ARIES-AT Study L. M. Waganer 3 May 2000 Status of Vacuum Vessel Design L. Waganer 3 May 2000 ARIES Conference Call.

Slides:



Advertisements
Similar presentations
Preliminary Stress Analysis of Vacuum Vessel By : Hamed Hosseini Advisor: Prof. Najmabadi.
Advertisements

Punch! Pro Platinum Home Design Adding Closets. Bedroom Closet Click on the Floor Tab, and then click on the Interior Wall icon. Count up three feet from.
April 23-24, 2009/ARR 1 Proposed Effort Over the Next 1-2 Years on ARIES-DB DCLL A. René Raffray, Siegfried Malang, Xueren Wang University of California,
Bathroom plan layout Variation of layouts.
Coolant Connections to the DCLL Blanket S. Malang, Dara Navaei, Xueren Wang ARIES Project MeetingARIES Project MeetingUCSD January 23-24, 2012January 23-24,
Progress on the Configuration Design of the Fusion Power Core for the ACT (Draft) X.R. Wang M.S. Tillack S. Malang Sept. 29, 2011.
1 LOCA/LOFA Analyses for LiPb/FS System Carl Martin, Jake Blanchard Fusion Technology Institute University of Wisconsin - Madison ARIES-CS Project Meeting.
ARIES Meeting, UCSD L. M. Waganer, June 2006 Maintenance and Building Conceptual Approach L. M. Waganer The Boeing Company ARIES Meeting University.
ARIES-CS Page 1 Summary of ARIES Power Core Unit Costs L. Waganer The Boeing Company 16 September 2004 ARIES Meeting at Madison, WI.
MHD Coating Requirements Dai-Kai Sze, Xueren Wang UCSD UCSD US/Japan Workshop on Power Plant Studies Presented at UCSD October 9-11, 2003.
Update of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
Status of the Power Core Configuration Based on Modular Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
Development of the New ARIES Tokamak Systems Code Zoran Dragojlovic, Rene Raffray, Farrokh Najmabadi, Charles Kessel, Lester Waganer US-Japan Workshop.
November 4-5, 2004/ARR 1 ARIES-CS Power Core Options for Phase II and Focus of Engineering Effort A. René Raffray University of California, San Diego ARIES.
ARIES-Compact Stellarator Study 1 CS Power Core Materials and Fabrication Unit Cost Estimation ARIES-CS Project Meeting June 2004 University of Wisconsin,
Maintenance Schemes For ARIES-CS X.R. Wang a S. Malang b A.R. Raffray a and the ARIES Team a University of California, San Diego, 9500 Gilman Drive, La.
ARIES Studies L.M. Waganer 18 Sept 00/Page 1 Power Core Maintenance Approach and Maintainability Analysis By L. M. Waganer The Boeing Company For the ARIES.
December 3-4, 2003/ARR 1 Maintenance Studies for 3-Field Period and 2-Field Period Configurations Presented by A. R. Raffray Major Contributors: X. Wang.
Status of 3-D Analysis, Neutron Streaming through Penetrations, and LOCA/LOFA Analysis L. El-Guebaly, M. Sawan, P. Wilson, D. Henderson, A. Ibrahim, G.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
Page 1 ARIES Project Meeting, L. M. Waganer, 3-4 March 2008 Restructuring System Cost Accounts and Algorithms L. Waganer 3-4 March 2008 ARIES Project Meeting.
Highlights of ARIES-IFE Study Farrokh Najmabadi VLT Conference Call April 18, 2001 Electronic copy: ARIES Web Site:
June19-21, 2000Finalizing the ARIES-AT Blanket and Divertor Designs, ARIES Project Meeting/ARR ARIES-AT Blanket and Divertor Design (The Final Stretch)
Status of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray ARIES Meeting PPPL, NJ Sept.
Update of the ARIES-CS Power Core Configuration and Maintenance X.R. Wang S. Malang A.R. Raffray and the ARIES Team ARIES Meeting Madison, Wisconsin September.
March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Status ARIES-AT Blanket and Divertor Design The ARIES Team Presented.
Minimum Radial Standoff: Problem definition and Needed Info L. El-Guebaly Fusion Technology Institute University of Wisconsin - Madison With Input from:
ARIES-IFE Study L. M. Waganer, June 7, 2000 Page 1 Considerations of HI Beam and Vacuum System Arrangement L. Waganer The Boeing Company 7 June 2001 ARIES.
ARCHITECTUAL DRAWING TYPES BY: WESLEY & AUSTIN. BATH ARRANGEMENTS ½ bath- sink and toilet 3/4 bath- one shower, sink and toilet. Full bath- one tub, shower,
Design of Vessels Under External Pressure
ARIES -AT Study L.M. Waganer ARIES 3/20-21/00 Page1 ARIES-AT Vacuum Vessel Design Approach L. M. Waganer The Boeing Company 20 March 2000 UCSD San Diego,
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
1.What is it? 2.How do you draw a planometric ? 3.Exercises.
