Cornell Caltech Atacama Telescope Project Status Simon Radford 2005 October 10.

Slides:



Advertisements
Similar presentations
1 Location of Partners and customers Who are our customers? MSSL Centre for Process engineering European Space Agency JOANNEUM RESEARCH Swedish Research.
Advertisements

CCAT Project Status. The Project: Phase 1: Feasibility/Concept Design Study, $2M, completed and peer reviewed Phase 1: Feasibility/Concept Design Study,
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review M3 Wave Energy Systems (TRL System) PI: Mike Morrow M3 Wave Energy Systems.
Stewarding NYPL’s Audio and Moving Image Collections into the Future Ann Thornton and Evelyn Frangakis CNI Fall Meeting December 9, 2014.
VISTA as seen by the Prime Contractor Adrian Russell.
NGAO System Design Review Response Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team SSC Meeting June 18, 2008.
ATACAMA. At September Faculty Meeting we proposed: A project of scientific excitement and uniqueness, in the IR niche; with focus that emphasizes Cornell’s.
ATACAMA CCAT : The Cornell-Caltech Atacama Telescope A joint project of Cornell University, the California Institute of Technology the California Institute.
Telescope Design The W.M. Keck (I & II) Telescopes Jana Hunt & Kent Van ME250 Precision Machine Design April 8, 2003.
California Association for Research in Astronomy W. M. Keck Observatory KPAO Keck Precision Adaptive Optics Keck Precision AO (KPAO) SSC Presentation January.
Senior Review Evaluations (1 of 5) Proposals due: 6 March 2015 Panel evaluations: Week of 22 April 2015 Performance factors to be evaluated will include.
Introduction to ARA’s Proposal Resources Don Cole
Major Management & Systems Engineering Ideas for Reducing Costs Peter Wizinowich NGAO Team Meeting September 11-12, 2008.
NGAO Instrumentation Preliminary Design Phase Planning September 2008 Sean Adkins.
1 The Thirty-Meter Telescope (TMT) Richard Ellis, Steele Professor and California Institute of Technology TMT Board member Michael Bolte, Director, University.
GMT Instrument Development Gary Da Costa ANU Representative GMT Science Advisory Committee.
Enabling a GSMT for the US Community: AURA’s Proposal to the NSF Stephen E. Strom 04 June, 2004 Tucson, AZ National Optical Astronomy Observatory Tucson.
Principal Investigators: W. Wild (Instrumentation R&D) M. Hogerheijde (Allegro) M. Hogerheijde (Allegro) NOVA-3 Proposal Advancing Submillimeter Astronomy.
1 R. D. Gehrz 66th International Symposium on Molecular Spectroscopy, Columbus, OH, June 23, 2011 The Stratospheric Observatory for Infrared Astronomy.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
August 2 and 3, 2010 Project Cost, Schedule, Risk and Contingency Jay Elias.
European Extremely Large Telescope - Status April ESO.
SDC Migration Project Status Report January 2012.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Meeting Summary Richard.
WFMOS Status Report Doug Simons Gemini Observatory January 2008.
TMT.PMO.PRE REL011 Thirty Meter Telescope Background and Status.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
“From the Ground Up: Balancing the NSF Astronomy Program” Senior Review Major Recommendations November 2006 Implications for GSMT.
Fresno County Employees’ Retirement Association Strategic Planning Presented by Tom Iannucci Cortex Applied Research February 20, 2008.
1 R. D. Gehrz 67th International Symposium on Molecular Spectroscopy, Columbus, OH, June 21, 2012 The Stratospheric Observatory for Infrared Astronomy.
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
Response to ASAC Report of May 2004 Response to ASAC The Atacama Large Millimeter Array Tom Wilson and Al Wootten Science IPT.
FELT 1 Study of the capability and configuration of a fixed mirror Extremely Large Telescope (FELT) Low cost path to large telescope Primary concern is.
Réunion de présentation des besoins 10 Nov Joël MICHAUD French expertise in SiC for large telescopes.
AURA New Initiatives Office. GSMT SWG Meeting L. Stepp, July 30, 2002 NSF Science Working Group Support Available from AURA NIO Available Personnel Current.
COSMO Large Coronagraph Preliminary Design Review
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY The Spallation Neutron Source Project: Update T. E. Mason Oak Ridge National Laboratory.
1 1 Presenter / date if required Independent, integrated thinking.
Theme 2 AO for Extremely Large Telescopes Center for Adaptive Optics.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Office of Major Project Development (OMPD) Overview November 2015.
ALMA and FP6 Opportunities and strategy Funded project – construction phase FP6 timeframe 2003 – Good timing - first science planned for.
G R 2004 Plan Update LIGO Systems meeting 22 Jan 04 dhs.
LSST CORPORATION Patricia Eliason LSSTC Executive Officer Belgrade, Serbia 2016.
13,14 July 2005 Feasibilty/Concept Study Mid Term Status Review Telescope Mount Concept Vertex RSI.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
Cornell Caltech Atacama Telescope (CCAT) Status & Technical Exchange Meeting 16 March 2005.
13,14 July 2005 Feasibilty/Concept Study Mid Term Status Review CCAT Enclosure Nathan Loewen AMEC Dynamic Structures Ltd. 13 July 2005.
Camera PDR/CD1 Planning 19 September 2008
David Woody Caltech Owens Valley Radio Observatory
Electronics and Controls
Primary Mirror (Reflector)
ATACAMA CCAT : The Cornell-Caltech Atacama Telescope
Feasibilty/Concept Study Mid Term Status Review
Project Management module
Corrugated Mirror and Rapid Panel Manufacturing
Facility Concept Design and Study
Composite Mirror Applications, Inc
Operations Concept Simon Radford and Operations Committee
Integration & Commissioning
Feasibilty/Concept Study Mid Term Status Review
Theme 2 AO for Extremely Large Telescopes
Management Breakout: MREFC Budget Summary Victor L
Atacama Large Millimeter Array
Welcome to the 4th NAIC-NRAO School on Single Dish Radio Astronomy
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
Natural Gas Innovation Fund Investment Intake Template Project Title Submitted By *Note: This template is intended as a guide on content; you may.
Theme 2 AO for Extremely Large Telescopes
Instrument Overview Larry Springer HMI Program Manager
Theme 2 AO for Extremely Large Telescopes
Presentation transcript:

Cornell Caltech Atacama Telescope Project Status Simon Radford 2005 October 10

Surveys with a 25 m Submm Telescope2 Study Status Now concluding Concept and Feasibility Study –MOU between Cornell and Caltech –JPL participation as part of Caltech Study budget:$2 million Study completion –Report publicationmid December 2005 –Review presentationmid January 2006 Peer review panel Formal report for administrations and partners –Detailed and accurate cost estimate Major objectives of this phase –Identify a telescope concept –Investigate feasibility and assess probable cost –Identify critical risks –Propose plan for entire project

2005 October 10Surveys with a 25 m Submm Telescope3 Project Principals Riccardo GiovanelliProject Director, Cornell Terry HerterProject Scientist, Cornell Jonas Zmuidinas Project Scientist, Caltech Tom SebringProject Manager, Cornell Simon RadfordDeputy Proj. Mgr., Caltech Paul GoldsmithJPL lead Not meant to devalue other participants!

2005 October 10Surveys with a 25 m Submm Telescope4 Study Tasks Committees –Overall leadership by Project Scientists –Science: Overall Science Objectives and Requirements –Instrumentation: Defines Instrument Suite –Operations: Operations Plans and Cost Est. Internal Studies –Technical Tasks Undertaken by JPL, Caltech, Cornell –Provide Specific Design, Analysis, and Reports to Study Contracts –Seven Industrial Study Contracts in Place Facility, Dome, Mount, Mirror Panels (3), M2/M3 mechanisms Detailed Reports, Presentations, and Cost Estimates We Are On Course to Complete the Feasibility Concept Study as Planned

2005 October 10Surveys with a 25 m Submm Telescope5 Chajnantor Plateau (5000 m) Dietrich/Caltech CBIAPEX CCAT 5590 m ALMA

