Jordan Goodman HAWC Review - December 2007 HAWC A Wide-Field Gamma-Ray Telescope Jordan A. Goodman University of Maryland.

Slides:



Advertisements
Similar presentations
WIYN Planning Meeting, February 28, 2013 Wisconsin, Indiana Yale, NOAO 0.9m Half Degree Imager – First Light.
Advertisements

HiRes Collaboration Organization. HiRes Institutions and PI’s University of Utah (NSF) - P. Sokolsky & C. Jui Columbia University (NSF) - S. Westerhoff.
Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
ALICE © | RRB | 17 April 2013 | Catherine Decosse 24 th meeting of the ALICE Resources Review Board CERN-RRB
Proposal Submitted to NSF/DoE HEP Given the large increase in sensitivity for a moderate cost, we have decided to propose to build HAWC. A proposal was.
1 Software & Grid Middleware for Tier 2 Centers Rob Gardner Indiana University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National.
DVA-1 Project Management Proposal Chris Langley, NRAO 1 US SKA Consortium Meeting - DVA-1 Project Management Proposal June 3-4, 2010.
Managing an established facility: Scenarios for group work Kimmo Koski 26 October 2011.
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
Jordan Goodman HAWC Review - December 2007 Education and Outreach Jordan A. Goodman University of Maryland.
February 2002 Scope and Contingency; Transition to the Research Phase William J. Willis Columbia University.
Major Management & Systems Engineering Ideas for Reducing Costs Peter Wizinowich NGAO Team Meeting September 11-12, 2008.
Jordan Goodman HAWC Review - December 2007 The HAWC Site & the Mexican Collaboration Alberto Carramiñana INAOE, Mexico.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
CAPITAL COST ESTIMATES INSTALLED EQUIPMENT COSTS.
HOW TO WRITE A BUDGET…. The Importance of Your Budget Preparation of the budget is an important part of the proposal preparation process. Pre-Award and.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
The HAWC ( High Altitude Water Cherenkov) Observatory.
NSF MRI: Decreasing the Probability of Rejection Jeanine Cook Klipsch School of Electrical and Computer Engineering New Mexico State University.
1 TMT Project Update 29 November 2006 UCSC Astronomy Faculty Some of this information is sensitive or confidential.
1 LSST dark energy science collaboration meeting Penn June 11-13, 2012 LSST dark energy science collaboration meeting Penn June 2012 Governance Document.
Global Design Effort U.S. ILC Cost Translation R. Stanek, et al. Vic Kuchler 1/26/07.
Report from GG5, Dec. 20, 2005 Report from ILC GG 5: Cost and Engineering (Updates since Snowmass) Wilhelm Bialowons, Peter Garbincius and Tetsuo Shidara.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
LIGO-G M Management of the LIGO Project Gary Sanders California Institute of Technology Presented to the Committee on Programs and Plans of the.
LSST CD-1 Review SLAC, Menlo Park, CA November 1 - 3, 2011 The Funding Agency Context for the LSST DESC Steve Kahn.
Discussion Topics DOE Program Managers and OSG Executive Team 2 nd June 2011 Associate Executive Director Currently planning for FY12 XD XSEDE Starting.
AITLAB 1 Ewusi-Mensah, Seal, Abraham Developing a Collaborative Learning Facility to Support Advanced Information Systems Courses: The LMU Experience Kweku.
N. RadziwillEVLA NSF Mid-Project Report May 11-12, 2006 NRAO End to End (e2e) Operations Division Nicole M. Radziwill.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
KRA/KFS Integration Team Report KRA/KFS Functional Council Aug , 2007.
Horticulture CD-Rom Illinois CORE Curriculum. Unit C Nursery, Landscaping, and Gardening.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
Building the Institutional Planning Team Please sit with your campus team for this session.
ALMA Archive Operations Impact on the ARC Facilities.
Lesson 8 Pricing the Landscape Plan. Next Generation Science/Common Cores Standards Addressed! n CCSS.Math.Content.7.R P.A.3 Use proportional relationships.
Milagro Jordan Goodman NSF July 2007 The History of Milagro Jordan A. Goodman University of Maryland.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing Organization/Development.
Deliverables, Cost, Manpower, Schedule & Maintenance Su Dong CSC Readout Replacement CDR Oct/8/
HAWC Science  Survey of 2  sr (half the sky) up to 100 TeV energies Probe knee in cosmic ray spectrum Identify sources of Galactic cosmic rays  Extended.
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Neutrino Program (MINOS, MINERvA, General) Margaret Votava April 21, 2009 Tactical plan.
Department of Energy Office of Science  FY 2007 Request for Office of Science is 14% above FY 2006 Appropriation  FY 2007 Request for HEP is 8% above.
N. RadziwillEVLA Advisory Committee Meeting May 8-9, 2006 NRAO End to End (e2e) Operations Division Nicole M. Radziwill.
UlvestadEVLA Advisory Committee Meeting September 6-7, Future EVLA Operations Jim Ulvestad.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
1 Costs to Completion Common funds &Running Costs Support for Running OPERA Funding Issues L. Votano Resource Coordinator OPERA Funding Agencies meeting.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
EDM Fast Start Presentation WBS 11 – Assembly and Commissioning Vince Cianciolo, Paul Huffman May 23, 2006.
Milagro at Tibet Gus Sinnis LANL/P-23. Challenge and Opportunity Milagro will run for ~2 more years (or less) No viable candidate to replace Milagro on.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
Agenda – JOC Gordian Construction Task Catalog Understanding the Construction Task Catalog ® (CTC) Calculating the Bid Contractor Adjustment Factors Risk.
Delivery of FAIR In-kind items (feedback from India) Subhasis Chattopadhyay VECC-Kolkata & BI-Kolkata.
Page 1 Coles – Operating the Observatories PAC 9 Dec. 13, 2000 G L Operating the Observatories Mark Coles.
Large Synoptic Survey Telescope
Camera PDR/CD1 Planning 19 September 2008
SCT Project Management Issues
Process Economics Factors that affect profitability
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
Governance and Collaboration By-Laws
Capability of Extended Air Shower Arrays for Gamma-Ray Astronomy
S4 will be a “big” Collaboration:
HAWC Science Survey of 2p sr up to 100 TeV energies Extended Sources
MEP CoordinationMEP Coordination and Clash Detection is Extremely Significant for BIM-Know Why.
Management Breakout: MREFC Budget Summary Victor L
EVLA Computing Reorganization
Preliminary Project Execution Plan
Presentation transcript:

Jordan Goodman HAWC Review - December 2007 HAWC A Wide-Field Gamma-Ray Telescope Jordan A. Goodman University of Maryland

Jordan Goodman HAWC Review - December 2007 HAWC Budget Total Project $9.1MTotal Project $9.1M –Hardware/Construction Cost $7.4M This dominated by the tank subsystem $4.6M The remaining $2.8M is half site infrastructure –The Mexican contribution will $1.5M mostly covering the site infrastructure costs –In addition, this budget includes US project Management and technical support ($1.7M)

Jordan Goodman HAWC Review - December 2007

Jordan Goodman HAWC Review - December 2007

Jordan Goodman HAWC Review - December 2007

Jordan Goodman HAWC Review - December 2007

Jordan Goodman HAWC Review - December 2007

Jordan Goodman HAWC Review - December 2007 Quote Catalog INAOE Milagro

Jordan Goodman HAWC Review - December 2007

Jordan Goodman HAWC Review - December 2007

Jordan Goodman HAWC Review - December 2007

Jordan Goodman HAWC Review - December 2007

Jordan Goodman HAWC Review - December 2007 Existing Milagro Components

Jordan Goodman HAWC Review - December 2007

Jordan Goodman HAWC Review - December 2007

Jordan Goodman HAWC Review - December 2007

Jordan Goodman HAWC Review - December 2007

Jordan Goodman HAWC Review - December 2007 Contingency (DoE rules from D0 rebaseline) 0% on items that have been completed, about 10-15% on items that have been ordered, but not delivered (this accommodates change orders, delivery costs, etc.), about 15-45% on items that can be readily estimated based on quotes for a detailed design, about 45-65% on items for which a detailed conceptual design exists, but which may vary due to scope changes such as channel count, and about 65-85% on items for which there does not yet exist a detailed conceptual design, but which is an item required for the Project.

Jordan Goodman HAWC Review - December 2007 Contingency Calculation Tanks -Tanks - –25% (we have a bid) InstrumentationInstrumentation –15% (we have significant experience and built in some contingency) ComputingComputing –10% contingency as most computation is in later years where costs typically drop significantly Site Infrastructure (excluding water)Site Infrastructure (excluding water) –25% Our estimate is based on a LANL engineering design where US labor rate was used so there is internal contingency –25% On other estimates come from LMT experience –The road/electrical is being done for $83k less than estimated WaterWater –Add cost of local well to total with 25% contingency –Use cost of piped water system as a source of contingency funds

