September 16, 2002 ID Groups Physics Coordinator B. Klima Software and Computing A. Boehnlein, J. Qian Physics Groups Spokesmen G. Blazey J. Womersley.

Slides:



Advertisements
Similar presentations
Sep Nick Hadley DØ Prague Workshop 1  Overview  Organization  Status (brief)  Conclusion Run II Computing and Software.
Advertisements

Amber Boehnlein, FNAL D0 Computing Model and Plans Amber Boehnlein D0 Financial Committee November 18, 2002.
DOE, July 23, 2003, R. Demina1 DØ and CMS physics program Regina Demina July 23, 2003.
Sarah Eno1 MD Contribution to Simulation and W Width/Mass Sarah Eno 30 Aug 2005 DOE Review.
Nick Hadley Maryland DØ Effort Maryland DOE Review August 30, 2005.
Open Meeting on LHC Ideas for a Physics Analysis Center Open Meeting on LHC Ideas for a Physics Analysis Center Fermilab, September 4, 2003 Regina Demina.
June 2003 M.Mulders - Fermilab 1 Diffractive results from DØ and prospects for Run II Martijn Mulders Fermilab for the DØ collaboration (with special thanks.
September 1, 2012 D0 Collaboration Organization TeV Working Groups Physics R. Hirosky, R. Van Kooten Physics Groups Spokespersons G. Bernardi D. Denisov.
January 26,2007 D0 Collaboration Organization TeV Working Groups Physics J. Hobbs R. Van Kooten Physics Groups Spokespersons T. Wyatt D. Denisov Online.
July 7, 2012 D0 Collaboration Organization TeV Working Groups Physics R. Hirosky, C. Schwanenberger Physics Groups Spokespersons G. Bernardi D. Denisov.
Ursula Bassler/Gregorio Bernardi1convenors meeting, Sep 4th 2003 CALGO: Overview Create a dynamic group  reduce the number of meetings  1 big meeting.
L3 Filtering: status and plans D  Computing Review Meeting: 9 th May 2002 Terry Wyatt, on behalf of the L3 Algorithms group. For more details of current.
9/14/2001D0 Simulation Tasks Q.Li 1 Simulation Tasks Status Qizhong Li Fermilab Sept. 14, 2001 D0 Collaboration Meeting.
EPS 2003, July 19, 2003David Buchholz, Northwestern University Performance of the D0 Experiment in Run II Detector Commissioning and Performance Accelerator,
Nick Hadley Run II Physics (I) Nick Hadley The University of Maryland New Perspectives 2000 Fermilab - June 28, 2000.
On the same page with Streaming Adam Lyon Analysis Tools - 6/04/2002.
Remote Production and Regional Analysis Centers Iain Bertram 24 May 2002 Draft 1 Lancaster University.
Aug 1, 2009 D0 Collaboration Organization TeV Working Groups Physics A. Juste Physics Groups Spokespersons D. Denisov S. Soldner-Rembold Production Speakers.
August 27,2007 D0 Collaboration Organization TeV Working Groups Physics A. Juste, S. Soldner-Rembold Physics Groups Spokespersons D. Denisov D. Wood Production.
November 7, 2001Dutch Datagrid SARA 1 DØ Monte Carlo Challenge A HEP Application.
Aug 2005 Working Groups Physics J. Hobbs V.Buescher (deputy) Physics Groups Spokespersons G. Blazey T. Wyatt Trigger Silicon Layer O Online L3/DAQ Trigger.
Instrumentation of the SAM-Grid Gabriele Garzoglio CSC 426 Research Proposal.
Data Grid projects in HENP R. Pordes, Fermilab Many HENP projects are working on the infrastructure for global distributed simulated data production, data.
December 28, 2009 D0 Collaboration Organization TeV Working Groups Physics G. Bernardi, M. Verzocchi Physics Groups Spokespersons D. Denisov S. Soldner-Rembold.
September 1, 2009 D0 Collaboration Organization TeV Working Groups Physics G. Bernardi, M. Verzocchi Physics Groups Spokespersons D. Denisov S. Soldner-Rembold.
A Graphics Sampler for the D  Detector G. Alverson, K. Bos, T. Burnett, F. Canelli, D. Coppage, L. Duflot, Y. Gershtein, N. Graf, S. Hagopian, P. Hamel,
10-25 years of DØ FranceE. Kajfasz1 -France RunII RunIITracking Hard/Soft-ware with.
SIST 2004 SIST Ayodele Onibokun August 10, 2004 Based on the code developed by: Henry Barnor, Fermilab Summer Student D ø Calibration Database Browser.
Collider Detector at Fermilab Sung-hyun chang High Energy Physics lab. KNU.
September 19,2006 TeV Working Groups Physics J. Hobbs R. Van Kooten Physics Groups Spokespersons T. Wyatt D. Denisov Trigger Silicon Layer O Online L3/DAQ.
Elizabeth Gallas August 9, 2005 CD Support for D0 Database Projects 1 Elizabeth Gallas Fermilab Computing Division Fermilab CD Grid and Data Management.
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
L3 Filtering: - short- and medium term plans - how you can help out All-D  Meeting: 14 th March 2003 Terry Wyatt (FNAL-CD/Manchester) on behalf of the.
