GLAST LAT ProjectDOE/NASA Status Review, March 31 & April 1, 2004 4.1.5 Calorimeter Subsystem 1 GLAST Large Area Telescope: Calorimeter (CAL) Subsystem.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 E. Grove Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
Advertisements

GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST Calorimeter LAT F2F Meeting 17 Mar 2005 Naval Research Lab Washington DC W Neil Johnson 1 Subsystem Mgrs F2F Meeting Calorimeter Subsystem 17 Mar.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. N. Johnson / P. Carosso 1 LAT Calorimeter Subsystem W. Neil Johnson Calorimeter.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering.
GLAST LAT Project – Cost and Schedule ReviewNovember 3, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review November 3, 2004.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE Rebaseline Review, February 13, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Chief Engineer.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby1 Martin Nordby Stanford Linear Accelerator Center Stanford University.
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectNovember 17, 2004 AntiCoincidnce Detector 1 GLAST Large Area Telescope: Face to Face Meeting November 17, 2004 AntiCoincidence Detector.
GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Dizon Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
SPP FIELDS DFB Quarterly June 2014 Solar Probe Plus FIELDS Instrument Quarterly Digital Fields Board 1.
GLAST Large Area Telescope:
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 Didier Bédérède & Philippe Bourgeois DSM DAPNIA GLAST Large Area Telescope Calorimeter Subsystem.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems X-LAT Assy1 GLAST Large Area Telescope: Mechanical.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
GLAST LAT ProjectInstrument Analysis Workshop, June 2004 J. Eric Grove Naval Research Lab Washington DC Gamma-ray Large Area Space Telescope CAL Detector.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 W Neil Johnson 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope:
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
The GLAST Large Area Telescope – Design, construction, test and calibration Luca Latronico (INFN-Pisa), Gloria Spandre (INFN-Pisa) on behalf of the GLAST.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Prat CNRS/IN2P3-LLR Ecole Polytechnique GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
GLAST LAT ProjectDOE/NASA Stratus Review, March 30 & 31, 2004 Systems Engineering 1 GLAST Large Area Telescope: Pat Hascall SLAC System Engineering Manager.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
GLAST LAT Project CAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 PREP For CDR - April Schedule Wall Walk GSFC Chart Flip (Select) Post.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems September 2003 GSFC Status Marc Campell, Subsystem Manager.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Dizon Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
109-IDPU-Chassis-Donakowski 1 30 Sep – 01 Oct 2009DRAFT RBSP EFW ICDR 109-IDPU-Chassis-Donakowski IDPU Chassis Mechanical Design and Development Bill Donakowski.
GLAST Calorimeter Monthly Cost / Schedule / Mission April 2004 Naval Research Lab Washington DC wnjohnson 1 Monthly Cost/Schedule/Mission Review GLAST.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
Bill Raynor Naval Research Lab
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Calorimeter Subsystem of GLAST Large Area Telescope
SPF MAG Quarterly Report – Feb 2015
GLAST Large Area Telescope:
Peer Review Agenda (Suggested).
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
Integration and Test Organization Chart
GLAST Large Area Telescope
GLAST Large Area Telescope
GLAST Large Area Telescope:
Introduction and Overview
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectDOE/NASA Status Review, March 31 & April 1, Calorimeter Subsystem 1 GLAST Large Area Telescope: Calorimeter (CAL) Subsystem WBS: W. Neil Johnson Naval Research Lab, Washington DC Calorimeter Subsystem Manager (202)–767–6817 Gamma-ray Large Area Space Telescope

GLAST LAT ProjectDOE/NASA Status Review, March 31 & April 1, Calorimeter Subsystem 2 Contents  Technical Status  Schedule  Cost and Budget  Next 6 months  Summary

GLAST LAT ProjectDOE/NASA Status Review, March 31 & April 1, Calorimeter Subsystem 3 Technical Status Engineering Model  Completion of the CAL Engineering Model environmental test program (qualification levels)  No problems identified in Vibration or Thermal Vac testing  EMI/EMC issues were identified –Contributing causes – test configuration issues and fidelity of TEM/PS unit used (GSE not flight-like). –Design changes have been applied to flight design to address these problems.  EM CAL supported LAT I&T development at SLAC  EM CAL performance measured at heavy ion beam test at GSI in Darmstadt, Germany. EM Calorimeter installation at heavy ion beam facility EM Energy vs Beam Tagger shows quenching in CsI

