) 1 PREPSKA Mgmt SKA Design SKA Site Studies SKA Governance SKA Procurement + industrial involvement Developing SKA funding model Production of implementation plan 60 Total 5500 Will deliver the design and plan for a coordinated funding proposal submission to governments in early 2012.

March 2009LOFAR MKSP SKA Global Collaboration

March 2009LOFAR MKSP SKA Project organisation SSEC SKA Science & Eng. Committee FAWG Funding Agencies Working Group SSEC SKA Science & Eng. Committee FAWG Funding Agencies Working Group SPDO SKA Project Development Office SPDO SKA Project Development Office Project Engineer Executive Officer Project Scientist Director

March 2009LOFAR MKSP 06 |08 |10 |12 |14 |16 |18 |20 | System Design Phase 2 construction and commissioning Sites short-listed EC-FP7: PrepSKA System design, Funding Governance, Procurement, Site Selection Preliminary SKA specs External Engineering Review of design Reference Design selected Pathfinder Suite Construction Early Science SKA mid+low Phase 2 Complete SKA Pathfinders Complete Pathfinder science Phase 1 complete Concept Design Site Select Phase 1 construction and commissioning SKA timeline AAVP AnticipatedSKAFundingDecison SKAFundingDecison Target cost for Phases 1 & 2: €1.5B

March 2009LOFAR MKSP Global Collector R&D USA Canada S.Africa Australia NL EMBRACE+2PAD

March 2009LOFAR MKSP T1T2T3T4T5T6T7T8T9 P1 SKA design SKA concept delineation SKA specification & simulations SKA life cycle study SKA operation SKA support model SKA cost optimisation SKA manufacturing studies SKA-P1 technical doc SKA system design P2 SKA-P1 Sub-system spec & evaluation SKA-P1 sub- systems specification P3 Initial Verification System IVS specification IVS construction IVS Int. & Test Aperture array verif. programme P4 Dish design & optimization Dish design 1 Basic metal Dish design 2 Composite Dish design 3 Carbon fibre Dish design 4 Hi-perf. metal P5 Feed prototyping Wideband single-pixel feeds WFoV: Aperture array tiles WFoV: Phased array feeds WFoV: Multiple-feed clusters P6 Receiver prototyping Low-noise amplifiers Integrated receivers New-gen. cryo solutions P7 Signal transport prototyping Intra-antenna data links Intra-station data links Station-core data links LO and timing Monitor & control P8 Signal processing prototyping Station DSPCorrelators Interference mitigation Non-imaging processors P9 Computing specification & prototyping Computing & software specification Computing hardware Software engineering Data products & VO plan Calibration Science post Processing P10 WP2 design study management PM SPDO project management SKA Technology Work Package Structure (ISPO)

March 2009LOFAR MKSP AAVP Aperture Array Verification Programme AAVP Coordination of the European technical work, primarily for the aperture arrays; Ensure that the verification programme for aperture arrays meets the requirements of the SKA Project; Provides a focus and information exchange for European SKA development work

March 2009LOFAR MKSP AAVP Principle Deliverables 1. Approved and verified design for Phase 1 AA integrated into the SKA-P1 system. 2. Clear development path to SKA Phase 2 AA system. A design provided with ‘Request for Quotation’ documents with substantial technical detail for industrial competitive selection and delivery of pre-production parts. These parts are expected to integrated within 2 years after funding availability (assumed coincident with PrepSKA end); Design performance verification in the form of independently refereed documentation

March 2009LOFAR MKSP AAVP Organisation Chart ESKAC + EU-PrepSKA PI’s (the ‘Board’) SPDO A3IV ASTRON Build and test astronomically capable AA. Use EMBRACE & derivatives for ongoing test and development. Domain Leaders SSEC Director & PE DAAVS UK Build, test & calibrate an all digital AA. On a representative site. Use 2-PAD & derivatives for ongoing test and development. AA-SEM Portugal Provide a site, infrastructure and power for a representative site, including solar power. Assist with detailed testing of AAs installed. AA-Tech ASTRON The development programmes for the AA sub-systems. The technology developed here are used in the demonstrators. AA-SDS UK System design studies with close connection to the requirements to meet the science goals. Inc. simulations, costing & processing requirements. AA-Lo INAF/IRA Development of the low frequency specific AA components. Most sub-systems will be re-used from AA-hi. Use lessons learned from activities in LOFAR and other LF Arrays. AAVP Team Programme - CoordinatorEngineer System EngineerScientist

March 2009LOFAR MKSP Wideband RF Beamformer 1 12 n …. Dual Pol Antennas Wideband RF Beamformer 2 12 n …. Wideband RF Beamformer m 12 n …. ….. Digitisation Signal Processing Defined Interface ….. Beamformer Control & Monitor ….. Tile processing Board: m channels 1 2 p.. Station processing & Control & Monitor ….. Calib- ration Control System Time standard Output Data Control Information Time Standard RFI Shield b, Dual Pol Beam(s) PWR One Generic Aperture Array…..

March 2009LOFAR MKSP AA-Tech Antenna elements and array design LNA and Matching RF Beamforming & analogue transport Digital processing Hardware Beamforming Algorithms Calibration Hardware & implementation Mechanical infrastructure Development of the antenna element, mechanical integration, matching with LNA and testing LNA design, differential, packaging. Works closely with element and array design. RF beamforming development, analogue input to the RFI shield bunker and input signal cond. Digital processor implementations and trade-offs. Software algorithm, development and implementation Hardware required, methodology and algorithms Structural, materials, production engineering, RFI performance. MTBF and MTTR analysis UK & NL NL France UK NL UK Italy LeadPrepSKA WP2. mapping: / 3.4

March 2009LOFAR MKSP The Technology Programme UK contribution to core SKA technology Contribute to development of AA technology for use in the SKA (following on from SKADS) Theme A Theme B

March 2009LOFAR MKSP Workpackages & Tasks Task A.1.1 Cost and design tool.2 AA cost modelling & design coord.3 Real time control & monitoring.4 System simulation A.2.1 Data Links.2 Phase transfer A.3.1 Signal processing A.4.1 Fourier-plane processing.2 Calibration & image-plane effects.3 Algorithms for transient detection.4 Data management, data flow.5 Eff. imaging algorithms & parall’n Task B.1.1 Mid-Frequency Array.2 Low frequency Array B.2.1 LNAs and element matching.2 InP LNA development.3 Gain, filtering and equalization.4 Analogue signal transport.5 Digitization B.3.1 AA infrastructure B.4.1 Calibration for the AA B.5.1 UK Contribution to the AAVP

March 2009LOFAR MKSP Conclusion Three aspects of proposed UK strategy eMERLIN – world-leading science now LOFAR – exceptional low- frequency pathfinder science soon Final goal – transformational science with the SKA

March 2009LOFAR MKSP