Jordan Goodman HAWC Review - December 2007 Contingency

Jordan Goodman HAWC Review - December 2007 Contingency (continued) How would we handle a 25% tank contingency ($1.16M)How would we handle a 25% tank contingency ($1.16M) –Several possibilities (all assuming other contingency is full used) Get more money –15% supplement from NSF in last year –Ask the Mexicans –Get other groups to join Reduce number of tanks $5k/tank we would have to cut back to 650 tanks –This means twice as long to 5  –Could populate 250 tanks with two tubes for better low energy sensitivity –Or deploy 170 outriggers we already have for better high energy sensitivity Go to smaller tanks - 3.7m tanks are available from many vendors at $4k (before bulk pricing)

Jordan Goodman HAWC Review - December 2007 MRI Proposal MRI development proposal from MarylandMRI development proposal from Maryland Proposal is $2M development proposalProposal is $2M development proposal –30% Match required $450k funding from Maryland $150k Mexican contribution HAWC core array of 256 countersHAWC core array of 256 counters –Mostly complete (installation, electronics, etc) –No personnel Proposal is competing on campusProposal is competing on campus

Jordan Goodman HAWC Review - December 2007 MRI Proposal

Jordan Goodman HAWC Review - December 2007

Jordan Goodman HAWC Review - December 2007 MRI Proposal

Jordan Goodman HAWC Review - December 2007 MRI Proposal Significantly better than MilagroSignificantly better than Milagro Probably move some outriggers (~100)Probably move some outriggers (~100) Can be built in 2 yearsCan be built in 2 years

Jordan Goodman HAWC Review - December 2007 HAWC Org Chart J. Goodman & A. Carramiñana Executive Committee J. Goodman & A. Carramiñana B. Dingus & M. Gonzalez Construction Manager, Working Groups heads Institutional Reps Facilities Working GroupAnalysis Working Group US Funding Agencies Members of the Collaboration Mexican Funding Agencies External Advisory Committee

Jordan Goodman HAWC Review - December 2007 Institutional Responsibilities Project management: MD, INAOE Data Man. Software: MD, UNAM Construct Management: LANL BUAP, INAOE Electronics: MSU, UTAH, UNAM Calibration & Monitoring: UNM, LANL, BUAP

Jordan Goodman HAWC Review - December 2007 Project Management Collaboration SpokespeopleCollaboration Spokespeople –During construction they will be Jordan Goodman and Alberto Carramiñana, the PIs –When the project begins operations, two spokespeople will be elected by the collaboration to staggered two-year terms. Institutional Representatives BoardInstitutional Representatives Board –a representative from each institution –This board will make decisions such as collaboration membership and authorship of papers. Project Management BoardProject Management Board –Role will be directing construction and operation of HAWC. –The two spokespeople, the US construction manager (Brenda Dingus), and the analysis coordinator (Magda González).

Jordan Goodman HAWC Review - December 2007 Project Management Maryland will manage all NSF construction and operations funds (a role we had in Milagro)Maryland will manage all NSF construction and operations funds (a role we had in Milagro) –Jordan Goodman will be PI –Subcontracts from Maryland will fund construction activities at other US institutions DoE funds will flow through Los AlamosDoE funds will flow through Los Alamos –Brenda Dingus will be PI The Mexican contribution from CONACyT will be managed by the lead institutions in Mexico (INAOE, UNAM and BUAP)The Mexican contribution from CONACyT will be managed by the lead institutions in Mexico (INAOE, UNAM and BUAP) –Alberto Carramiñana will be PI –He will coordinate Mexican funding

Jordan Goodman HAWC Review - December 2007 HAWC Operations Costs Milagro Ops budget was ~$800k/yr ($560k to UMD)Milagro Ops budget was ~$800k/yr ($560k to UMD) –$260k went to Los Alamos through Maryland` –Scott and Michael were paid through UCI & UCSC $240k –Of the remaining $300k a significant amount went to computing and data archiving –Some went to filters and maintenance –Los Alamos contributed significantly Electricity etc… We anticipate that HAWC will cost the NSF approximately the same to operate as there will be Mexican technical support and monetary support (like LANL did for Milagro)We anticipate that HAWC will cost the NSF approximately the same to operate as there will be Mexican technical support and monetary support (like LANL did for Milagro)

Jordan Goodman HAWC Review - December 2007 Personnel at Site During Initial Construction From US (~4 FTE)From US (~4 FTE) –Brenda Dingus (project manager) 50% –Michael Schneider (project engineer) 50% –Scott DeLay (engineer) 25% –Jordan Goodman 25% –Andy Smith 25% –Gus Sinnis 10% –One postdoc, one/two students 100% –Other Scientists (~10-15%) as needed From Mexico (~5 FTE)From Mexico (~5 FTE) –Three technicians 100% –Two faculty 50% each –Four faculty 25% each