GLAST LAT ProjectDOE/NASA Status Review, March 31 & April 1, Calorimeter Subsystem 4 Technical Status Crystal Detector Elements  CsI Crystal Procurement essentially complete (~80% delivered from Amcrys-H).  Hamamatsu photodiode procurement is complete.  PIN Diode Assembly process and contract established. Flight production is well under way (> 40% complete).  PIN diode and CDE qualification programs are complete.  Flight CDE production is well under way (>25% complete.) ISSUES: None SCHEDULE:Baseline CDE Bonding at Swales Aerospace PIN Diode Assembly (PDA)

GLAST LAT ProjectDOE/NASA Status Review, March 31 & April 1, Calorimeter Subsystem 5 Technical Status Mechanical Structure  All flight machined aluminum, titanium and steel parts have been manufactured and plated as required.  Flight carbon composite structure manufacturing process has been finalized at IN2P3/LLR and qualified with Structural Model 2 (SM2) testing.  First three flight structures have been manufactured, tested. Two have been delivered to NRL. ISSUES:None SCHEDULE: - 35 Day Variance Carbon structure with test Al parts and dummy CDEs Vibration test of FMA structure

GLAST LAT ProjectDOE/NASA Status Review, March 31 & April 1, Calorimeter Subsystem 6 Technical Status ASICS  New revision of analog ASIC, GCFE9A, has been manufactured and tested.  Over 11,000 flight parts were received after two month delay in packaging at ASAT in Hong Kong.  SEE Radiation testing is complete. Only TID testing remains.  Functional test screening provided >7,000 parts. Screening and qualification program is on-going. No problems to date. ISSUES: Recovering from 9 week delay in delivery. Use before completion of qualification. SCHEDULE: -53 day variance Radiation Testing at Brookhaven Thermal forcing unit for ASIC functional testing at temperature extremes.

GLAST LAT ProjectDOE/NASA Status Review, March 31 & April 1, Calorimeter Subsystem 7 Technical Status Analog Front End Electronics  All EEE parts are approved except ASICs which are in qualification testing.  Radiation testing complete except for Total Dose on ASICs. No problems to date.  Prototype of flight AFEE boards have been manufactured, assembled and tested.  Minor adjustments required to avoid potential mechanical interference with structure for parts added for EMI/EMC filtering.  Flight PCBs are being manufactured.  Contract for assembly of flight AFEE boards is in place. ISSUES: Rework of mechanical interference problems on PCB and pre- production review SCHEDULE: -24 day variance Prototype Flight AFEE Card Assembly

GLAST LAT ProjectDOE/NASA Status Review, March 31 & April 1, Calorimeter Subsystem 8 Technical Status Assembly and Test  GLAST CAL assembly and test clean room has been commissioned.  Upgrades for improved control of humidity are underway.  Assembly of the Pre Electronics Module (PEM) for the first flight module is in progress. CDE Insertion into structure #1 ISSUES: None SCHEDULE: -17 day variance

GLAST LAT ProjectDOE/NASA Status Review, March 31 & April 1, Calorimeter Subsystem 9 Outstanding Issues  EMI/EMC performance  Design changes have been made to address EMI/EMC problems discovered in CAL EM testing.  Outstanding issues are –Shielding of CAL – TEM cable and box attach points. –Test specification – difficulty in separating CAL and TEM/PS performance issues. –Test configuration – identification of subsystem configuration which represents LAT environment, shielding, etc. First opportunity to close this issue is during testing of FMA.

