EPIC TTD#14 SCIENCE OPERATIONS Mallorca, 01 February 2005 L. Metcalfe SCI-SDX Science Support Manager 1 Science Operations & Data Systems Division Research.

Slides:



Advertisements
Similar presentations
XMM-Newton 1 Matthias Ehle - SCI-OAX EPIC BGWG Meeting#6 November 5 th, 2007 BGWG Report from the June XMM-Newton User Group Meeting Matthias Ehle.
Advertisements

XMM EPIC MOS Jenny Carter 4 th EPIC BG WG Meeting Mallorca, 25/10/06 BGWG blank sky data analysis Jenny Carter, University of Leicester.
WORK PLAN FOR THE EPIC CALIBRATION TEAM (AND BEYOND)
Chandra X-Ray Observatory CXC Paul Plucinsky EPIC Cal April ACIS Calibration: Recent Updates, Planned Updates, & Future Issues 2.E0102: Joint.
Bruno Altieri EPIC Calibration meeting, Feb. 1-3, 2005 European Space Astronomy Centre Page 1 XMM-Newton ESAC Status of XMM-Newton cross-calibration with.
XMM 1 EPIC MOS Monitoring CAL/OPS Meeting MPE
25 Jan 2005CUC Meeting CXC-Sponsored Workshops & Symposia Paul Green For the Chandra Directors Office.
XMM-Newton 1 Maria Santos-Lleo Science Operations Status EPIC Ops-Cal Meeting November 6, 2007, Mallorca María Santos-Lleó (XMM-Newton Science Support.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC The XMM-Newton cross-calibration.
Chandra Users’ Committee, Oct 2009 Chandra Director’s Office Cycle 11 Peer Review Proposal Numbers:  668 submitted proposals  *5.6 oversubscribed.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Palermo, April 2007.
European Space Astronomy Centre Villafranca del Castillo, Madrid, Spain A.M.T. Pollock XMM-Newton SOC EPIC calibration October 2006 Calibration of.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Marcus G. F. Kirsch Mallorca, Summary status of the EPIC calibration.
EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 EPIC pn at low energies: LW mode Properties of EPIC pn at low energies: LW mode.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton MOS Timing Mode calibration Marcus.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Calibration of the EPIC MOS Timing.
XMM-Newton 1SCI-SA Populating the CCF Immediate needs are driven by the requirement to test the SAS over the summer before public release. (A release called.
Chandra Calibration Status  Recent releases  Current Calibration projects  Cross-Calibration between Chandra and other X-ray telescopes  Revisions.
XMM-Newton 1 M.Stuhlinger/P.Calderon, ESAC Re-appearance of the MOS1 CCD1 meteorite column during revs Madrid, 23. March 2010.
Energy Calibration using SNRs: preliminary results Andrea Tiengo INAF, IASF-Milano Mallorca, 6 November 2007 EPIC Calibration Meeting.
XMM-Newton 1SCI-SA Status of MOS and PN Realtime Operations 1) Current Operations Status 2) Eclipse preparation improvements 3) Slew Exposures 4) Offset.
MOS 3x3 mode slow slew survey Richard Saxton October 2006.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Results from the EPIC- Calibration-Workshop.
Chandra Users’ Committee, 6-7 Apr 2009 Chandra Director’s Office Cycle 11  CfP Release: Dec  POG, final A Eff : 15 Jan 2009  GTO: 43 proposals.
XMM-Newton 1 Maria Santos-Lleo Science Operations Status EPIC Ops-Cal Meeting April 8, 2008, Mallorca María Santos-Lleó (XMM-Newton Science Support Manager)
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton XMM Newton cross calibration M.G.F.
I. de la Calle Astronomy Science Operations Division Science Operations Department Background Working Group Meeting, Mallorca – 30/03/2009 XMM-Newton ESAC.
The EPIC-pn spectral response Frank Haberl EPIC Cal meeting, Tübingen, February 2003 Status of the pn spectral response in SAS5.4.1 Latest developments.
EPIC TTD#16 SCIENCE OPERATIONS MPE, 04 May 2006 L. Metcalfe SCI-SDX XMM-Newton Science Support Manager 1 Science Operations & Data Systems Division Research.
1 XMM-Newton Extended Source Analysis Software Steve Snowden & Kip Kuntz  Publicly Released 5 April 2006  XMM-Newton Extended Source Analysis Software.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Cross calibration PKS
Slews: Fast and Slow. Fast Slew Status  XMMSL1: catalogue of slew sources released May 2006 Revs , 5180 detections, 2692 Revs , 5180 detections,
XMM-Newton 1 I. de la Calle - SRE-OAX Background Working Group Meeting Madrid, March 22 nd 2010 SOC Activities Ignacio de la Calle.
EPIC Calibration Meeting, Mallorca K. Dennerl, 2006 October 26 Suppression of the low-energy noise Suppression of the low-energy noise: an improved approach.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, October 2006.
