M2: Team Paradigm :: Pre-Final Presentation 2-D Discrete Cosine Transform Team Paradigm (Group M2): Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan.

Slides:



Advertisements
Similar presentations
M2: Team Paradigm :: Milestone 6 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Advertisements

Encryption Transaction with 3DES Team W2 Yervant Dermenjian (W21) Taewan Kim (W22) Evan Mengstab(W23) Xiaochun Zhu(W24) Objective: To implement a secure.
:: Discrete Cosine Transformation
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Sprinkler Buddy Presentation #5: “Transistor Level Schematics and Another Floor Plan” 2/21/2007 Team M3 Sasidhar Uppuluri Kalyan Kommineni Kartik Murthy.
Viterbi Decoder: Presentation #10 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 10: 5 th April Final Design Corrections.
M2: Team Paradigm :: Milestone 8 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
M2: Team Paradigm :: Final Presentation 2-D Discrete Cosine Transform Team Paradigm (Group M2): Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim.
1 Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Presentation 12 MAD MAC th April, 2006 Short Final Presentation.
1 Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation 13: Final Presentation.
Noise Canceling in 1-D Data: Presentation #12 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 April 11 th, 2005 Final.
Noise Canceling in 1-D Data: Presentation #13 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 April 20 th, 2005 Short.
Viterbi Decoder: Presentation #11 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 11: 12 th April 2004 Short Final Presentation.
Huffman Encoder Project. Howd - Zur Hung Eric Lai Wei Jie Lee Yu - Chiang Lee Design Manager: Jonathan P. Lee Huffman Encoder Project Final Presentation.
Design Team Project: Physical Design ( Layout ) Kyungseok Kim ELEC 7770 Advanced VLSI Design Lecturer: Dr. Vishwani D. Agrawal.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 10: April 5th Chip Level Simulation Overall Project Objective: Design an.
M2: Team Paradigm :: Milestone 8 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Noise Canceling in 1-D Data: Presentation #10 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Mar 28 rd, 2005 Chip Level.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 11: April 12th Short Final Presentation Overall Project Objective: Design.
1 Design of 4- BIT ALU Swetha Challawar Anupama Bhat Leena Kulkarni Satya Kattamuri Advisor: Dr.David Parent 05/11/2005.
1 Team M1 Enigma Machine 3rd May, 2006 Adithya Attawar (M11) Shilpi Chakrabarti (M12) Mike Sokolsky (M14) Design Manager: Prateek Goenka Adithya Attawar.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage IX: March 30 th 2004.
M3: The Pro-Diver 525 Kavita Arora (M3-1) Lisa Gentry (M3-2) Steven Wasik (M3-3) Karolina Werner (M3-4) Design Manager: Steven Beigelmacher Stage 11: Mini-
Noise Canceling in 1-D Data: Presentation #10 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 April 4 th, 2005 Chip.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 9: March 31st Chip Level Simulatio Overall Project Objective: Design an Air-Fuel.
Silicon Design Page 1 The Creation of a New Computer Chip.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage VIII: March 24 th 2004.
Encryption Transaction with 3DES Team W2 Yervant Dermenjian (W21) Taewan Kim (W22) Evan Mengstab(W23) Xiaochun Zhu(W24) Objective: To implement a secure.
S. Reda EN160 SP’08 Design and Implementation of VLSI Systems (EN1600) lecture06 Prof. Sherief Reda Division of Engineering, Brown University Spring 2008.
M2: Team Paradigm :: Milestone 6 Update 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager:
Sprinkler Buddy Presentation #8: “Testing/Finalization of all Modules and Global Placement” 3/26/2007 Team M3 Kartik Murthy Panchalam Ramanujan Sasidhar.
1. 2 Farhan Mohamed Ali Jigar Vora Sonali Kapoor Avni Jhunjhunwala 1 st May, 2006 Final Presentation MAD MAC 525 Design Manager: Zack Menegakis Design.
Sprinkler Buddy Presentation #7: “Redesign of Adder Parts And Layout of Other Major Blocks” 3/07/2007 Team M3 Kalyan Kommineni Kartik Murthy Panchalam.
1 Lucas-Lehmer Primality Tester Presentation 11 April 24th 2006 Team: W-4 Nathan Stohs W4-1 Brian Johnson W4-2 Joe Hurley W4-3 Marques Johnson W4-4 Design.
Group M3 Nick Marwaha Craig LeVan Jacob Thomas Darren Shultz Project Manager: Zachary Menegakis March 23, 2005 MILESTONE 9 Chip level LVS DSP 'Swiss Army.
Camera Auto Focus Presentation 3, February 7 th, 2007 Team W1: Tom Goff (W11) David Hwang (W12) Kate Killfoile (W13) Greg Look (W14) Design Manager: Bowei.
M2: Team Paradigm :: Milestone 3 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Viterbi Decoder: Presentation #7 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 7: 1st Mar Component layout (corrected)
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 4: Feb. 11 th Gate Level Design Overall Project Objective: Design an Air-Fuel.
M2: Team Paradigm :: Milestone 3 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
ESE 570 Final Project Due Wednesday, May 5, 2004, 4:30 pm.
Sprinkler Buddy Presentation #12: “Final Presentation Outline” 4/25/2007 Team M3 Kalyan Kommineni Kartik Murthy Panchalam Ramanujan Sasidhar Uppuluri Devesh.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage II: February 4 th 2004.
1 8 Bit ALU EE 166 Design Project San Jose State University Roger Flores Brian Silva Chris Tran Harizo Yawary Advisor: Dr. Parent May 2006.
M2: Team Paradigm :: Milestone 5 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
M2: Team Paradigm :: Milestone 4 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Sprinkler Buddy Presentation #6: “Optimized Schematics and Component Layout” 2/28/2007 Team M3 Devesh Nema Kalyan Kommineni Kartik Murthy Panchalam Ramanujan.
Final project requirement
Encryption Transaction with 3DES Team W2 Yervant Dermenjian (W21) Taewan Kim (W22) Evan Mengstab(W23) Xiaochun Zhu(W24) Objective: To implement a secure.
Viterbi Decoder: Presentation #4 Omar Ahmad Prateek Goenka Saim Qidwai Lingyan Sun M1 Overall Project Objective: Design of a high speed Viterbi Decoder.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Camera Auto Focus Group W1 Tom Goff Dave Hwang Kate Killfoile Greg Look Design Manager: Bowei Gai Final Presentation, April 30 th, 2007 Project Objective:
M2: Team Paradigm :: Milestone 7 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Sprinkler Buddy Presentation #10: “LVS” 4/11/2007 Team M3 Sasidhar Uppuluri Devesh Nema Kalyan Kommineni Kartik Murthy Panchalam Ramanujan Design Manager:
M2: Team Paradigm :: Milestone 2 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
M2: Team Paradigm :: Milestone 8 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Sprinkler Buddy Presentation #9: “Layout and a New Feature” 4/4/2007 Team M3 Panchalam Ramanujan Sasidhar Uppuluri Devesh Nema Kalyan Kommineni Kartik.
Encryption Transaction with 3DES Team W2 Yervant Dermenjian (W21) Taewan Kim (W22) Evan Mengstab(W23) Xiaochun Zhu(W24) Objective: To implement a secure.
1 Design Goal Design an Analog-to-Digital Conversion chip to meet demands of high quality voice applications such as: Digital Telephony, Digital Hearing.
Random Number Generator Dimtriy Solmonov W1-1 David Levitt W1-2 Jesse Guss W1-3 Sirisha Pillalamarri W1-4 Matt Russo W1-5 Design Manager – Thiago Hersan.
Group M3 Jacob Thomas Nick Marwaha Craig LeVan Darren Shultz Project Manager: Zachary Menegakis April 20, 2005 MILESTONE 13 Short Final Presentation DSP.
Viterbi Decoder: Presentation #3 Omar Ahmad Prateek Goenka Saim Qidwai Lingyan Sun M1 Overall Project Objective: Design of a high speed Viterbi Decoder.
Virtual Wallet Gates Winkler Yin Shen Jordan Fei Project Manager: Prajna Shetty /02/2009 A handheld device that saves time and money through smart.
Integrated Microsystems Lab. EE372 VLSI SYSTEM DESIGNE. Yoon 1-1 Panorama of VLSI Design Fabrication (Chem, physics) Technology (EE) Systems (CS) Matel.
Transistors to Gates © 2011 Project Lead The Way, Inc.Magic of Electrons.
EMT 351/4 DIGITAL IC DESIGN Week # 1 EDA & HDL.
ADPCM Adaptive Differential Pulse Code Modulation
Alpha Blending and Smoothing
Transistors to Gates Transistors to Gates Gateway To Technology
Presentation transcript:

