27-29 September 2002CrossGrid Workshop LINZ1 USE CASES (Task 3.5 Test and Integration) Santiago González de la Hoz CrossGrid Workshop at Linz,

Slides:



Advertisements
Similar presentations
LNL M.Biasotto, Roma, 22 novembre Some notes on WP6 INFN Testbed.
Advertisements

Andrew McNab - Manchester HEP - 24 May 2001 WorkGroup H: Software Support Both middleware and application support Installation tools and expertise Communication.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
Andrew McNab - Manchester HEP - 2 May 2002 Testbed and Authorisation EU DataGrid Testbed 1 Job Lifecycle Software releases Authorisation at your site Grid/Web.
Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005.
CROSSGRID WP41 Valencia Testbed Site: IFIC (Instituto de Física Corpuscular) CSIC-Valencia ICMoL (Instituto de Ciencia Molecular) UV-Valencia 28/08/2002.
NIKHEF Testbed 1 Plans for the coming three months.
Andrew McNab - Manchester HEP - 6 November Old version of website was maintained from Unix command line => needed (gsi)ssh access.
The CrossGrid project Juha Alatalo Timo Koivusalo.
Task 3.5 Tests and Integration ( Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la.
Status of Globus activities within INFN (update) Massimo Sgaravatto INFN Padova for the INFN Globus group
EC Review – 01/03/2002 – G. Zaquine – Quality Assurance – WP12 – CS-SI – n° 1 DataGrid Quality Assurance Gabriel Zaquine Quality Engineer - WP12 – CS-SI.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
Integration of DataGrid Software for Testbed 1 Goal: combine the DataGrid middleware and the Globus core services. Phases: Preparation for Integration.
Andrew McNab - Manchester HEP - 26 June 2001 WG-H / Support status Packaging / RPM’s UK + EU DG CA’s central grid-users file grid “ping”
EGEE is a project funded by the European Union under contract IST JRA1 Testing Activity: Status and Plans Leanne Guy EGEE Middleware Testing.
1 DataGRID Application Status and plans
EMI INFSO-RI EMI SA2 Report Quality Assurance Alberto Aimar (CERN) SA2 WP Leader.
C. Loomis – Testbed Status – 28/01/2002 – n° 1 Future WP6 Tasks Charles Loomis January 28, 2002
Andrew McNab - Manchester HEP - 5 July 2001 WP6/Testbed Status Status by partner –CNRS, Czech R., INFN, NIKHEF, NorduGrid, LIP, Russia, UK Security Integration.
Olof Bärring – WP4 summary- 6/3/ n° 1 Partner Logo WP4 report Status, issues and plans
Crossgrid kick-off meeting, Cracow, March 2002 Santiago González de la Hoz, IFIC1 Task 3.5 Test and Integration (
Yannick Patois – Datagrid Repository Presentation- 2001/11/21 - n° 1 Partner Logo DataGrid Software Repository presentation A short presentation of the.
Grid Workload Management & Condor Massimo Sgaravatto INFN Padova.
Grid Status - PPDG / Magda / pacman Torre Wenaus BNL U.S. ATLAS Physics and Computing Advisory Panel Review Argonne National Laboratory Oct 30, 2001.
LHCb and DataGRID - the workplan for 2001 Eric van Herwijnen Wednesday, 28 march 2001.
Quick Introduction to NorduGrid Oxana Smirnova 4 th Nordic LHC Workshop November 23, 2001, Stockholm.
First attempt for validating/testing Testbed 1 Globus and middleware services WP6 Meeting, December 2001 Flavia Donno, Marco Serra for IT and WPs.
German Cancio/ WP4 -1 WP4 comments for the TestBed German Cancio / WP4
BalticGrid-II Project BalticGrid-II Kick-off Meeting, , Vilnius1 Joint Research Activity Enhanced Application Services on Sustainable e-Infrastructure.
DataGRID WPMM, Geneve, 17th June 2002 Testbed Software Test Group work status for 1.2 release Andrea Formica on behalf of Test Group.
TERENA 2003, May 21, Zagreb TERENA Networking Conference, 2003 MOBILE WORK ENVIRONMENT FOR GRID USERS. TESTBED Miroslaw Kupczyk Rafal.
Preparation for Integration Organized access to the code WP6 infrastructure (MDS-2, RC, …) Input from WPs on requirements,... Acquire experience with Globus.
LCG EGEE is a project funded by the European Union under contract IST LCG PEB, 7 th June 2004 Prototype Middleware Status Update Frédéric Hemmer.
10 May 2001DataGrid WP6 Meeting, CERN1 GRID The GRID Installation Toolkit A brief report F. Donno INFN - Pisa.
DataGRID PTB, Geneve, 10 April 2002 Testbed Software Test Plan Status Laurent Bobelin on behalf of Test Group.
GRID Zhen Xie, INFN-Pisa, on DataGrid WP6 meeting1 Globus Installation Toolkit Zhen Xie On behalf of grid-release team INFN-Pisa.
DGC Paris WP2 Summary of Discussions and Plans Peter Z. Kunszt And the WP2 team.
29/1/2002A.Ghiselli, INFN-CNAF1 DataTAG / WP4 meeting Cern, 29 January 2002 Agenda  start at  Project introduction, Olivier Martin  WP4 introduction,
Andrew McNab - Manchester HEP - 17 September 2002 UK Testbed Deployment Aim of this talk is to the answer the questions: –“How much of the Testbed has.
CERN, DataGrid PTB, April 10, 2002 CrossGrid – DataGrid Collaboration (Framework) Marian Bubak and Bob Jones.
G.Govi CERN/IT-DB 1 September 26, 2003 POOL Integration, Testing and Release Procedure Integration  Packages structure  External dependencies  Configuration.
Maite Barroso - 10/05/01 - n° 1 WP4 PM9 Deliverable Presentation: Interim Installation System Configuration Management Prototype
Yannick Patois - Datagrid Software Repository Presentation - March, n° 1 Datagrid Software Repository Presentation CVS, packages and automatic.
EC Review – 01/03/2002 – WP9 – Earth Observation Applications – n° 1 WP9 Earth Observation Applications 1st Annual Review Report to the EU ESA, KNMI, IPSL,
K. Harrison CERN, 22nd September 2004 GANGA: ADA USER INTERFACE - Ganga release status - Job-Options Editor - Python support for AJDL - Job Builder - Python.
Ariel Garcia DataGrid WP6, Heidelberg, 26 th September 2003 Ariel García CrossGrid testbed status Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA3 partner collaboration tasks & process.
The EDG Testbed The European DataGrid Project Team
15-Feb-02Steve Traylen, RAL WP6 Test Bed Report1 RAL/UK WP6 Test Bed Report Steve Traylen, WP6 PPGRID/RAL, UK
INFSO-RI SA2 ETICS2 first Review Valerio Venturi INFN Bruxelles, 3 April 2009 Infrastructure Support.
TP: Grid site installation BEINGRID site installation.
INFSOM-RI ETICS: E-infrastructure for Testing, Integration and Configuration of Software Alberto Di Meglio Project Manager.
JRA1 Meeting – 09/02/ Software Configuration Management and Integration EGEE is proposed as a project funded by the European Union under contract.
Maite Barroso – WP4 Workshop – 10/12/ n° 1 -WP4 Workshop- Developers’ Guide Maite Barroso 10/12/2002
14 June 2001LHCb workshop at Bologna1 LHCb and Datagrid - Status and Planning F Harris(Oxford)
DataGrid and CrossGrid Helpdesk CERN, 30th October 2002 EDG WP6 meeting Sophie Nicoud (CNRS-Marseille) and José Salt (IFIC-Valencia)
CNAF - 24 September 2004 EGEE SA-1 SPACI Activity Italo Epicoco.
Testing and Release Procedures/Tools Cristina Aiftimiei (INFN-CNAF) Mario David (LIP)
Regional Operations Centres Core infrastructure Centres
DataGrid Quality Assurance
Andreas Unterkircher CERN Grid Deployment
WP4-install status update
Testbed Software Test Plan Status
WP1 activity, achievements and plans
CMS report from FNAL demo week Marco Verlato (INFN-Padova)
Porting LCG to IA64 Andreas Unterkircher CERN openlab May 2004
The EU DataGrid Project Tutorial
Grid Application Programming Environment
The EU DataGrid Fabric Management Services
Presentation transcript:

27-29 September 2002CrossGrid Workshop LINZ1 USE CASES (Task 3.5 Test and Integration) Santiago González de la Hoz CrossGrid Workshop at Linz, September Partners:

27-29 September 2002CrossGrid Workshop LINZ2 Introduction For this task we can distinguish two scenarios: –Use Case for the WP3 Integration Team –Use Case for WP3 users (most likely from WP4) Task 3.5 (WP3) Integration Team: -Pawel Wolniewicz (PSNC, Task3.1) -Miquel A. Senar (UAB, Task 3.2) -Bartek Balis (CYFRONET, Task 3.3) -Slawek Zielinski (CYFRONET, Task 3.3) -Lukasz Dutka (CYFRONET, Task 3.4) -Álvaro Fernández (CSIC, Task 3.2) -Javier Sánchez (CSIC, Task 3.5) -Santiago González (CSIC, Task 3.5) More people are welcome!!

27-29 September 2002CrossGrid Workshop LINZ3 1 st Use Case for the WP3 IT Prerequisites:Prerequisites: –Deliverables from each software task is expected in Month Each partner should test well its own software before releasing the code to Integration Team. –All members of the IT should be physically in the same place (Karlsruhe). –Resources needed for the intensive Integration phase: hardware required for a CrossGrid Testbed.