DZero RunIIb PMG June 7, Run IIb Project Status Vivian O’Dell.
DZero Run IIb PMG February 25, Run IIb DZero PMG  Status overview, issues (Kotcher)  Schedule, project status (Freeman)  AOB Jon Kotcher Fermilab.
DZero Run IIb PMG January 28, Agenda Run IIb D-Zero PMG January 28, 2003  Overview, issues (Kotcher)  Project status (O’Dell)  Trigger technical.
1 Silke Duensing DØ Analysis Status NIKHEF Annual Scientific Meeting Analysing first D0 data  Real Data with:  Jets  Missing Et  Electrons 
Rev of Run IIb, Nov 4-8, 2002, A. Bean 1 Silicon Management  Organization and Management  Schedule  Resources  Conclusions Alice Bean Univ. of Kansas.
V. O’Dell, D0 RunIIb PMG 4-Feb Dzero Run IIb PMG  Agenda u Overview & Management News: V. O’Dell u Trigger Upgrade Status:P. Padley u Silicon closeout.
1 EIR Nov 4-8, 2002 DAQ and Online WBS 1.3 S. Fuess, Fermilab P. Slattery, U. of Rochester.
DZero Run IIb Rev Nov 05 ‘03 1 Kotcher Agenda (from Rebaselining Review)  Introduction (Kotcher – 10’)  Trigger & DAQ/Online (Wood – 30’) u AFE II/TriP.
SiD workshop, January 16-18, 2013 H.Weerts Building the SiD collaboration H.Weerts Argonne National Laboratory Proposal & suggestions.
India in DØ Naba K Mondal Tata Institute, Mumbai.
Aurelio Juste (Fermilab) Rencontres de Moriond, March OUTLINE Tevatron Run 2 The upgraded DØ Detector Status Performance First Physics Results Outlook.
CMS-UK Oversight Committee 18/11/03 R M Brown - RAL 1 Exploded view of CMS ECAL Tracker HCAL 4T solenoid Muon chambers Total weight: 12,500 t Overall diameter:
Collaboration meeting, October 11, 2002Jianming Qian, University of Michigan Computing & Software DØ main executables Data and MC production Data-handling.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
L3 Filtering: status and plans for the near future D  Collaboration Meeting: 25 th April 2002 Dan Claes and Terry Wyatt, on behalf of the L3 Algorithms.
March 15,2005 Working Groups Physics J. Hobbs V.Buescher (deputy) Physics Groups Spokespersons T. Wyatt D.Denisov Trigger Silicon Layer O Online L3/DAQ.
February 3, 2005DZero Run IIb Director's Review1 Standing Committee on Upgrade Installation to Physics Commissioning  Charge: u Convened by spokespersons.
10/24/2003Yu Chul Yang(CHEP,KNU) Accelerator & Detector 1.Accelerator 2. Tevatron 3. Detector 4. CDF Detector.
September 1, 2014 D0 Collaboration Organization TeV Working Groups Physics R. Hirosky, R. Van Kooten Physics Groups Spokespersons D. Denisov P. Grannis.
DØ Physics - Status and Plans Boaz Klima Fermilab Collaboration Meeting Feb. 15, 2002.
DZero Run IIb PMG December 10, Agenda Run IIb D-Zero PMG December 10, 2002  ESAAB news (Lab, Project, DOE)  Project status, overview (Kotcher)
Director’s Review July 15, Installation and Technical Commissioning of D0 RunIIb L0 Silicon and Trigger Upgrades Schedule & Costs R.P. Smith for.
The Manchester group on DØ at the Fermilab Tevatron proton-antiproton collider Manchester ‘Christmas’ Meeting 2003 Terry Wyatt Tevatron/DØ status Manchester.
Collaboration Mtg April 14, 2000 DO Timeline J F M A M J J A S O N D J F M D Install silicon front-end ICD FPS Lum (L0) CFT install/hookup 1/2.
Run 2 Jets at the Tevatron Iain Bertram Lancaster University/DØ Experiment PIC2003  Inclusive Cross Section  Dijet Mass  Structure.
IVth LHC Symposium, May 1-3, FermilabJianming Qian, University of Michigan Snapshot of Tevatron collider CDF detector DØ detector & First Run II.
USCMS May 2002Jim Branson 1 Physics in US CMS US CMS Annual Collaboration Meeting May 2002 FSU Jin Branson.
Search for a Standard Model Higgs Boson in the Diphoton Final State at the CDF Detector Karen Bland [ ] Department of Physics,
Research Program Brendan Casey DOE Annual Program Review September
Jianming Qian, UM/DØ Software & Computing Where we are now Where we want to go Overview Director’s Review, June 5, 2002.
DZero Monte Carlo Status, Performance, and Future Plans Greg Graham U. Maryland - Dzero 10/16/2000 ACAT 2000.
Search for Standard Model Higgs in ZH  l + l  bb channel at DØ Shaohua Fu Fermilab For the DØ Collaboration DPF 2006, Oct. 29 – Nov. 3 Honolulu, Hawaii.
Status of the DØ Physics Effort Boaz Klima Fermilab Collaboration Meeting Sept. 14, 2001.
CALGO: Software Tasks cal software:
Kevin Burkett Harvard University June 12, 2001
The DESY ATLAS Group The Group and ALFA Physics SLHC upgrade
Dzero Data Handling and Databases
Presentation transcript:

September 16, 2002 ID Groups Physics Coordinator B. Klima Software and Computing A. Boehnlein, J. Qian Physics Groups Spokesmen G. Blazey J. Womersley Trigger Silicon Online DAQ Trigger Subdetectors Trigger Board Chair: N. Varelas Offline Resources Board Chair: A. White Run 2B Project J. Kotcher Speakers Bureau Chair: G. Bernardi Advisory Council Chair: V. Büscher Institutional Board Chair: T. Wyatt DAQ/Online Installation Infrastructure Global Systems and Production Data Access and Databases Algorithms Simulation Online Run Coordinator D. Denisov

September 16, 2002 Infrastructure A. Jonckheere, L. Duflot Reco and L3 filters integration EM ID A. Bassler V. Büscher Muon ID F. Deliot S. Soldner-R. Jet/ME T ID G. Bernardi L. Groer Tau ID D. Chakraborty Y. Gerstein Global Systems and Production I. Bertram, M. Diesburg, J.Yu Data Access and Databases L. Lueking, R. Brock Algorithms H. Melanson S. Choi (deputy) Software and Computing A. Boehnlein, J. Qian b ID F. Filthaut M. Narain Luminosity M. Begel H. Schellman Fwd. Proton S. Novaes M. Souza Simulation Q. Li, S. Protopopescu SMT H. Fox, E. Kajfasz Spokesmen G. Blazey J. Womersley Trigger Simulation D. O’Neil, S.Protopopescu Advisory Council Chair: V. Büscher Institutional Board Chair: T. Wyatt SMT Y. Kulik Calorimeter/PS L. Sawyer A Turcot Muon system C. Clément M. Mulders Global Tracking V. Kuznetsov H. Greenlee Calibration/ Alignment G. Gutierrez T. Yasuda CFT M. Hildreth Data Tiers (S. Protopopescu) Level 3 filtering T. Wyatt D. Claes Vertexing G. Lima, G. Watts Triggermeisters T. Diehl, E. Gallas, T.Toole CFT/CPS/FPS G. Ginther Calorimeter N. Parua TBA ICD (A. Stone) A. White Central Muon T. Diehl Fwd Muon (D. Denisov) Solenoid R. Smith Luminosity Monitor B. Casey Online S. Fuess, P. Slattery FPD A. Brandt Run Coordinator D. Denisov A. Stone (Deputy) Electrical Operations: R. Hance Mechanical Operations: R. Rucinski Trigger Board Chair: N. Varelas Offline Resources Board Chair: A. White Physics Coordinator B. Klima Jet Energy Scale A. Goussiou I. Iashvili Silicon M. Demarteau A. Bean (Deputy) Run 2B Project J. Kotcher, Proj. Mgr. R. Partridge (Deputy) M. Johnson (Tech. Coord.) Project Office W. Freeman C. Yoshikawa B Physics B. Abbott V. Jain New Phenomena G. Brooijmans G. Landsberg QCD J. Krane C. Royon Top E. Barberis C. Gerber WZ G. Steinbrueck M. Verzocchi Higgs J. Hobbs A. Kharchilava Installation R. Smith DAQ/Online S. Fuess P. Slattery Trigger H. Evans D. Wood Online S. Fuess P. Slattery DAQ D. Chapin G. Watts Trigger R. Lipton Event Generators (S. Protopopescu) D0gstar S. Kunori D0sim program (Q. Li, S. Protopopescu) Fast simulation S. Eno Speakers Bureau Chair: G. Bernardi

