MICE Absorber Test Cryostat Plan-II S. Ishimoto KEK MICE-AFC Phone Meeting, Aug-27, ‘04.

Slides:



Advertisements
Similar presentations
Absorber R&D and Instrumentation MICE Meeting at FNAL, Jun 8-11, 2006 Shigeru Ishimoto KEK and MICE Japan “Sakuraso” Japanese Primula and Green House.
Advertisements

1 AFSWG Mtg 15 Aug 2003 Elwyn Baynham RAL Safety Overview Work done by RAL Group Contributors Elwyn Baynham Tom Bradshaw Iouri Ivaniouchenkov.
Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
Liquid Hydrogen Absorber
Photo KEK March-28, 2002 MICE Absorber and Test Cryostat Shigeru Ishimoto (KEK) Shoji Suzuki (KEK) Edgar Black (IIT) Mary Anne Cummings (NIU) (1) MICE.
Cooling Channel Count Recap Cooling channel components # Engineering? Absorber: temperature 8*3 yes pressure 2*3 yes He temp 2*3 level 8*3 yes length (optical)
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
Absorber R&D and Test Results CM16 at RAL, Oct 8-11, 2006 Shoji Suzuki & Shigeru Ishimoto KEK.
MICE Absorber cryostat Forces and power dissipation - for normal operation and during a magnet quench Elwyn Baynham James Rochford MICE Meeting November.
Agreement on scope of supply and extent of interface among different suppliers of the AFC module This talk covers the scope of supply on the Absorber Focus.
1 Status of Hydrogen System Development MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov, Tom Bradshaw, Elwyn Baynham, Mike Courthold,
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
Cryo and AFE IIt Update MICE Collaboration Meeting October 22, 2005 RAL A. Bross.
MICE LH2 Operating Parameters Mary Anne Cummings MICE October ‘02 LBL Oct. 24, 2002.
MICE Magnetic forces James Rochford Elwyn Baynham AFC working group meeting RAL 23 April 2004.
1 MICE hydrogen system layout. 2 MICE hydrogen system layout (2)
Absorber/vacuum windows and absorber assembly 1.Window Requirements 2.MICE experimental constraints 3.Welded vs. non-welded windows 4.Installation 5.Testing.
Nov-1st 2004, MICE TV Conf. Plans for absorber tests at KEK Shigeru Ishimoto KEK.
Flammable Gas Electrical Safety Concerns for detectors: Power per channel Feedthroughs Seals.
Background to the current problem 1. As a result of the high stresses in the bobbin due to the magnet load, the bobbin end plate needs to be increased.
Μ-beam Absorber 1Absorber 2Absorber 3RF 1RF 2 Vacuum LH2 Warm window Windows in MICE: Option 1 (as currently designed) ISIS Safety officer’s comment: If.
MICE Absorber and Test Cryostat Shigeru Ishimoto KEK MICE AFC Module Phone Conference (March 12, 2004) (1) MICE Absorber Test Process (2) MICE Absorber.
LH2 Absorber Heat Load and Homeostasis. What has happened before… 1.Huge LH2 volumes, low heat deposition: Bubble chambers 2.Small LH2 volumes, low heat.
MICE LH2 ABSORBER BODY Shigeru ISHIMOTO KEK OCT Non-Welding Bolt-Type Absorber.
MICE collaboration meeting RAL 28 October 2004 Absorber R & D Plan by Wing Lau – Oxford University.
MICE absorber and Window / flow Design Wing Lau, Giles Barr & Stephanie Yang Oxford University MICE Meeting Berkeley, Oct 2002.
bobbin Thermal radiation shield Magnet cryostat Large End Flange The leading dimensions.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module progress update Wing Lau – Oxford.
Absorber Design Details Mary Anne Cummings MICE MEETING Columbia June 13, 2003.
May 12, 2004 TJR1 Effects of Downstream Iron Shield Position on MICE Good- Mu+ Rates Tom Roberts Illinois Institute of Technology May 12, 2004.
May 12, 2004 TJR1 Effects of Upstream ParticleID Counters on MICE Good-Mu+ Rates Tom Roberts Illinois Institute of Technology May 12, 2004.
Liquid-hydrogen absorber: Shigeru Ishimoto KEK Contents (1)Introduction (2)MICE absorber design (3)Prototype absorber test at KEK (4)MICE absorber instrumentation.
MICE Hydrogen Control System MICE H2 Review Meeting RAL 15 th Jan 2015 PJ Warburton – STFC Daresbury Lab.
