Improving Practice in the Sector MAW connections to TRAC and activity costing Will Foster September 17 2009.

Slides:



Advertisements
Similar presentations
Subsidy measurement and classification: developing a common framework Workshop on Environmentally Harmful Subsidies, Paris, 7-8 November 2002 Ronald Steenblik.
Advertisements

Outcomes and impact of the Project at the Cape Peninsula University of Technology, and remaining challenges.
FINANCE Academic Workload Planning The Derby Experience Presented by John Hurd TRAC Manager.
Views on TRAC and the UWE workload model 12 th December 2013.
An Assessment Primer Fall 2007 Click here to begin.
AQIP Status Report An Overview and Discussion. Timeline for SJC’s AQIP Journey November 2000 AQIP admission 2002 First action projects submitted September.
Quality Assurance and ECTS at HEI in Serbia Prof. dr Vojin Rakić (BK University, Belgrade)
Implementing the new Workload Policy Heads of School Workshop April 2010.
National Association of Student Financial Aid Administrators Presents … © NASFAA Fall Training An Institutional Approach to Developing and Updating.
Grahame Cooper 1 The Salford University Technical System for its Workload Balancing Model Grahame S Cooper University of Salford.
Academic Workloads and TRAC Will Foster March
A Student Guide to Object- Orientated Development Chapter 2 Requirements for the Wheels case study system.
Taking forward ASYE in adult services October 2014.
2 nd September 2014 Sean White – Tourism Intelligence Unit (ONS) Measuring Tourism Locally in Northern Ireland.
Chief Learning Officer Webinar Sponsored by Skillsoft September 13, 2012 David Vance.
Overview of the International classification of occupations (ISCO) A case for Uganda Ssennono vincent.
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
International Auditing and Assurance Standards Board The Clarified ISAs, Audit Documentation, and SME Audit Considerations ISA Implementation Support Module.
Copyright 2010, The World Bank Group. All Rights Reserved. Integrating Agriculture into National Statistical Systems Section A 1.
What makes Affective Partnerships? Simon Baker Head of Contracts-Funding First4Skills.
Research Quality Assessment following the RAE David Sweeney Director, Research, Innovation, Skills.
UNECE EXPERT GROUP MEETING ON POPULATION AND HOUSING CENSUSES GENEVA, SEPTEMBER 2014 AGENDA ITEM 5 PROPOSED RECOMMENDATIONS ON THE OPERATIONAL ASPECTS.
WAMS Overview (Workload Allocation Management Service) December 2013 Bill Ferrier.
Successfully recording Continuing Professional Development.
National Commission for Academic Accreditation & Assessment Developmental Reviews at King Saud University and King Faisal University.
Key outputs from the GSS Quality Task Force and how these can help you… Jill Pobjoy (ONS), Emma Newman (ONS) and Nick Woodhill (DASA)
United Nations Statistics Division Registry of national Classifications.
ORGANISATION FOR ECONOMIC CO-OPERATION AND DEVELOPMENT ORGANISATION DE COOPÉRATION ET DE DEVELOPMENT ÉCONOMIQUES OECDOCDE Workshop on improving statistics.
The Research Excellence Framework Expert Advisory Groups round 1 meetings February 2009 Paul Hubbard Head of Research Policy.
United Nations Economic Commission for Europe Statistical Division Mapping Data Production Processes to the GSBPM Steven Vale UNECE
Selected Teaching-Learning Terms: Working Definitions...
Use of Administrative Data Seminar on Developing a Programme on Integrated Statistics in support of the Implementation of the SNA for CARICOM countries.
Annual survey of CARNet member institutions Barbara Kolarek.
GUIDANCE MANUAL AND IMPLEMENTATION Melanie Burdett J M Consulting Ltd.
Development Impact Evaluation in Finance and Private Sector 1.
DDI Methodology. Aims Purpose: To describe the study design specifications underlying the conduct of a research/business project. Possible coverage areas:
September Presentations to Staff1 Transparent Approach to Costing (TRAC) : an update.
HEFCE review of TRAC (Transparent Approach to Costing) Steve Egan Deputy Chief Executive, HEFCE Issues and proposals in the consultation.
MVC – Outcomes Assessment FLEX –Day February 8, 2013.
MANAGEMENT REVIEWS AND AUDITING IN SOCIAL INSURANCE INSTITUTIONS by: Jean-Victor Gruat, EUSE, Business Processes MANAGEMENT REVIEW AND AUDITING.
Dr. Salwa El-Magoli Chairperson of the National Quality Assurance and Accreditation Committee. Former Dean of the Faculty of Agricultural, Cairo university.
Changes to the HESA student record: impact on the HESES re-creation and WP funding Christine Daniel and Richard Puttock April 2008 SROC08.
THE INSTITUTIONAL REVIEW BOARD. WHAT IS AN IRB? An IRB is committee set up by an institution to review, approve, and regulate research conducted under.
QCC General Education Assessment Task Force March 21 and 22, 2016 Faculty Forum on General Education Outcomes.
Internal Audit Section. Authorized in Section , Florida Statutes Section , Florida Statutes (F.S.), authorizes the Inspector General to review.
Models for managing validation in a school context © Velg Training – Version 1.0, May 2016.
16-19 Accountability Measures. When Outcomes from summer 2016 (for students on 2 year courses). That is enrolments September First publication:
Should employability be compulsory? Chris Wilkinson Careers Adviser “I always thought of employability as selling yourself for a.
FALLS PROJECT Falls Auditing  Falls audits in the care homes had traditionally focused upon the number of falls per month – was a paper exercise.
Meeting of ICP Regional Coordinating Agencies Brief overview of ICP interim activities African Development Bank March 1, 2015, New York.
Development of Assessments Laura Mason Consultant.
Quality and Effectiveness Framework Learner Voice
Implementing and reviewing additional admissions assessments
EFA Briefing for The Trust Network
ASSESSMENT OF STUDENT LEARNING
Curriculum in Statistics at the University of Oviedo
Curriculum design Compliance with the new regulatory framework using the new ACU templates.
CIPFA Financial Assessments \ benchmarking
Point 9: Use of estimations in the UOE data collection
Views on TRAC and the UWE workload model
Staff experience of introducing the ‘electronic patient record’
WWater reuse Water Directors 24/11/2014 Nicola NOTARO
Urban Audit: Reference Guide Data Collection 2003/2004
Academic Workload Planning The Derby Experience
X-DIS/XBRL Phase 2 Kick-Off
Price Change Monitoring in the Lloyd’s Market From a finger in the air to a finger on the pulse September 2011.
External Examiners Briefing Session Friday 14th December 2018
Mapping Data Production Processes to the GSBPM
Methodology for assessment of Natura 2000 costs
Item 9 Validation in UOE data collection
Presentation transcript:

Improving Practice in the Sector MAW connections to TRAC and activity costing Will Foster September

Academic Workloads and TRAC What TRAC requires from a TAS Practicalities to make WLBM fit for purpose Issues and Responses Building on the Basics- Data becomes Management Information

What TRAC requires from a TAS What is needed to achieve a robust method- Schedules are used Cover periods that are representative of 12 months within 3 year cycle Individual academics complete themselves Response rates are statistically sound Data is collected over a 3 year cycle

Practical Steps Individual WLBM School WLBM Mapping Exercise School TRAC Faculty/ University TRAC TRAC % allocations TRAC schedules

Issues and Responses Internal Audit Some issues on robustness “The information provided by the WLBM continues to be at least as robust as data obtained under the methods suggested in the TRAC guidance”

Issues and Responses KPMG QA Review In current form not considered robust under the TRAC guidance To achieve robustness- Academics to review (positively) 3 * Year Classification should be formalised All activities and time to be covered Head of School to undertake reasonableness check

Issues and Responses Meeting with JM Consulting Action Plan Statistical Sampling Statistical Advice (Internal) Simple Questionnaire Statistical Review Better Documentation Clearer Linkage to TRAC definitions

TRAC Guidance “ It is unlikely that many institutions currently have workload planning models with [ the required ] level of rigour

TAS Characteristics Workload 100% Coverage –Every academic, every year Underpinned by other data sets- timetables, secured projects etc Updated in real time for changes Integral to actual activity Validated at HoS level

TAS Characteristics Diaries, Sampling etc Incomplete coverage Problems with recall Not integrated with other managerial processes “ Completion fatigue” and falling response rates

Building on the Basics Using WLBM for TRAC always seen as a means to achieve internal benefit Activity Costing calculated at School level from Year 1 Pilot Course Costing from 2002 Full Exercise from 2004 onwards Professorial Data Review 2008 Link to other initiatives e.g. Benchmarking