CDF Silicon Workshop 2006 12 th May 2006 New BLM & BLM electronics Jose E. Garcia, Jennifer Gimmell, Ulrich Husemann.

Slides:



Advertisements
Similar presentations
TileCal Optical Multiplexer Board 9U VME Prototype Cristobal Cuenca Almenar IFIC (Universitat de Valencia-CSIC)
Advertisements

HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
Diamonds in CDF Peter Dong, UCLA Ricardo Eusebi, FNAL Anna Sfyrla, Geneva Rick Tesarek, FNAL Rainer Wallny, UCLA With much help from Jonathan Lewis (FNAL)
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
CRIO as a hardware platform for Machine Protection. W. Blokland S. Zhukov.
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
Update on APV25-SRS Electronics Kondo Gnanvo. Outline Various SRS Electronics Status of the APV25-SRS UVa Test of the SRU with multiple.
Response to TeV BLM Review Report (Beams Doc 1147) 1 Recommendation # 1: …the BLM upgrade be done Response to #1: Great - thankyou for this endorsement.
Digital Signal Processing and Generation for a DC Current Transformer for Particle Accelerators Silvia Zorzetti.
DØ Radmon status 26/08/99 Sijbrand de Jong/Bram Wijngaarden/Silke Duensing Contents:  What is to be monitored and what actions to take ?  Historical.
Horz V1 H1 H2 V2 Pbars in Recycler Ring Stripline Kickers Split Plate Pickups A-B Vertical Digital Damper Vert Recycler Transverse Damper System Similar.
Yuri Velikzhanin NuTel TV meeting, June 13 (Friday), 2003 Status of electronics for NuTel prototype.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Rome 4 Sep 04. Status of the Readout Electronics for the HMPID ALICE Jose C. DA SILVA ALICE.
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
March running preparation Alexandre Camsonne Hall A meeting February 28 th 2014.
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
R. Lipton Shifters Training 2/14/2003 D0SMT Radiation Monitoring Contents: Radiation effects in silicon and impact on RunIIb Dosimetry techniques The BLM.
Test of the MAPS add-on board S. Amar-Youcef, M. Deveaux, D. Doering, C. Müntz, S. Seddiki, P. Scharrer, Ch. Schrader, J. Stroth, T. Tischler.
TeV BLM Review 4/19/041 Tevatron BLM Review - Schedule BLM Replacement Prototype schedule: Provide prototype digitizer cards, crate, readout path by ~
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
D. Still-FNAL/Tevatron HALO '03 Tevatron Collider II Halo Removal System Dean Still Fermilab Tevatron Department 5/21/2003 Motives for the Collider Run.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
NTOF DAQ status D. Macina (EN-STI-EET) Acknowledgements: EN-STI-ECE section: A. Masi, A. Almeida Paiva, M. Donze, M. Fantuzzi, A. Giraud, F. Marazita,
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting August 3, 2004.
Fermilab February 17, 2003Recycler BPM Front-end1 Duane C. Voy
Beam diagnostics developments at LAPP: Digital part CTF3 Collaboration Meeting Louis Bellier, Richard Hermel, Yannis Karyotakis, Jean Tassan,
Electronics: Junction Cards, Adapter Card, Purple Card, …. Ron Sidwell, K. Harder, T. Sobering, R. Taylor, E. VonToerne, Kansas State U.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
CMS pixel telescope at MTEST 1 A. Kumar, S. Kwan, A. Prosser, R. Rivera, M. Turqueti, L. Uplegger.
FPD STATUS Carlos Avila Uniandes/UTA 1. FPD overview 2. Roman pot and detector status 3. FPD readout integration status 4. Software status 5. Stand-alone.
GAN: remote operation of accelerator diagnosis systems Matthias Werner, DESY MDI.
SBS/A1n Fast DAQ Alexandre Camsonne October 19 th 2012.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Gueorgui ANTCHEV PH-TOT TOTEM Collaboration Meeting – March TOTEM System in H8 - Overview, Block Diagram and Main Characteristics Applications -
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
S. Pordes TeV BLM Review 4/19/04 1 Motivation for replacing present system: => Requirements on replacement system => Motivation for architecture of proposed.
Beam Loss Monitor Upgrade J. Lewis Run 2 Meeting 27 January 2005.
LHC CMS Detector Upgrade Project RCT/CTP7 Readout Isobel Ojalvo, U. Wisconsin Level-1 Trigger Meeting June 4, June 2015, Isobel Ojalvo Trigger Meeting:
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
F Monitor of Beam in the Abort Gap Randy Thurman-Keup DOE Review of Tevatron Operations at FNAL March 29-31, 2005 a.k.a. Abort Gap Integrator (AGI)
Tevatron Beam Position Monitor Upgrade Stephen Wolbers (for the Tevatron BPM Upgrade Project) PAC05, Knoxville, TN May 16-20, 2005.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
BLM System R2E and Availability Workshop, B.Dehning 1 Bernd Dehning CERN BE-BI
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Status of the SVD DAQ Koji Hara (KEK) 2012/1/16 TRG/DAQ meeting1.
Monitoring hardware for SVD (VXD) L.Lanceri, L.Vitale /INFN Trieste VXD Workshop, 01/10/2014 Slow Controls discussion session 1 1.Radiation & beam abort.
PC-based L0TP Status Report “on behalf of the Ferrara L0TP Group” Ilaria Neri University of Ferrara and INFN - Italy Ferrara, September 02, 2014.
NMLTA Protection System Update -Loss Monitors- Arden Warner September 2 nd, 2009.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Digital Acquisition: State of the Art and future prospects
Injectors BLM system: PS Ring installation at EYETS
CMS EMU TRIGGER ELECTRONICS
Hall A Compton Electron detector overview
Combiner functionalities
Status of muon monitor R&D and construction
Beam instrumentation and background monitoring
Presentation transcript:

CDF Silicon Workshop th May 2006 New BLM & BLM electronics Jose E. Garcia, Jennifer Gimmell, Ulrich Husemann

Outline J.E.Garcia – CDF Silicon Workshop – Santa Barbara 2 New BLM System New BLM System Motivation Motivation (why do we need an upgrade) Characteristics Characteristics (electronics, …) Current Status Current Status Installation plans Installation plans Commissioning Plans Commissioning Plans (software, firmware, ACNET interface) Summary Summary

Motivation J.E.Garcia – CDF Silicon Workshop – Santa Barbara 3 Tevatron project to improve ABORT system Prevent against this Long reaction time

Motivation J.E.Garcia – CDF Silicon Workshop – Santa Barbara 4 ► CDF BLM Upgrade Add more information to the old system which is working reliably Use same well-understood type of detectors with enhanced capabilities (new electronics) Maybe an intermediate step towards a diamond-based beam abort system ► Goals: install new BLMs and all cables Shutdown: install new BLMs and all cables commissioning After shutdown:commissioning

System Overview J.E.Garcia – CDF Silicon Workshop – Santa Barbara 5 Integrate BLM current and digitize at Tevatron turn frequency (every 21  s) Integrate BLM current and digitize at Tevatron turn frequency (every 21  s) Form three running sums for additional integration periods Form three running sums for additional integration periods  Programmable time constants One abort threshold per integration period of each channel One abort threshold per integration period of each channel Possibility to change abort thresholds and masks in response to machine status Possibility to change abort thresholds and masks in response to machine status  Read-out using VME system and Ethernet  VME CPU can be used for system computations

System Characteristics J.E.Garcia – CDF Silicon Workshop – Santa Barbara 6 High Voltage Power Supply BLM VME / ACNET Controller Card Interface to VME crate Timing Card Synchronous integration clock digitizers Abort Card FPGA info from digitizers compared with abort masks and produce abort signals Digitizer Card 4 Channels with integrator and ADC FPGA Compares readings and sums to programmed thresholds - i.e. 1ms, 10ms, 1s BLM Electronics BLM

Current Status J.E.Garcia – CDF Silicon Workshop – Santa Barbara 7 Picked up 5 new BLMs from Marv Olson of AD Instrumentation Department (4 to be installed, 1 spare) BLMs are tested by AD, gain: 10  C/Gy Old fixtures removed from collision hall New fixtures finished in April 2006: add-on to old fixtures Cables ready for the installation BLM BLMs

Installation Plans J.E.Garcia – CDF Silicon Workshop – Santa Barbara 8 Sharing crate with diamonds (first-floor counting room 1RR04D) Richard Tesarek Shutdown project New Modules already requested Installation of new BLM System Installation of new BLM System  BLMs and cables set-up

Commissioning Plans J.E.Garcia – CDF Silicon Workshop – Santa Barbara 9 Initial phase of testing correct read-out – immediately after installation Check that the dose rate and integrated dose agree for old and new system. Set up the abort logic of the new system such that the limit is reached during a regular store. Check if the radiation levels for an abort agree – immediately after accelerator start-up Run the system with same limits and for an abort. Check if both systems have fired and compare their FIFO contents. Keep new BLM as back-up system up to reliability is completely proved – depending on how much chances do we have to test it

Before Commissioning J.E.Garcia – CDF Silicon Workshop – Santa Barbara 10 ACNET Controls for BLMs Adapt actual settings in ACNET (E2 page) for new BLMs (next week) Use similar set-up: Global reset Current rate and integrated dose FIFO controls Paul Derwent will help us in the integration Use New Java Front-End Establish a integration of radiation (1 minute, full store) out of the built-in rolling sums Some infrastructure is needed : Development of mechanisms for abort acknowledgment - equivalent to current Kludge card.

Summary J.E.Garcia – CDF Silicon Workshop – Santa Barbara 11 We will have our slot in the following weeks We will have our slot in the following weeks  Material and BLMs are ready for installation Commissioning Commissioning  Read-out system: VME modules and ACNET controls will be set-up during next week  Prepare system for radiation level tests at the beam startup  New system working as backup for a test period Unfortunately, I was not able to join you there. Finally after some troubles I have my visa. Enjoy the weekend!!!

CDF Silicon Workshop th May 2006 Additional Slides