GLAST LAT ProjectDOE/NASA Status Review, March 31 & April 1, Calorimeter Subsystem 10 CAL Risk Summary ID # Risk Rank Risk DescriptionRisk MitigationStatus CAL Low IF a problem is found in CAL AFEE board design, SMT manufacturing, testing, PEM assembly and qualification (due to late qualification) THEN redesign of AFEE boards will cause schedule slip. 1.Prototype of board layout was manufactured and hand assembled. Several minor layout changes are required for final flight. 2.First flight article will be assembled, tested and thermal cycled before release to assembly of remainder. Schedule issue, however. On Track CAL Low IF CAL ASICs fail qualification testing; THEN the flight CAL AFEE boards in build will be impacted causing schedule impact and loss of flight parts. Boards will be assembled in three lots 1.1st article verification 2.lot of 6 modules 3.lot of 18 modules the assembly of which will not occur until qualification testing is complete. On Track CAL Moderate IF CAL problem is found during production; THEN multiple flight units may be impacted due to schedule compression resulting in schedule impact. 1.Verify production processes during EM program 2.Extensive EM environment test program On Track

GLAST LAT ProjectDOE/NASA Status Review, March 31 & April 1, Calorimeter Subsystem 11 Schedule Variances  Flight ASIC manufacture (-53 days)  Packaging of CAL ASICs took ~45 days longer than programmed due to vendor work load and priorities.  AFEE Printed Circuit Board (-24 days)  Testing of prototype flight PCB and mechanical verification has taken longer than programmed.  Implementation of layout modifications add additional EMI/EMC filtering, to improve potential mechanical interference issues and to improve reliability were not programmed.  Carbon Composite Structure (-17 days)  Materials problems and over test anomalies delayed the manufacture of the 1 st flight structure. BCWS: 14,632BCWP: 14,171SV: - 462BAC: 22,103

GLAST LAT ProjectDOE/NASA Status Review, March 31 & April 1, Calorimeter Subsystem 12 Path to first flight CAL Module (FMA) Dual PIN Photodiode NRL 12/03/03 CsI Crystals Sweden 08/13/03 Crystal Detector Elements (CDE) NRL/Swales 2/09/04 Carbon Composite Structure Al base, closeouts, plastic parts LLR/Ecole Polytechnique, NRL 03/11/04 (-35) Pre Electronics Module NRL 04/12/04 (-17) ASICs SLAC, NRL 03/22/04 (-53) Other EEE parts Parts Qual/Screen NRL 03/22/04 (-53) PCB NRL 03/15/04 (-24) Analog Front End Electronics (AFEE) NRL 04/29/04 (-24) CAL Module NRL 05/24/04 (-24) Calibration Environmental Test NRL 07/22/04 (-24) Ready for Integration (RFI) 08/12/04 (-24) [BL: 07/09/04] Completion Dates (variance to baseline) Critical Path in Red

GLAST LAT ProjectDOE/NASA Status Review, March 31 & April 1, Calorimeter Subsystem 13 Path to 16th flight CAL Module (FM14) Dual PIN Photodiode NRL 06/28/04 ( 0) CsI Crystals Sweden 05/05/04 (-45) Crystal Detector Elements (CDE) NRL/Swales 08/09/04 ( 0) Carbon Composite Structure Al base, closeouts, plastic parts LLR/Ecole Polytechnique, NRL 09/20/04 (-35) Pre Electronics Module NRL 10/06/04 (-27) ASICs SLAC, NRL 03/22/04 (-53) Other EEE parts Parts Qual/Screen NRL 04/20/04 (-50) PCB NRL 03/15/04 (-44) Analog Front End Electronics (AFEE) NRL 06/26/04 (-23) CAL Module NRL 11/09/04 (-24) Calibration Environmental Test NRL 12/08/04 (-22) Ready for Integration (RFI) 01/11/05 (-22) [BL: 12/02/04] Completion Dates (variance to baseline) Critical Path in Red

GLAST LAT ProjectDOE/NASA Status Review, March 31 & April 1, Calorimeter Subsystem 14 Cost Summary Baseline, November 03$22,648K Changes: CDE Manuf. Develop. Savings$ (546K) Baseline, February 04$22,103K Approved Cost Changes since Rebaseline

GLAST LAT ProjectDOE/NASA Status Review, March 31 & April 1, Calorimeter Subsystem 15 Cost Variance Cumulative Cost Variance: + $640K  Mgmt, Sys Eng, R&QA: +$259K (6%)  Understaffed (60%)  Travel underrun (40%)  Crystal Detector Elements: +$27K (1%)  PreElectronics Module: +$168K (18%)  Invoicing for delivered material and outstanding commitments  Analog Electronics: +$3K (0%)  Module Assembly and Test: +$161K (9%)  Invoicing for facilities and GSE