Martin Stuhlinger Mallorca, European Space Astronomy Centre Page 1 XMM-Newton ESAC Status of XMM-Newton cross-calibration with SASv7.1 CAL Meeting.
Mallorca, 1st of February 2005 Page 1 XMM-Newton Status of EPICs Operations Stéphane RIVES 1st of February 2005.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC XMM-Newton Instrument Anomaly Tool & Cross-Calibration Tool Marcus G. F. Kirsch.
Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.
Page 1 ACTIONS EPIC_10/1 on Munoz. EPIC_10/1 on Munoz. –Closed: MS delivered Slew Data Files  EPIC_10/2 on Smith: to verify whether PHS_tools checks for.
1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton Ops. AGENDA Operations status and.
Carlos Gabriel Science Operations & Data Systems Division Research & Scientific Support Department ADASS London 2007 XMM-Newton ESAC SAS Carlos.
Martin Stuhlinger X-Ray Universe 2005, Sep.26-30, 2005 European Space Astronomy Centre Page 1 XMM-Newton ESAC Status of XMM-Newton cross-calibration with.
GLAST LAT Project 1S. Ritz Purposes of the Data Challenges “End-to-end” testing of analysis software. –define the ends –define the tests (what is success?)
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Long term EPIC in-orbit calibration plan Marcus G. F. Kirsch.
Science Operations Status Maria Santos-Lleo EPIC cal & ops meeting, Madrid March, 2010.
RGS/MOS-cooling Results February 03, 2003 L. Metcalfe 1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton.
XMM EPIC MOS Andy Read OPS/CAL/BG (OCB) Meeting Mallorca, Spain 05-07/11/07 Report from the BGWG (05/11/07) Andy Read, on behalf.
1 XMM-Newton Extended Source Analysis Software Steve Snowden & Kip Kuntz  Publicly Released 5 April 2006  XMM-Newton Extended Source Analysis Software.
EPIC Calibration Meeting, Madrid Correcting spatial inhomogeneities of the absolute energy scale K. Dennerl, 2010 March 23 Correcting spatial inhomogeneities.
RAS National Astronomy Meeting April 2006, University of Leicester, UK The XMM-Newton Slew Survey The excellent sensitivity of the XMM-Newton.
SAG+SASWG Meeting Potsdam /15 PN Tasks – Status Report (update since Leicester) Hermann Brunner - MPE  epframes:  The dark quadrant problem.
April , 2006 HEASARC Users Group Steve Drake RXTE Archive at HEASARC Status and Plans Steve Drake.
06-1L Suzaku Suzaku UG - 13 Dec, 2007 Suzaku processing and archive Lorella Angelini/HEASARC.
The GLAST Science Support Center’s Role in Supporting the User Community [24.10] Thomas E. Stephens (GSFC/L-3GSI) for the GLAST Science Support Center.
A look at XMM slew data Richard Saxton, Andrew Read, Michael Freyberg, Bruno Altieri, Puri Munuera.
The X-ray Universe September 2005, El Escorial, Madrid, Spain The XMM-Newton Slew Survey XMM-Newton Slew 1 (XMMSL1) Fig 1. Slew observation.
XMM 1Norbert Schartel Report From The Project Scientist Presentation for the XMM-Newton Users Group Meeting VI 19 th / 20 th May 2005 Norbert Schartel.
Toward the Senior Review Rob Petre. Senior Review proposal details Due March 12, 2008 Competing against: XMM, INTEGRAL, RXTE, Swift, Galex, WMAP, Spitzer.
M. Pilar Esquej, XMM-Newton European Space Astronomy Centre Page 1 Status of the XMM-Newton Slew Survey P. Esquej, R. Saxton, B. Altieri, A. Read, M. Freyberg,
XMM slew survey Richard Saxton 1, Andy Read 2, Pili Esquej 3, Michael Freyberg 3, Bruno Altieri 1 1. ESAC 2. University of Leicester 3. MPE XMM slew survey.
M. Pilar Esquej, XMM-Newton European Space Astronomy Centre Page 1 Status of the XMM-Newton Slew Survey P. Esquej, R. Saxton, B. Altieri, A. Read, M. Freyberg,
1 Fermi Gamma-ray Space Telescope Users Group Meeting 6 February 2009 Mission Status Update (since the phonecall) and Issues S. Ritz, J. McEnery.
The Slow Slew Survey Richard Saxton / Pedro Rodriguez November 2006.
GO Program: Past, Present & Future Koji Mukai Suzaku Guest Observer Facility.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Status of the EPIC calibration Presentation for XMM Newton UG 18 May 2006 Marcus.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, April 2008.
GLAST Science Support Center May 8, 2006 GUC Meeting AI#28. SAE Release Schedule David Band (GSSC/JCA-UMBC) Julie McEnery (GSFC)
XMM-Newton Users Group Meeting #6 Science Support ESAC, 19 th. / 20 th. May 2005 L. Metcalfe SCI-SDX 1 Science Operations & Data Systems Division Research.
Periodicity Search in X-ray data of RX J
Presentation transcript:

EPIC TTD#14 SCIENCE OPERATIONS Mallorca, 01 February 2005 L. Metcalfe SCI-SDX Science Support Manager 1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton

Meeting/Action Description ActioneeDue EPIC TTD-0013/1 Make SDF available to interested peopleBA EPIC-CAL-0011/5 Verify pn QE with the crabFH EPIC-CAL-0012/4 Provide VILSPA with a tool to check MOS JB data for "3 missing raws" feature EPIC-CAL-0012/5Provide VILSPA with new sequences withTA old BS EPIC-CAL-0013/1Put new MOS redistribution into DT SS EPIC-CAL-0013/4Change pn long term CTI in CCF MK EPIC-CAL-0013/5Implement CTI tuning functionality for pn RS eFF in CAL EPIC-CAL-0013/6Update pn CTI CCF for eFF CTI tuningMK EPIC-CAL-0013/7Enable the OAL the determine the PNRS offset maps (ODI) 2 Science Operations & Data Systems Division Research & Scientific Support Department Page 2 XMM-Newton OPEN ACTIONS

CONTENTS Significant dates and meetings Operations General Calibration Points Data Processing - SAS Data Processing - SSC XSA Miscellaneous 3 Science Operations & Data Systems Division Research & Scientific Support Department Page 3 XMM-Newton

SIGNIFICANT DATES AND MEETINGS 4 Science Operations & Data Systems Division Research & Scientific Support Department Page 4 XMM-Newton

SIGNIFICANT DATES AO4 Cycle: Call30 Aug.2004 Close Phase I08 Oct.2004 Open phase II for first PI group10 Jan.2005 Open phase II for second PI group 17 Jan.2005 Close phase II for first PI group21 Jan.2005 Open phase II for third PI group 24 Jan.2005 Planned maintenance (07:30z to 11:30z) 25 Jan.2005 Close phase II for second PI group 28 Jan.2005 Close phase II for third PI group 04 Feb.2005 Close XRPS11 Feb.2005

AO4  closed on the 8th of October 2004  657 valid proposals requesting, in total, ksec  AO4 covers one year with ksec observing time available ==>  over-subscription factor is 7.0  484 PIs from 23 countries, mostly ESA member states, USA & Japan  n-countries increases to 35 if co-investigators are considered  about 1600 individual scientists involved

