BlueVisoins Management Pty Ltd

Slides:



Advertisements
Similar presentations
COST CONTROL - EARNED VALUE 1.0. EARNED VALUE - INTRODUCTION
Advertisements

©2003 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
 Costs are planned, measured, analyzed and controlled in terms of project activities.  Expenditure for any activity is incurred evenly over the duration.
University of Sunderland ENGM91 Unit 6 ENGM91 Project Execution Unit 6.
1 Copyright 2007 blueVisions Management Pty Ltd Project Performance Measurement Approach In Road Construction Industry Using EVPM
Monitoring and Control Earned Value Management (EVM)
CSSE Oct.2008 Monitoring and reporting project status Chapter 10, pages
Irwin/McGraw-Hill ©The McGraw-Hill Companies, 2000 Chapter 13 Progress and Performance Measurement and Evaluation.
Chapter 10: Monitoring and Controlling Change
Monitoring and Controlling
Gantt Charts Trisha Cummings. The History Henry Laurence Gantt's legacy to management is the Gantt chart. Henry Laurence Gantt ( ) was a mechanical.
Project Evaluation and Control
Project Evaluation and Control Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall.
Progress and Performance Measurement and Evaluation CHAPTER THIRTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 10 Project Monitoring and Control
Project Management Software Tools Cheryl A. Wilhelmsen Lee Ostrom.
Cost Management Week 6-7 Learning Objectives
Project Management 6e..
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
9-1 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e CHAPTER 9 Progress and Performance.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Project Monitoring and Control. Monitoring – collecting, recording, and reporting information concerning project performance that project manger and others.
Project Management Methodology Project monitoring and control.
Progress and Performance Measurement and Evaluation CHAPTER THIRTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 13: Progress and Performance Measurement and Evaluation
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall o P.I.I.M.T o American University of Leadership Ahmed Hanane, MBA, Eng, CMA, Partner.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall13-1 Project Evaluation and Control Project Termination and Closeout Chapter
Conducted By: Dr. Madhu Fernando, PMP, DBA, MEng. MGT PROJECT MANAGEMENT LESSON 5 AND 6: PROJECT PLANNING – TIME AND COST PLANNING AND MANAGEMENT.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Chapter 15 Cost Control.
Software Project Management (SPM)
EARNED VALUE MANAGEMENT (EVM)
10/19/ :26 AM 1 Project Cost Control. 10/19/ :26 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Earned Value SOS section Sp8Jan24ev3. Earned Value Analysis One approach to measuring progress in a software project is to calculate how much.
Earned Value management This presentation is just a short introduction to a few terms and concepts. I am sure there will be training sessions in the next.
Project Management Part 6 Project Control. Part 6 - Project Control2 Topic Outline: Project Control Project control steps Measuring and monitoring system.
1 Project Management – Unit 4 – Part 1 Cost Model ACWP: Actual cost of work performed: Actual costs in performing the work so far. BCWP: Budgeted cost.
1 Lecture 4.3b: Earned Value as the Cost and Schedule Metric (SEF Ch 14) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
Project Cost Con trol. 1.To identify those work types having excessive costs and to give an indication of how serious those overruns are. 2.To forecast.
Management & Development of Complex Projects Course Code MS Project Management Earned Value Concepts Lecture # 19.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Day 23.
Project Cost Management
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall13-1 Project Evaluation and Control Chapter 13.
UU Master Class Earned Value 17 July Earned Value Contents What is Earned Value / Earned Value Analysis Why and where is it used A brief history.
EARNED VALUE MANAGEMENT (EVM) TUTORIALS
1 Earned value analysis Planned value (PV) or Budgeted cost of work scheduled (BCWS) – original estimate of the effort/cost to complete a task (compare.
Information Technology Project Management, Six th Edition Kathy Schwalbe Copyright Disampaikan Oleh : Wiwid Dolianto S.Kom, MT Universitas Muhammadiyah.
EVM – Do You Really Know What the Numbers Mean? Booz | Allen |Hamilton Seth Huckabee EVP, PMP, PMI-SP.
1 Understanding Earned Value in Under an Hour Breakout Session # A11 Name: Wayne Brantley, MS Ed, PMP, ITIL Senior Director of Professional Education.
EARNED VALUE  Earned Value Management Systems  Earned Value Analysis.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Project Cost Con trol. 1.To identify those work types having excessive costs and to give an indication of how serious those overruns are. 2.To forecast.
Agenda ‒ Cost Management ‒ Cost Budgeting ‒ Cost Control Learning Goals 1.Cost Control 2.Earned Value Management.
Project Management 1 Project Control. Project Management 2 Topics Project Control Status Reporting Earned Value Analysis.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Measuring Progress HNC Project Management. Measuring Schedule Performance Break project tasks up into small work units. Work units that are too large.
TOPIC-8B- PROJECT COST CONTROL
PROJECT MANAGEMENT AND CONTROL
CHAPTER:7 Project Cost Management
Earned Value Management
Project evaluation and control
BlueVisoins Management Pty Ltd
Implementing EV in IT A Three Step Approach John Chapman Touchstone Ltd
Earned Value Measures Planned Value (PV) Earned Value (EV)
ENGINEERING MANAGEMENT (GE 404)
فرآيند كنترل پروژه.
Project Evaluation and Control
Monitoring and Controlling
Project Evaluation and Control
Presentation transcript:

BlueVisoins Management Pty Ltd 17 April 2017 Assessing the Performance of Road Construction Projects: The Practical Application of EVPM Method (Case Study) Pedram Daneshmand; pedramd@bluevisions.com.au Adel Khreich; adelk@bluevisions.com.au 7-10 October 2007, Hobart Copyright 2007 blueVisions Management Pty Ltd Project Risk Management Training

BlueVisoins Management Pty Ltd 17 April 2017 Introduction Project Monitoring & Control Ideal Control System Main Elements: Cost, Time, Quality and Safety Techniques: Leading parameter Activity based ratios Variances Earned Value Performance Measurement (EVPM) Copyright 2007 blueVisions Management Pty Ltd Project Risk Management Training

BlueVisoins Management Pty Ltd 17 April 2017 Ideal Control System Example: Construction of a bridge Budget: $10’000’000 Project Duration: 1 year After 6 months, we have received an invoice of $5’000’000. The question is how much job really done? More accurate answer, better Control System Copyright 2007 blueVisions Management Pty Ltd Project Risk Management Training

BlueVisoins Management Pty Ltd 17 April 2017 EVPM Background Industrial base – at the turn of the 20th century US - Department of Defence Idea took root in 1960’s C/SCSC (35 criterions) in 1967 Emerged as a PM tool in the early 1990’s Copyright 2007 blueVisions Management Pty Ltd Project Risk Management Training

BlueVisoins Management Pty Ltd 17 April 2017 EVPM Process Decompose the WBS Assign responsibility Planning/Scheduling Develop time-phased budget Objective measures of performance Set the performance baseline Monitor & Report and Take Action Copyright 2007 blueVisions Management Pty Ltd Project Risk Management Training

Case Study – NWT-Way, Sydney, Australia BlueVisoins Management Pty Ltd 17 April 2017 Case Study – NWT-Way, Sydney, Australia Bus rapid transit line A$500M D&C project Feb 04 to Dec 07 24 Km 30 Stations 7 Bridges 1 Underpass Cycleway, pedestrian facilities Copyright 2007 blueVisions Management Pty Ltd Project Risk Management Training

Case Study – NWT-Way, Sydney, Australia BlueVisoins Management Pty Ltd 17 April 2017 Case Study – NWT-Way, Sydney, Australia Copyright 2007 blueVisions Management Pty Ltd Project Risk Management Training

Case Study – NWT-Way, Sydney, Australia BlueVisoins Management Pty Ltd 17 April 2017 Case Study – NWT-Way, Sydney, Australia Copyright 2007 blueVisions Management Pty Ltd Project Risk Management Training

BlueVisoins Management Pty Ltd 17 April 2017 1 – WBS & Work Packages L1 L2 L3 L4 L5 Copyright 2007 blueVisions Management Pty Ltd Project Risk Management Training

2 – Budget Cost Allocation BlueVisoins Management Pty Ltd 17 April 2017 2 – Budget Cost Allocation Locate the 4th or 5th level of WBS. Get the direct cost info. Allocate costs over each Work Package. Allocate the linear relationship or a more accurate non-linear expenditure against time. Copyright 2007 blueVisions Management Pty Ltd Project Risk Management Training

3 – Schedule & Plan Value (PV) BlueVisoins Management Pty Ltd 17 April 2017 3 – Schedule & Plan Value (PV) Prepare your schedule plan using CPM Locate the WP’s within the schedule Allocate the costs to WP’s Create the S-Curve, PV or BCWS Do resource levelling Check the financing plan Finalise the PV curve Copyright 2007 blueVisions Management Pty Ltd Project Risk Management Training

3 – PV for Contract Programmes BlueVisoins Management Pty Ltd 17 April 2017 3 – PV for Contract Programmes Planned start and expected finish dates Significant project milestones Top driven from the high level milestones Progressing from the lower level activities NO change at Baseline Milestones will be the principal method through which logical links are made between discrete groups of work packages. Copyright 2007 blueVisions Management Pty Ltd Project Risk Management Training

3 – PV for Target Programmes BlueVisoins Management Pty Ltd 17 April 2017 3 – PV for Target Programmes Same as Contract programme, less a contingency for lost time due to weather, industrial and other delays. The difference between the Target and Contract programme is FLOAT. Copyright 2007 blueVisions Management Pty Ltd Project Risk Management Training