September 16, 2002 Spokesmen G. Blazey J. Womersley Luminosity Monitor B. Casey Online S. Fuess, P. Slattery FPD A. Brandt Trigger Board Chair: N. Varelas Reports to Physics Coordinator Reports to Simulation Group Run 2B Project J. Kotcher, Proj. Mgr. R. Partridge (Deputy) M. Johnson (Technical Coord.) Project Office W. Freeman, C. Yoshikawa Trigger D. Edmunds Silicon Mechanical: H. Lubatti Electrical: L. Bagby, R. Sidwell Run 2B upgrades F. Bartlett D. Chapin J. Fitzmaurice (S. Fuess) S. Krzywdzinski G. Savage V. Sirotenko G. Watts L1 Cal Upgrade M. Abolins (H. Evans) Mechanical W. Cooper K. Krempetz Sensors R. Demina F. Lehner Electronics A. Nomerotski N. W. Reay Production J. Fast H. Haggerty QA, Testing, Burn-in C. Gerber, TBA Rad. Monitor S. de Jong Simulation E. Chabalina F. Rizatdinova Installation R. Smith DAQ/Online S. Fuess P. Slattery Trigger H. Evans D. Wood Silicon M. Demarteau A. Bean (Deputy) Technical Organization SMT H. Fox, E. Kajfasz CFT/CPS/FPS G. Ginther Calorimeter N. Parua TBA ICD (A. Stone) A. White Cen Muon T. Diehl Fwd Muon (D. Denisov) Solenoid R. Smith L1 Track Trigger M. Narain L1 Cal/ Track Match K. Johns L2  upgrade R. Hirosky Silicon Track Trigger U. Heintz Trigger Simulation D. O’Neil, S.Protopopescu DAQ D. Chapin G. Watts Trigger R. Lipton Triggermeisters T. Diehl, E. Gallas, T. Toole Run Coordinator D. Denisov A. Stone (Deputy) Electrical Operations: R. Hance Mechanical Operations: R. Rucinski Simulation M. Hildreth E. Perez

September 16, 2002 Joint CDF/DØ Tevatron Physics Working Groups Spokesmen G. Blazey J. Womersley Triggermeisters T. Diehl, E. Gallas, T. Toole Trigger Board Chair: N. Varelas Offline Resources Board Chair: A. White Physics Coordinator B. Klima Integration of Reconstruction program and Level 3 filters together with Algorithms groups B Physics H. Evans V. Jain New Phenomena G. Brooijmans V. Büscher QCD J. Krane M. Zielinski Top E. Barberis A. Juste Electroweak S. Eno M. Grunewald Higgs J. Hobbs N. Varelas Physics Organization Associate Director for Research H. Montgomery CDF EM ID A. Bassler V. Buescher Muon ID F. Deliot S. Soldner-R. Jet/ME T ID G. Bernardi L. Groer Tau ID D. Chakraborty Y. Gerstein b ID F. Filthaut M. Narain Luminosity M. Begel H. Schellman Fwd. Proton S. Novaes M. Souza Jet Energy Scale A. Goussiou I. Iashvili B Physics B. Abbott V. Jain New Phenomena G. Brooijmans G. Landsberg QCD J. Krane C. Royon Top E. Barberis C. Gerber WZ G. Steinbrueck M. Verzocchi Higgs J. Hobbs A. Kharchilava Speakers Bureau Chair: G. Bernardi

September 16, 2002 Executables Software and Computing D0Gstar Software and Computing SMT Y. Kulik Calorimeter/PS L. Sawyer A Turcot Muon system C. Clément M. Mulders Global Tracking V. Kuznetsov H. Greenlee Calibration/ Alignment CFT M. Hildreth Vertexing G. Lima, G. Watts D0Sim/Raw2s im PMCS Generators Reco L3filters TrigSim/L2 Graphics Software Development Teams Development Operations Analysis Model Central Systems ClueD0 D0mino CAB Interface To Remote Centers Interface to Enstore Prod Farms FNAL MC Web DH Tools Tiers Streaming Analysis Tools RTE/D0tool MC_Runjob Builds Databases Core SAM Grid? Object ID groups Physics OATF Collaborative tools Online ORB Strawman Reorg

September 16, 2002 Trigger Silicon DAQ/Online Installation ID Groups Physics Coordinator Physics Groups Spokesmen Institutional Board Computing Division Particle Physics Division DØ Experiment Department DØ Computing and Analysis Department Personnel and Funding for operations Collaboration Fermilab Director M. Witherell Associate Director for Research H. Montgomery Physics Advisory Committee Online DAQ Trigger Subdetectors Laboratory Project management for Run 2B Trigger Board Offline Resources Board Run 2B Project Infrastructure Global Systems and Production Data Access and Databases Algorithms Simulation Online Software and Computing Run Coordinator

September 16, 2002 ES&H responsibilities during operations Spokesmen Particle Physics Division Fermilab Director Associate Director for Research Mechanical Department Electrical Department DØ Experiment Department Shift Captain Shift Physicists Technical Personnel Run Coordinator Organization chart for DO operations plan