ARIES Project Meeting, L. M. Waganer, Dec 2007 Page 1 Restructuring System Cost Accounts and Algorithms L. Waganer December 2007 ARIES Project.
Engineering Overview of ARIES-ACT1 M. S. Tillack, X. R. Wang and the ARIES Team Japan/US Workshop on Power Plant Studies and Advanced Technologies
Wall Frames 2 M. S. Martin Feb Click mouse to bring in each point or item until complete.
U PDATED ARIES-ACT P OWER C ORE D EFINITION AND S I C B LANKET X.R. Wang, M. S. Tillack, S. Malang F. Najmabadi and L.A. El-Guebaly ARIES-Pathways Project.
Vacuum Vessel Recent Progress. Horizontal or Vertical Rib? Over-Stressed Spots We get over-stressed spots on the horizontal ribs (Very high stress spots)
ARIES- ACT, 21-22May 2013, Germantown, MD Page 1 L. Waganer Consultant for ARIES Project / UCSD / DOE ARIES Project Meeting May 2013 Hampton Inn,
1 Lane Carlson ARIES-Pathways Project Meeting Gaithersburg, MD, July 27-28, 2011 Generalization and Blanket Updates to the ASC.
Fundamentals of Structural Detailing
1 Neutronics Assessment of Self-Cooled Li Blanket Concept Mohamed Sawan Fusion Technology Institute University of Wisconsin, Madison, WI With contributions.
Stabilizing Shells in ARIES C. E. Kessel Princeton Plasma Physics Laboratory ARIES Project Meeting, 5/28-29/2008.
Update of Vacuum Vessel Analysis Hamed Hosseini, Farrokh Najmabadi, Xueren Wang ARIES Meeting Washington, DC, May 30-June 1, 2012.
ARIES- ACT, Sept, 2012, Bethesda, MD Page 1 L. Waganer Consultant for ARIES Project / UCSD / DOE ARIES Project Meeting September 2012 Bethesda,
R EFINEMENT OF THE P OWER C ORE C ONFIGURATION OF THE ARIES-ACT SA X.R. Wang 1, M. S. Tillack 1, S. Malang 2 and F. Najmabadi 1 1 University of California,
ARIES-CS Power Core Configuration Presented by X.R. Wang Contributors: Laila A. Ei-Guebaly, S. Malang, T.K. Mau, Richard Peiperty, A.R. Raffray and L.
ARIES Meeting, UCSD L. M. Waganer, June 2006 Maintainability and Availability Analyses L. M. Waganer The Boeing Company ARIES Meeting University.
Progress of ARIES Systems Code Development Zoran Dragojlovic A. René Raffray Farrokh Najmabadi ARIES-“TNS” Project Meeting June 14 and 15, 2007 General.
Orthographic Drawings
IDS120j WITHOUT RESISTIVE MAGNETS MODIFYING Hg MODULE Nicholas Souchlas, PBL (11/1/2012) 1.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
Floor Plans Floor plans are the central or core drawings of any set of CD’s. They not only contain a tremendous amount of information for consultants and.
Comments on ARIES-ACT 1/2011 Strawman L. El-Guebaly Fusion Technology Institute University of Wisconsin-Madison
Isometric & Orthographic Drawings
Updates of the ARIES-CS Power Core Configuration and Maintenance
X.R. Wang, M. S. Tillack, S. Malang, F. Najmabadi and the ARIES Team
Magnetic signature of submarine
Find the linearization L(x, y) of the function at the given point
Magnetic gap calculation
DESIGN STATUS PREX II Alan Gavalya 15DEC14.
Structural Drawings and Specifications
ACT1 LOFA model updates and LOCA analyses
Scaled Drawings 7.07 Execute Scaled Drawings
Wall and Ceiling Construction
Difference between 3 COF and 6 COF Open cells in 22” Segment
Analysis of Technical and Programmatic Tradeoffs with Systems Code
SC1R Cold Box PDR Assembly Sequence
Structural Designs and Specifications
Presentation transcript:

ARIES-AT Study L. M. Waganer 3 May 2000 Status of Vacuum Vessel Design L. Waganer 3 May 2000 ARIES Conference Call

ARIES-AT Study L. M. Waganer 3 May D View of Basic Vacuum Vessel

ARIES-AT Study L. M. Waganer 3 May 2000 Elevation View, Basic Structure

ARIES-AT Study L. M. Waganer 3 May 2000 Structure Details

ARIES-AT Study L. M. Waganer 3 May 2000 Basic Structure with Fill Hatches

ARIES-AT Study L. M. Waganer 3 May 2000 Exterior Elevation View of Doors

ARIES-AT Study L. M. Waganer 3 May 2000 Door Details Wall and bulkhead thicknesses are 3 cm C/S at top and bottom C/S at middle 253 cm (99.6") 192 cm (75.6")

ARIES-AT Study L. M. Waganer 3 May 2000 High Temperature Wedge Approach Current Definition Blanket I Vacuum Vessel HT Shield Blanket II Possible Options

ARIES-AT Study L. M. Waganer 3 May 2000 Next Actions Xueren Wang should verify design approach and revise dimensions as required Les Waganer will define the door frame based on recommended on high temperature wedge approach L. Waganer will define fabrication sequence and estimate fabricated cost