SIGNIFICANT DATES (contd.) Users Group meeting #502/03Jun.2004 XMM-Newton 5-years in flight10 Dec.2004  all Calls over-subscription by x7 or more  >700 refereed papers EPIC CAL/OPS Mallorca01-03Feb.2005 Cross-calibration Workshop at ESAC 16-18Mar.2005 EPIC Consortium Schloss Ringberg10-13Apr.2005 Users Group Meeting #619/20May2005 The X-ray Universe 2005, El Escorial 26-30Sep.2005 ADASS, El Escorial 03-07Oct.2005 NB: An annular eclipse of the Sun will take place at Madrid at the interface between these last two conferences.

XMM-NEWTON USERS GROUP (19/20 May.2005) AT THAT MEETING WE KNOW WE MUST SHOW :  decisive progress in the calibration  cook-book for doing science with EPIC at < 1 keV  Cross-calibration status document OTHER ITEMS DEMANDED BY UG :  get RGS background accumulator into SAS done  pursue 2005 Conference - done  report on slew survey at next UG meeting - in progress  get RGS Superfluxer into SAS in progress  pursue EPIC background modeling as next priority

Conference Aims and Scope The XMM-Newton and Chandra space observatories have operated for half a decade & continue to provide superb data which is changing our view of almost every aspect of the Universe at high E. In the near future AstroE-2 will provide enhanced capabilities for high res. spectroscopy, & Swift will soon join HETE-2 in making detailed studies of gamma-ray bursts. Significant new insights are also emerging from Integral's view of the sky at hard X-ray & gamma-ray energies. "The X-ray Universe 2005" symposium will showcase the results and discoveries from current and near-future missions and provide a forum for the discussion of astrophysical themes with a high-energy connection. Scheduled to last for 5 days & embrace the wide range of astrophysics in which XMM-Newton, Chandra & other missions are making important advances. Session topics will include: * stars, stellar systems, planetary & cometary studies * interacting binary systems, SNR, pulsars * the ISM and diffuse Galactic emission * AGN, galaxies, clusters of galaxies * surveys, population studies and the cosmic X-ray background * gamma-ray bursts

OPERATIONS 10 Science Operations & Data Systems Division Research & Scientific Support Department Page 10 XMM-Newton

11 Science Operations & Data Systems Division Research & Scientific Support Department Page 11 XMM-Newton

12 Science Operations & Data Systems Division Research & Scientific Support Department Page 12 XMM-Newton

13 Science Operations & Data Systems Division Research & Scientific Support Department Page 13 XMM-Newton

14 Science Operations & Data Systems Division Research & Scientific Support Department Page 14 XMM-Newton

15 Science Operations & Data Systems Division Research & Scientific Support Department Page 15 XMM-Newton

16 Science Operations & Data Systems Division Research & Scientific Support Department Page 16 XMM-Newton

17 Science Operations & Data Systems Division Research & Scientific Support Department Page 17 XMM-Newton

18 Science Operations & Data Systems Division Research & Scientific Support Department Page 18 XMM-Newton

OPERATIONS  SUPPORT TO OTHER MISSIONS (LEOPs etc.) ROSETTA EUTELSAT W3A SCOS 2000 tests on Rev.900, Rev.935, Rev.940 (all modes)  MAJOR SOLAR FLARE IN THE PAST WEEK in last hours of Rev.936 normal operations resumed on rev.939 instruments mostly in safe mode any impacts TBD

GENERAL CALIBRATION POINTS CCFs released NRCOs 20 Science Operations & Data Systems Division Research & Scientific Support Department Page 20 XMM-Newton