Plan Value (PV) Copyright 2007 blueVisions Management Pty Ltd

4 – Progress Monitoring/Updating BlueVisoins Management Pty Ltd 17 April 2017 4 – Progress Monitoring/Updating Schedule updating Fortnightly with: Actual Start & Finish dates Revised Start & Finish dates Revised Duration Updated Incomplete activities and Milestones 0-100; 50-50; 25-75; and 33-67 Level of Effort (LOE) Percent Complete Copyright 2007 blueVisions Management Pty Ltd Project Risk Management Training

4 – Progress Monitoring/Updating BlueVisoins Management Pty Ltd 17 April 2017 4 – Progress Monitoring/Updating Cost updating Monthly with: Claim Costs Site Actual Costs (AC) or ACWP Copyright 2007 blueVisions Management Pty Ltd Project Risk Management Training

BlueVisoins Management Pty Ltd 17 April 2017 5 – EVPM calculation EV(BCWP) = % Comp x PV(BCWS) Schedule Variance (SV) = EV – PV Cost Variance (CV) = EV – AC SPI = EV / PV CPI = EV / AC PCP = PV / Total Budget PCA = EV / Total Budget EAC = AC + ETC Copyright 2007 blueVisions Management Pty Ltd Project Risk Management Training

6 – Data Analysis & Progress Report BlueVisoins Management Pty Ltd 17 April 2017 6 – Data Analysis & Progress Report Summary Programme Progress Report Critical Path Investigation Design Progress Report Construction Progress Report Earned Value (EV) Progress Report Schedule/Cost Variance Progress Report Cash Flow Report Copyright 2007 blueVisions Management Pty Ltd Project Risk Management Training

6a – Programme Progress Report BlueVisoins Management Pty Ltd 17 April 2017 6a – Programme Progress Report Cumulative Progress Monthly Progress Description Planned Actual* Variance   Zone 1: Design Status (%) = 100% 0% 0.0% Construction Status (%) = Zone 2: Zone 3: 77.4% 86.9% 9.5% 3.9% 3.5% 0.4% Zone 4: 67.2% 70.1% 2.9% 9.3% 7.1% 2.2% TOTAL: 85.7% 88.7% 3.0% 2.8% 0.7% TOTAL Project Status (%) = 86.8% 89.5% 2.7% 3.1% 2.6% 0.5% Copyright 2007 blueVisions Management Pty Ltd Project Risk Management Training

6b – Critical Path Investigation BlueVisoins Management Pty Ltd 17 April 2017 6b – Critical Path Investigation Copyright 2007 blueVisions Management Pty Ltd Project Risk Management Training

6c – Design Progress Report BlueVisoins Management Pty Ltd 17 April 2017 6c – Design Progress Report Copyright 2007 blueVisions Management Pty Ltd Project Risk Management Training

6d – Construction Progress Report BlueVisoins Management Pty Ltd 17 April 2017 6d – Construction Progress Report Copyright 2007 blueVisions Management Pty Ltd Project Risk Management Training

6e – Earned Value Progress Report BlueVisoins Management Pty Ltd 17 April 2017 6e – Earned Value Progress Report Copyright 2007 blueVisions Management Pty Ltd Project Risk Management Training

6f – S/C Variance Progress Report BlueVisoins Management Pty Ltd 17 April 2017 6f – S/C Variance Progress Report Copyright 2007 blueVisions Management Pty Ltd Project Risk Management Training

BlueVisoins Management Pty Ltd 17 April 2017 6g – Cash Flow Report Copyright 2007 blueVisions Management Pty Ltd Project Risk Management Training

BlueVisoins Management Pty Ltd 17 April 2017 Conclusion EVPM is a good tool for improving the analysis of progress and performance on a construction project. Although level 4th WP’s give accurate results, site engineers feel more confident at 5th level. General overheads and profits should be eliminated from the analysis so that actual expenditure can be directly compared with budgeted expenditure. Within this closed network, activities are updated with time data and WP’s updated with cost info. The test data needs to be expanded with data from a wider range of road projects to provide more practical usages and procedures of EVPM system. Getting the accurate cost figures from financial dept and the real time and performance data from site engineers, makes the EVPM system a reliable performance measurement tool. Copyright 2007 blueVisions Management Pty Ltd Project Risk Management Training

BlueVisoins Management Pty Ltd 17 April 2017 Acknowledgment Consulting services was undertaken and fully supported by: Blue Visions Management Pty Ltd (BVM), Sydney, Australia. Database support has been provided by: Leighton Contractors Pty Ltd (LCPL), Australia. Copyright 2007 blueVisions Management Pty Ltd Project Risk Management Training

BlueVisoins Management Pty Ltd 17 April 2017 THANK YOU Copyright 2007 blueVisions Management Pty Ltd Project Risk Management Training