GLAST LAT ProjectDOE/NASA Status Review, March 31 & April 1, Calorimeter Subsystem 16 Cost Liens Additional duration for Thermal Vacuum Testing  EM Test experience indicated that CAL temperature changes can not be driven as quickly as estimated in baseline: 3 days per cycle rather than baseline 2 days.  Additional TVAC operation time and supporting staff is ~$30K per TVAC. This affects 8 of the 9 TVACs.  Cost increase is partially mitigated by the removal of requirement for 12 cycles of TVAC for FMA/B. This recovers $111K.  Net cost estimate is ~ $130K. Approximately 50K of this is in FY04.

GLAST LAT ProjectDOE/NASA Status Review, March 31 & April 1, Calorimeter Subsystem 17 Next 6 months By Oct 1, 2004  Crystal Detector Elements  All CsI crystals delivered from Sweden (by August)  All CDE manufactured and tested (~1850 by Sept)  Pre Electronics Modules  17 of 18 structures delivered to NRL from IN2P3/LLR  15 of 18 PEMs completely assembled and tested.  Analog Front End Electronics  All AFEE circuit cards assembled and tested.  Module Assembly and Test  11 of 18 Modules completely assembled and in test.  6 of 18 Modules delivered to SLAC.

GLAST LAT ProjectDOE/NASA Status Review, March 31 & April 1, Calorimeter Subsystem 18 Summary  CAL design and technical issues are well in hand  EM module verified design and assembly processes. Lessons learned incorporated in flight production.  EM subjected to qualification level environmental test program. No problems.  CAL is well into flight module production  All flight hardware drawings are released.  Electronics assembly and test continue to define the critical path to the delivery of the first modules. –Flight parts availability and qualification continue to present schedule vs risk challenges.  The CAL schedule is aggressive  Delivery of 1 st two modules in August will be a significant challenge.

GLAST LAT ProjectDOE/NASA Status Review, March 31 & April 1, Calorimeter Subsystem 19 Backup Material Overview Gamma-ray Large Area Space Telescope

GLAST LAT ProjectDOE/NASA Status Review, March 31 & April 1, Calorimeter Subsystem 20 Modular Design 4 x 4 Array of Calorimeter Modules LAT GRID with 16 CAL Modules CAL Module with TEM and Power Supply mounted to base plate

GLAST LAT ProjectDOE/NASA Status Review, March 31 & April 1, Calorimeter Subsystem 21 CAL Module  Electronics boards attached to each side  Interface connectors to TEM at base of calorimeter  Outer wall is EMI shield and provides structural stiffness as well CDE: CsI Detectors + PIN diodes (both ends) Readout Electronics Carbon Cell Array Al Cell Closeout Al EMI Shield Mounting Baseplate  8 layers of 12 CsI(Tl) crystals  Crystal dimensions –27 x 20 x 326 mm  Hodoscopic stacking –alternating orthogonal layers  Dual PIN photodiode on each end of crystals  Mechanical packaging  Carbon Composite cell structure  Al base plate and side cell closeouts

GLAST LAT ProjectDOE/NASA Status Review, March 31 & April 1, Calorimeter Subsystem 22 Calorimeter Assembly Flow Crystal Detector Element (CDE) Assembly NRL PIN Diode (each end) CsI Crystal Optical Wrap Wire leads Mechanical Structure France / NRL Front-End Electronics NRL, SLAC PreElectronics Module (PEM) Assembly NRL Module Assembly and Test, NRL+collab 16 Flight modules + 2 Spare Bond End Cap Dual PIN Diodes (DPD) NRL CsI Crystals Sweden (KTH)

GLAST LAT ProjectDOE/NASA Status Review, March 31 & April 1, Calorimeter Subsystem 23 Environmental Test Flow

GLAST LAT ProjectDOE/NASA Status Review, March 31 & April 1, Calorimeter Subsystem 24 CAL Hardware Collaborators