CCF RELEASE NOTES IN PERIOD XMM-CCF-REL-166 EPIC MOS Metrology 13May2004 XMM-CCF-REL-167 PSF of the X-ray telescopes 19May2004 XMM-CCF-REL-168 EPIC absolute astrometry 21May2004 XMM-CCF-REL-169 EPIC MOS low energy response & QE05Aug2004 XMM-CCF-REL-170 MOS Filter Transmission14Jun2004 XMM-CCF-REL-171 RGS Instrumental Flourine Absorption24Jun2004 XMM-CCF-REL-172 Improving pn Window mode CTI correction 19Jul2004 & refining long term CTI corr. all pn Modes XMM-CCF-REL-173 RGS DARKFRAME normalisation 19Jul2004 XMM-CCF-REL-174 pn telescope effective area modification 09Jun2004 XMM-CCF-REL-175 EPIC PN Bad Pixels05Jul2004 XMM-CCF-REL-176 RGS QE Shortest Corr. Factors27Jul2004 XMM-CCF-REL-177 Low-E noise rejection refinement for pn15Sep2004 XMM-CCF-REL-178 Masking MOS bright patches: MOS1 CCD4 14Sep2004 XMM-CCF-REL-179 RGS Background Spectral Templates 15Oct2004 XMM-CCF-REL-180 EPIC PN masked mode parameters15Oct2004 XMM-CCF-REL-181 EPIC MOS fixed offset29Oct2004 XMM-CCF-REL-182 Ecorr for Extended Full Frame mode12Nov2004 XMM-CCF-REL-183 EPIC-pn spectral response11Nov2004 XMM-CCF-REL-184 EPIC MOS response10Dec2004

NRCOs 34 Refinement of pn-CTI correction 35 EPIC soft-energy X-cal. on GD 153 Uncommissioned 36 XMM-Newton cross-calibration on H Use of a single RGS2 ADC Uncommissioned 38 4 pointing raster on 1ES The absolute Flux calibration of OM 40 The OM UV red leaks 41 Sanity check of MOS filters Uncommissioned 42 HZ 43 XMM/Swift cross-calibration 43 H XMM/Swift cross-calibration 44 Rejected: PKS XMM/Swift cross-calibration 45 HZ 43 XMM/Swift cross-calibration

DATA PROCESSING - SAS 23 Science Operations & Data Systems Division Research & Scientific Support Department Page 23 XMM-Newton

SAS  Version of the Science Analysis System (SAS) releasedMarch ‘04  4th VILSPA SAS Workshop June 8 to 11 ‘04  Version of the Science Analysis System (SAS) released01 Dec.’04  RGS background modelling capability  an upgrade of the OM grism data analysis  new, experimental, treatment of Time Correlation  Next public release will be when we gain confidence with the SAS version currently under test for the bulk-reprocessing

DATA PROCESSING - SSC 25 Science Operations & Data Systems Division Research & Scientific Support Department Page 25 XMM-Newton

STATUS OF DATA GENERATION Routine Phase statistics: As of mid-January 2005 … Scheduled (revs )4013 Performed3834 ODFs produced3759 PPS products Science Operations & Data Systems Division Research & Scientific Support Department Page 26 XMM-Newton

27 Science Operations & Data Systems Division Research & Scientific Support Department Page 27 XMM-Newton Turn-around time between data acquisition and data notification to GO (PIPE) as of 31-Dec-2003

28 Science Operations & Data Systems Division Research & Scientific Support Department Page 28 XMM-Newton

XSA 29 Science Operations & Data Systems Division Research & Scientific Support Department Page 29 XMM-Newton

XSA Data processing facilities in the XMM-Newton Science Archive (XSA) XSA v2.7 released November 2004 full suite of data proc. facilities can be triggered from XSA user interface  latest public SAS reprocessing of raw telemetry (ODF) for all XMM-Newton cameras through meta-tasks ("emproc", "epproc", "rgsproc", "omichain", "omfchain")  ftp retrieval of products  filtering of EPIC calibrated and concatenated event lists prior to retrieval  interactive extraction of spectra and light curves from sky regions in EPIC exposure images in the XSA FITS viewer tool  response matrices generated, & spectral products.  users can now monitor download or processing status through "Request Monitor" tool

MISCELLANEOUS PUBLICATIONS OTHER ( RGS ADC … ) 31 Science Operations & Data Systems Division Research & Scientific Support Department Page 31 XMM-Newton

32 Science Operations & Data Systems Division Research & Scientific Support Department Page 32 XMM-Newton

33 Science Operations & Data Systems Division Research & Scientific Support Department Page 33 XMM-Newton