17 March 2005Edda Gschwendtner1 MICE Cooling Channel: Can we predict cooling to ? Edda Gschwendtner Challenge Systematics Cooling Channel Beam Line.
Cryogenics Science Center/KEK (Nobuhiro KIMURA –20/April./2010 at ATF2 meeting ) 1 Resent Progress at KEK N. KIMURA, T. TOMARU, Y. AJIMA, T. KUME, A. YAMAMOTO,
Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT.
M. A. C. C. NFMCC UCLA Jan 31, 2007 LH2 Absorber Status Mary Anne Cummings NFMCC UCLA January 31, 2007 Muons, Inc.
MICE Coupling Coil Update Steve Virostek for Allan DeMello Lawrence Berkeley National Laboratory MICO January 23, 2013 January 23, 2013.
Absorber Production Status Contents (1)MICE absorber design/status (2)MICE absorber instrumentation (3)Schedule (4)Summary Sasanqua at KEK on 13-DEC,’09.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Hydrogen Pre-Operation Safety Review 4 th October 2011 Results from Helium Commissioning M Hills.
Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004.
Beaver Watching MICE meeting at FNAL Jun-08, 2006 Absorber Progress MICE VC Aug-16, 2006 Shigeru Ishimoto & Shoji Suzuki, KEK.
Engineering Summary Agenda: Clarification of cooling channel tolerances – Tim Open issues with absorber integration – Andy/Wing.
Issues with variable thickness absorbers Iouri Ivaniouchenkov, RAL MICE Video Conference, 22 Jan
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
MICE – MUON Interface meeting at Mission Inn, Riverside, California January , 2004 MICE Cooling Channel Integration Issues Wing Lau – Oxford & Steve.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
NFMCC Meeting 3/12/06 A. Bross LiH Absorbers Muon Cooling R&D NFMCC Meeting March 12, 2006 A. Bross.
Subjects for SC FF magnet system at ATF2 Infrastructures at ATF2? How supply cryogen at ATF2 (set up cryogenic system?) (Gas helium recovery line?) Set.
Progress on Absorber Heater and Instrumentation, Absorber R&D Shigeru Ishimoto KEK AFC Phone Meeting Jan-27, 2005.
1 Status of infrastructure MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
1 MICE absorbers work package MPB – 27/10/15 Mike Courthold Mark Tucker Phil Warburton Steve Watson.
-1- Steve Virostek (LBNL) and Li Wang (SINAP) Instrumentation for the MICE Coupling Coil Steve Virostek Lawrence Berkeley National Lab February.
MICE Prototype Coupling Coil Cooling Circuit Design Dan Cheng Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
1 MICE Coupling Coil Cryostating and Test Steve Gourlay March 1, Office of Science.
FC Status CM39 1/20 June 2014 OXFORDRALDARESBURY V. BlackmoreV. BaylissT. Hartnett J. CobbT. BradshawS. Griffiths W. LauM. CourtholdI. Mullacrane R. PreeceA.
Spokesman's update.
MICE Meeting at RAL, Oct-23, 2005
On the Ground Muon Ionisation Cooling Experiment ( MICE ) – pre-cursor to a neutrino factory.
MICE CM31 Schedule summary
Phone: + 40 (728) | +40 (733)
Status of Hydrogen System Development
Ашық сабақ 7 сынып Файлдар мен қапшықтар Сабақтың тақырыбы:
Windows басқару элементтері
Қош келдіңіздер!.
Budker Institute of Nuclear Physics,
Информатика пән мұғалімі : Аитова Карима.
For More Details:
Presentation transcript:

MICE Absorber Test Cryostat Plan-II S. Ishimoto KEK MICE-AFC Phone Meeting, Aug-27, ‘04

MICE Absorber Test Process KEK (1) Pressure Test at R.T. with Dummy Windows (2) Pressure Test by G-He at 20 K with Dummy Windows US/FNAL (3) Pressure Test at R.T. RAL (6) Pressure Test at R.T. (7) Cooling Test by G-He (8) Cooling Test by L-H2 KEK (or FNAL) (4) Pressure Test at R.T. with Windows (5) Pressure Test by G-He at 20K with Windows (2)&(5) Needs Test Cryostat at KEK (7)&(8) Needs Test Cryostat at RAL?

MICE Absorber (Latest Drawing)

L-H2 Level SensorStay Off Lines

MICE Absorber Test Cryostat (Plan-I) To order this cryostat, we have to fix the detail design of absorber & cryostat.

MICE Absorber Test Cryostat (Plan-II) Present  300 absorber test MICE absorber test Thermometer/level sensor calibration by Cryocooler (Absorber test with Cryocooler) Test Item

Plan-II with MICE Absorber

Plan-II with Present Absorber