27-29 September 2002CrossGrid Workshop LINZ4 Use Case for the WP3 IT Test and Integration phase:Test and Integration phase: –WP3 IT will obtain the software from the CVS server. –Test the WP3 software. Integration Team is composed by a member from each task and partner Each task must provide its services and tools with detailed information about installation, test and functionality. –Integrate and test the WP3 software in a Real CrossGrid testbed. –Once everything functions, the distribution packages (RPM’s, tar.gz, etc) should be made. Installation from these distribution packages must be verified. –Provide these packages to a central HTTP repository or a central Web site. –The WP3 IT should fully document the installation process and prepare the Installation Guide.

27-29 September 2002CrossGrid Workshop LINZ5 2 sd Use Case for WP3 Users (WP4) Prerequisites:Prerequisites: –Red Hat Linux 6.2 (Test platform supported for first prototype 1). –RPM’s for Testbed 1 created RPMv3 (used by DataGrid). –Local resource management (Batch system). PBS, LSF and “Condor” supported by DataGrid. –Request host and user certificates. Have a CrossGrid Testbed (WP4)

27-29 September 2002CrossGrid Workshop LINZ6 Use Case for WP3 Users (WP4) Obtaining WP3 software:Obtaining WP3 software: –Read Installation Guide done by WP3 Integration Team –Obtain packages from package repositories (HTTP repository or Web central site) in Karlsruhe (DataGrid uses RPM files and marianne). –Install the packages (DataGrid uses RPM tools). –Modify the configuration files and run the programmes using the Installation Guide. –“Start” and/or “Stop” the corresponding Daemons related with the packages (for example, /etc/rc.d/init.d).

27-29 September 2002CrossGrid Workshop LINZ7 Partner Actions in next weeks (Task 3.5 Test and Integration) Santiago González de la Hoz CrossGrid Workshop at Linz, September Partners:

27-29 September 2002CrossGrid Workshop LINZ8 Introduction After M6 (NOW) WP3 will start to develop prototypes of the tool and new grid services. –See Design document produced in M6. The four partners of this task will test all tools and services (precising interfaces and functionality). The goal is to be able to deliver a middleware layer in the CrossGrid testbed. –Important define and understand at Linz what we may expect as 1 st prototype!!!

27-29 September 2002CrossGrid Workshop LINZ9 Todo list by each Partner Before Month 10-11:Before Month 10-11: –After defining (M3) and designing (M6) the architecture of the new grid services and tools, each partner has to make and test well its software according to test procedures proposed by each Task (see D3.2). Compatibility between WP3 software, Globus and EDG software will be guaranteed. Vital evaluation with consequence serious for the success of the integration phase. –Each task must provide its services and tools with detailed information about installation, test and functionality before releasing the code to the WP3 IT. How each task will release its products to WP3 IT?: –Obtain the software from the CVS server –Synchronisation within tasks –What kind of files will be used (RPM, tar.gz, etc…)

27-29 September 2002CrossGrid Workshop LINZ10 Todo list by each Partner Before Month 10-11:Before Month 10-11: –Co-ordination with WP4 and its time scheduling. We need a real CrossGrid Testbed to test and integrate our WP3 products.

27-29 September 2002CrossGrid Workshop LINZ11 Todo list by each Partner After Month 10-11:After Month 10-11: –Integration-test phase. All WP3 IT members should be physically in Karlsruhe together to WP4 integration team people. –At Karlsruhe we have the hardware required for a real CrossGrid testbed and the central CVS server. Test WP3 software before installing to the Testbed. –WP3 IT is composed by a member from each partner and task: “We have an expert for each WP3 service or tool!!!” Integrate and test the whole WP3 software and once everything is working, the packages will be distributed (RPM, tar.gz, etc..)

27-29 September 2002CrossGrid Workshop LINZ12 Todo list by each Partner After Month 10-11:After Month 10-11: Provide these packages to a central HTTP repository or a central WEB site. Documentation about installation process (Installation Guide) will be prepared. –Important define where will be the HTTP Repository or central Web site!!!! (Poznan, Karlsruhe, …)

27-29 September 2002CrossGrid Workshop LINZ13 Partners and IT responsibilities IT has to follow the progress of each task: –The software should be available to IT to the end of Month 10 (We need one month to do the integration!!!). –Each task has to write a document with detailed information about installation, test and functionality (This will help to prepare the WP3 Installation Guide) IT members have to be available in Month to produce and deliver first release version of WP3 software (Installation from this release version in a real CrossGrid testbed must be verified).

27-29 September 2002CrossGrid Workshop LINZ14 Partners and IT responsibilities Collaboration with WP4 IT is required. –Participating in WP4 IT meeting and follow the Testbed evolutions (Next meeting at CERN together EDG IT, 30 th October 2002).

27-29 September 2002CrossGrid Workshop LINZ15 Task 3.5 Agenda Goal: Have a better understand about the Integration-Test phase and define it more precisely: –Use cases discussion (All the points are a proposal and I would be very grateful for your comments and suggestions). –Partner Actions and Responsibilities in next week. –Integration Team Actions and co-ordination

27-29 September 2002CrossGrid Workshop LINZ16 Resources needed for Integration-Test phase CVS server and Central HTTP in Karlsruhe CrossGrid Testbed: –LCFG –CE –WN –SE –UI –Local RB