2005 October 10Surveys with a 25 m Submm Telescope6 Site selection status Chajnantor plateau (5050 m) better than Mauna Kea –CBI, APEX, ALMA; twice as much time for 350 µm Sairecabur (5500 m) better than Chajnantor plateau –30% more 350 µm; 1 km from Bolivia, outside science preserve Expect Cerro Chajnantor (5590 m) similar to Sairecabur –Radiosonde measurements of water vapor profiles –Permission to deploy characterization equipment pending –Japanese planning to deploy equipment for IR telescope Baseline plan: Cerro Chajnantor (5590 m) Fallback:Chajnantor plateau, near APEX Option: Sairecabur (5500 m) Quantify relative costs, benefits Continue quantitative measurements of other sites

2005 October 10Surveys with a 25 m Submm Telescope7 M3 Engineering & Technology, Tucson –Have designed facilities for most recent US observatories –Familiar with Atacama region through work on the ALMA project Mountain top facility –Minimum size for functions –Use Chilean construction methods & materials –Includes oxygen enrichment Base facility –Near San Pedro de Atacama –Similar to APEX base Facilities

2005 October 10Surveys with a 25 m Submm Telescope8 Dome AMEC Dynamic Structures, Vancouver –Designer of largest astronomical domes –Experience with large moving structures Calotte Design –Unique motions –Structurally efficient – lowest cost –Highest reliability –Very Large… 50 m diameter! Study results –Structure, shutter, mechanisms –Concepts developed and designed Cost estimate –~$13 million, consistent with allocation Next Phase –Anticipate cost reduction by integration of commercial systems and structures Polyurethane Radial Roller Steel Normal and Uplift Rollers Bogie Frame Normal Pivot Bearing Central Mount

2005 October 10Surveys with a 25 m Submm Telescope9 Telescope Mount Vertex RSI (General Dynamics) –Built many radars, radiotelescopes, and optical telescopes –Particular expertise in servo control for pointing and tracking CCAT mount challenges –Precision pointing and tracking required –High acceleration for scanning motions –Large 25 m primary mirror Study results –CAD model, mass estimate –Includes primary mirror truss –Control analysis Mount will probably meet scanning and pointing requirements Cost estimate due this week

2005 October 10Surveys with a 25 m Submm Telescope10 Primary Mirror Mirror divided into annular groups of segments Only six different segment types Suggests replication from masters Supported by bolted steel truss

2005 October 10Surveys with a 25 m Submm Telescope11 Three Approaches to Segment Fabrication CFRP-Al Sandwich –CMA, Tucson, AZ –Used successfully in SMT –Very lightweight and stiff SiC with nanolaminates –Xinetics, Devens, MA –Doesn’t meet cost, weight, or schedule Formed borosilicate glass –ITT, Rochester, NY –Lightweight core –Emerging technology Glass and CFRP merit further development 0.56 m diameter glass panel 5.3 kg m –2

2005 October 10Surveys with a 25 m Submm Telescope12 Other Study Areas Initial Instrumentation Suite –Large format bolometer array imager –Medium resolution spectrometer Sensors for telescope –Calibration sensor for initial segment and M1/M2 alignment (JPL) –Operations sensors to maintain segment alignment Hybrid approach: opto-electronic and laser metrology (JPL/Cornell) –Optical guider for precision pointing and tracking (Cornell) Operations planning –Logistics, shipping, staffing –High altitude risk mitigation Systems engineering –Error budgets, analysis, simulations (Caltech & Cornell)

2005 October 10Surveys with a 25 m Submm Telescope13 Project Schedule More detailed schedule being developed as part of current study Schedule is controlled by partnership and funding development Critical path analysis and optimization are part of the next phase, Engineering Concept Design

2005 October 10Surveys with a 25 m Submm Telescope14 Program Funding Target: $100 M Two science instruments Contingency: 10% Rates notional –probably correct

2005 October 10Surveys with a 25 m Submm Telescope15 Summary The current Feasiblity and Concept Study is well along in meeting the objectives of the Cornell Caltech MOU Investigation to date shows that CCAT is technically feasible and can be built for a cost of $100 million Efforts underway to secure funding for the next, Engineering Concept Design phase ($3 million) Development of full partnership and strategy to get to full funding should have the highest priority Identification of forefront science indicates CCAT will be an extremely significant asset in astronomical research