ARIES-AT Study L. M. Waganer 3 May 2000 Status of Vacuum Vessel Design L. Waganer 3 May 2000 ARIES Conference Call
ARIES-AT Study L. M. Waganer 3 May D View of Basic Vacuum Vessel
ARIES-AT Study L. M. Waganer 3 May 2000 Elevation View, Basic Structure
ARIES-AT Study L. M. Waganer 3 May 2000 Structure Details
ARIES-AT Study L. M. Waganer 3 May 2000 Basic Structure with Fill Hatches
ARIES-AT Study L. M. Waganer 3 May 2000 Exterior Elevation View of Doors
ARIES-AT Study L. M. Waganer 3 May 2000 Door Details Wall and bulkhead thicknesses are 3 cm C/S at top and bottom C/S at middle 253 cm (99.6") 192 cm (75.6")
ARIES-AT Study L. M. Waganer 3 May 2000 High Temperature Wedge Approach Current Definition Blanket I Vacuum Vessel HT Shield Blanket II Possible Options
ARIES-AT Study L. M. Waganer 3 May 2000 Next Actions Xueren Wang should verify design approach and revise dimensions as required Les Waganer will define the door frame based on recommended on high temperature wedge approach L. Waganer will define fabrication sequence and estimate fabricated cost