M2: Team Paradigm :: Pre-Final Presentation 2-D Discrete Cosine Transform Team Paradigm (Group M2): Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping Zhan

M2: Team Paradigm Team Paradigm

M2: Team Paradigm 2DDCT LVS result

M2: Team Paradigm 2DDCT Layout

M2: Team Paradigm Poly & Active

M2: Team Paradigm Metal 1

M2: Team Paradigm Metal 2

M2: Team Paradigm Metal 3

M2: Team Paradigm Metal 4

M2: Team Paradigm Total area: 450 x 440 Aspect ratio:1.02 Transistors : Density : 0.18

M2: Team Paradigm Problem with 1DDCT SPICE simulation  Do not reach full power rails, only about 1.1 v.  Tried increased metal width and substrate contact, didn’t solve the problem.  Need to bread down big modules and do SPICE separately to pin down the problem.

M2: Team Paradigm Agenda For Final Presentation  Title slide  Introduction (Tommy)  Marketing Strategy (Tommy)  The game plan (Tommy)  Algorithm (Changshi)  Original estimates (Changshi)  Designing the chip (Changshi)  Verification (Bongkwan)  Problems encountered (Bongkwan)  Final chip design and specs (Bongkwan)  Layout (Brandon)  Conclusion (Brandon)  Emulations (Brandon) Total 37 Slides

M2: Team Paradigm Introduction :Introductory video clip :Description of project -What is a DCT? 3 Slides

M2: Team Paradigm Marketing :Why DCT? :Applications 2 Slides

M2: Team Paradigm Algorithm :Description of algorithm -How it works -Flow diagram Game Plan :Design and chip goals ` 4 Slides

M2: Team Paradigm Original estimates :Chip layout -Floorplan :Transistor count -Pie chart :Size of major components -Table :Total chip area 4 Slides

M2: Team Paradigm Designing the chip :Process from description to implementation -Flowchart :Major changes in components :Changes in floor plan -Animated schematics 5 Slides

M2: Team Paradigm Verification :Behavioral :Logic :Schematic :Layout :Spice 3 Slides

M2: Team Paradigm Problems encountered :Problems during behavioral and logic testing :Problems with Schematic :Problems with layout :Problems with spice 4 Slides

M2: Team Paradigm Final chip design and specs :Total chip area :Size of major components :Total transistor count :Transistor count of major components :Pin specs 2 Slides

M2: Team Paradigm Layout :Layer masks -Poly/active, m1,m2,m3,m4 :Full layout :Full layout w/ overlaid floor plan -Animation overlays floor plan on full layout 6 Slides

M2: Team Paradigm Conclusion :Why is our chip special :Lessons learned 1 Slide

M2: Team Paradigm Emulations :C code :Matlab 2 Slides