Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory 1 LCLS Commissioning Status P. Emma for The.

Slides:



Advertisements
Similar presentations
Nominal and no CSR (R 56-1 = 55 mm, R 56-2 = 59 mm, R 56-3 = 0) L1 phase = 21 deg, V 3.9 = 55 MV CSR OFF BC3 OFF Elegant Tracking  z1 = mm (post.
Advertisements

1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
Joe Frisch LCLS FAC Oct. 30, Linac/BC2 Commissioning (Dec through Sep., 2008) J. Frisch, et al. LCLS FAC Meeting.
P. Emma LCLS FAC 12 Oct Comments from LCLS FAC Meeting (April 2004): J. Roßbach:“How do you detect weak FEL power when the.
P. Emma FAC Meeting 7 Apr Low-Charge LCLS Operating Point Including FEL Simulations P. Emma 1, W. Fawley 2, Z. Huang 1, C.
Hal Tompkins FEE/FEL June 16, FEE/FEL Commissioning Overview By Hal Tompkins Photon Beam Systems Deputy.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
P. Emma, SLACLCLS Commissioning – Sep. 22, 2004 Linac Commissioning P. Emma LCLS Commissioning Workshop, SLAC Sep , 2004 LCLS.
John N. Galayda LCLS Facility Advisory November 11, LCLS Update November 11, 2008 Construction Status LCLS Instruments.
Paul Emma, et al. LCLS FAC May 13, LCLS Commissioning: Results & Plans P. Emma, for the LCLS Commissioning Team LCLS FAC.
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Linac Physics, Diagnostics, and Commissioning Strategy P. Emma LCLS FAC Meeting April 29, 2004 LCLS.
Accelerator Issues and Design Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator.
James Welch October 29, 2007 Injector Commissioning Injector Commissioning Results presentated to the Facilities Advisory Committee,
LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Comments from LCLS FAC Meeting (April 2004): J. Rößbach:“How do you detect weak FEL power when the gain is very low (few hundred)?” K. Robinson:“Can you.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project Near term opportunities for LCLS 'upgrades' J. Hastings for the LCLS Experimental.
RF Systems and Stability Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
Diane Fairley High Level October High Level Applications FAC Review October 12, 2006 High Level Applications.
Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status.
David H. Dowell Injector Physics/Diagnostics/Gun&L0 RF April 29-30, 2004 Injector Physics / Diagnostics / Gun & L0 Linac.
LCLS-II Transverse Tolerances Tor Raubenheimer May 29, 2013.
LCLS Status and Micro-Bunching Workshop at LBNL Torsten Limberg.
Injector Accelerator Readiness Review, 10/31/06 Henrik Loos 1 Beam Losses During LCLS Injector Phase-1 Operation Scope of phase 1 operation Operating modes.
Low Emittance RF Gun Developments for PAL-XFEL
TTF2 Start-to-End Simulations Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING DESY Zeuthen, 22 Jan 2004.
S2E in LCLS Linac M. Borland, Lyncean Technologies, P. Emma, C. Limborg, SLAC.
David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.
LCLS Accelerator SLAC linac tunnel research yard Linac-0 L =6 m Linac-1 L  9 m  rf   25° Linac-2 L  330 m  rf   41° Linac-3 L  550 m  rf  0°
Optimizing X-ray FEL performance for LCLS at SLAC Sean Kalsi on behalf of SLAC MCC operations group, WAO August 8, 2012.
A bunch compressor design and several X-band FELs Yipeng Sun, ARD/SLAC , LCLS-II meeting.
John N. Galayda LCLS Accelerator Readiness December 2, LCLS Overview December 2, 2008 Project Construction Status.
John N. Galayda DESY October 8, LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning.
J. Wu J. Wu working with T.O. Raubenheimer, J. Qiang (LBL), LCLS-II Accelerator Physics meeting April 11, 2012 Study on the BC1 Energy Set Point LCLS-II.
P. Krejcik LINAC 2004 – Lübeck, August 16-20, 2004 LCLS - Accelerator System Overview Patrick Krejcik on behalf of the LCLS.
‘S2E’ Study of Linac for TESLA XFEL P. Emma SLAC  Tracking  Comparison to LCLS  Re-optimization  Tolerances  Jitter  CSR Effects.
LCLS-II Particle Tracking: Gun to Undulator P. Emma Jan. 12, 2011.
PAC-2001, Chicago, IL Paul Emma SLAC SLAC Issues and R&D Critical to the LCLS UCLA LLNL.
Franz-Josef Decker 14-Dec-2011 CSR is a big deal limiting performance Tolerance studies beforehand helped a lot Tor’s List Software adaptability helped.
X-band Based FEL proposal
LCLS-II will use sectors (2 nd kilometer of SLAC linac) + a bypass line FACET has already removed all RF from sector 20 LCLS-II will re-install RF.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
A single-shot method for measuring fs bunches in linac-based FELs Z. Huang, K. Bane, Y. Ding, P. Emma.
Applications of transverse deflecting cavities in x-ray free-electron lasers Yuantao Ding SLAC National Accelerator Laboratory7/18/2012.
Sara Thorin, MAX IV Laboratory
Cutting Beam Horns in BC1
Short pulse, low charge LCLS operation
Thermal emittance measurement Gun Spectrometer
Revised Commissioning Strategy
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
Commissioning Status of the LCLS Accelerator and Undulator Systems
LCLS Injector Commissioning Dates ( )
LCLS Commissioning Parameters
Advanced Research Electron Accelerator Laboratory
Z. Huang LCLS Lehman Review May 14, 2009
Risk Assessment Contingency Endgame
Linac/BC1 Commissioning P
Linac (WBS 1.2.2) Vinod Bharadwaj April 23, 2002
LCLS Commissioning P. Emma, et al
Modified Beam Parameter Range
LCLS Commissioning: Results & Plans P
Linac Physics, Diagnostics, and Commissioning Strategy P
Linac Diagnostics Commissioning Experience
Operational Experience with LCLS RF systems
LCLS Injector Commissioning P
P. Emma, for the LCLS Commissioning Team LCLS DOE Review May 14, 2009
Linac Design Update P. Emma LCLS DOE Review May 11, 2005 LCLS.
Presentation transcript:

Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory 1 LCLS Commissioning Status P. Emma for The LCLS Commissioning Team LCLS FAC Meeting November 11, 2008 LCLS Machine Performance Estimated FEL Power Ultra-Short Pulse Possibilities Plans for 2009 Results published in FEL’08 and Linac’08 proceedings

Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory 2 Phase-II Commissioning Highlights (2008) Injector Commissioning: Apr-Aug, 2007 (DONE) Phase-II Commissioning: Dec-Aug, 2008 (DONE) Great drive-laser uptime (99%) and good performance Projected emittances  m at 0.25 nC, 10 GeV Routine 30-Hz e  to 14 GeV (~24/7 with ~90% up-time) Bunch compression fully demonstrated down to 1-2 µ m New cathode installed with greatly improved thermal emittance 20-pC bunch with µ m emittance (and 2-fs length?) Electron bunch appears bright enough to drive 1.5-Å FEL Phase-III commissioning started Nov. 3, 2008 – X-rays by July ‘09

Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory 3 Design and Typical Measured Parameters (Aug. 2008) Parametersymboldesignmeasuredunit Final linac e  energy  mc MeV Bunch charge Q10.25nC Initial bunch length (rms)  z mm Final bunch length (rms)  zf mmmm Projected emittance (injector)  x,y μmμmμmμm Slice emittance (injector)  s x,y μmμmμmμm Projected emittance (linac end)  L x,y , 1.6* μmμmμmμm Single bunch repetition rate f12030Hz RF gun field at cathode EgEgEgEg120115MV/m Laser energy on cathode ulululul μJμJμJμJ Laser diameter on cathode 2R2R2R2R1.51.2mm Cathode quantum efficiency QE  5 * horizontal slice emittance likely < 1 µ m

Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory 4 Bunch Compression & CSR Measured after BC2 (0.25 nC)  z > 25  m BC2 (4.3 GeV) BSY (14 GeV) TCAV (5.0 GeV) 550 m  z < 5  m old screen used L2 4 wires  z  2  m nominal

Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory 5 long weekend run at 0.25 nC with no tuning Emittance Near End of Linac Over Long Weekend (3.3 days) May 24, :01 to May 27 09:00  (  x  y ) 1/2 = 1.04  m

Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory 6 Beam Appears Bright Enough for FEL Saturation at 0.15 nm Calculation based on measured end-of-linac projected emittance values, measured peak current, and design undulator parameters (assuming undulator alignment and  0.01% rms slice energy spread – not yet measurable) M. Xie method, with wakes FEL Power 3D Gain Length FEL Power 3D Gain Length

Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory 7 New Cathode: Time-sliced x-Emittance at Very Low Charge 20 pC, 135 MeV, 0.6-mm spot diameter, 400 µm rms bunch length (5 A) TAIL (not same data) 0.14 µm

Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory 8  z  1  m ? 8 kA? LiTrack (no CSR) Measurements and Simulations for 20-pC Bunch at 14 GeV Photo-diode signal on OTR after BC2 shows minimum compression at  34.5 degL2-linac phase. Photo-diode signal on OTR after BC2 shows minimum compression at  34.5 deg L2-linac phase. Horizontal projected emittance measured at 10 GeV, after BC2, using 4 wire-scanners. Y. Ding LCLS FEL simulation at 1.5 Å based on measured injector beam and Elegant trackingwith CSR at 20 pC. LCLS FEL simulation at 1.5 Å based on measured injector beam and Elegant tracking with CSR at 20 pC. 1.5 Å, 3.6  photons I pk = 4.8 kA   0.4 µm SIMULATED FEL PULSE

Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory Hz RF & Controls Testing Done (Gun, L0a, L0b, L1-S, & L1-X) Measured 120-Hz “Timeslot” phase jitter for all injector RF stations: Gun, L0a, L0b ~0.8 deg rms (tol. = 0.1 deg) L1S ~0.17 deg rms (tol. = 0.1 deg) L1X ~0.3 deg rms (tol. = 0.5 deg) Observe ~1 deg difference on every 4th pulse (L0a, L0b, L1X) Measurements confirmed with old SLC control system and new Beam Synchronous Acquisition system More feedback development is needed (beam-based and RF-based) Radiation measured are below posted limits at each klystron Gun temperature and vacuum response OK at 120 Hz M. Stanek

Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory 10 The LCLS Laser Heater is Ready (except undulator) IR & e- beams on OTR screens now Controls ready Beam through chicane already…

Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory 11 RF Deflector (LOLA) + special lattice configuration in spectrometer allows fine measurement of time-sliced energy spread (to <6 keV)  E  6 keV rms (40  m) OTR screens (7) YAG screens (7) Wire scanners (7) Dipole magnets (8) Beam stoppers (2) S-band RF acc. sections (5) RF Gun Solenoid GunSpectrometer RFDeflector X-band RF acc. section BC1 L1S L0a L0b 2-km point in 3-km SLAC linac 135-MeVSpectrometer EmittanceScreens/Wires EmittanceScreen/Wires 135 MeV 250 MeV TD11stopperLaser-Heater

Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory 12 q = 0.25 nC  x = 0.61 µm  y = 0.67 µm New emittance data at 135 MeV taken on Nov. 8, 2008 just 2 days into the turn-on

Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory 13 Important Dates for 2008/2009 Commissioning Nov. 3, 2008:Startup (establish beam to end of linac again) Dec. 3, 2008:Install laser-heater undulator (?) Dec. 15, 2008:First beam through LTU & to dump? Dec. 19, 2008:SLAC shuts down for holidays Jan. 5, 2009:Startup again (establish beam in LTU & dump) March 2, 2009:Install ~25 undulators & PPS cert. (~2 wks) May 14, 2009:First beam in FEE July 2009:Photons in NEH August 2009:Start AMO Experiment

Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory 14 Re-establish e  to SL2 LTU/UndComm. First Light in FEE First Light in FEH NEH Ops & Commissioning JJFFMMAAMMJJJJAASSDDJJFFMMAAMMJJJJAASSOONNDDJJFFMMAAMMJJJJ ON A A Down PPS Linac/BC2 Commissioning FEL/FEECommissioning Nov. 3, 2008 Install Undulators M M D D LCLS Installation and Commissioning Time-Line LTU/Und Install PEP-II run ends FEE/NEH Install PPS Cert. LTU/Dump CD-4 (7/31/2010) X-Rays in NEH now D D Down? FEH Hutch BO

Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory 15 LTU/Undulator/FEE/FEL Commissioning H. Tompkins + heater