King Saud University College of Engineering Department of Industrial Engineering King Saud University College of Engineering Department of Industrial Engineering Improve The Value of PM Activities of Passengers Coach at (SRO) By ZAKI ALAWI AL-ALWAYET Advisor: Dr. Adel Al-Shayea Examiner: Dr. Mohammed Zaki Ramadan
Outlines Introduction. The aim of the project. (PM) activities in(SRO). The Selected PM Activities to be Studied and Improved. Solution methodology. Conclusions
Maintenance function is a set of activities that are performed in order to keep system’s equipment in their best working condition. The objective of maintenance is to maintain the capability of the system while controlling the resultant costs of performing maintenance function. Introduction
Introduction Studying and then improving the function value of the PM activities are vital for improving the way of doing these activities and in turn for reducing their costs.
The Aim of the Project This project is a study of the PM operations at SRO. The aim of the project is to improve the function value of the PM operation and activities by using the value engineering tools.In particular, improve value function in preventive maintenance program activities for passengers coach (Quarterly inspection, Semi-annually inspection, Annually inspection)
Maintenance activities at the Saudi Railway have an effective role in achieving the organization targets by ensuring operation demands and travel schedule achievements. Any problem in maintenance activities, especially PM activities, will decrease the number of travels, and therefore the organization will not reach the planned optimal schedule. PM activities in (SRO)
The Selected PM Activities to be Studied and Improved I selected preventive maintenance program of passengers coach to be studied and improved. The reason behind this is: preventive maintenance program of the passengers coach and its activities help to restore the condition of passengers coach items to an acceptable level, which is in turn necessary to maintain the passengers coach average desired life.
Solution methodology Solution methodology One way of studying and improving the function value of these activities is by using the value engineering technique. The reasons behind this is: 1.The ability of this technique in improving the value of the activities function at a minimum possible cost. 2.Ability to balance the cost and the function in such a way that required quality and performance, are maintained at the right costing level
Solution methodology The value engineering technique involves six phases. These are 1.The information phase. 2.The function analysis phase. 3.The creativity phase 4.The evaluation phase. 5.The development phase. 6.The presentation phase.
Information Phase: Coach Classification On Use Coac hes Total Number Of Coaches Coach Classification SwitzerlandFrenchGerman 610*4061st Class 2028*81372nd Class 69*333Restaurant 99333Baggage 22-11Royal Total On Use Coaches
Information Phase : Average times need to perform PM Activities Summarizes the average times needed to maintain a single coach for each section and for each type of inspection: AnnuallySix MonthsThree Months Average Time # Workers Average Time # Workers Average Time # Workers Air Break Air Conditioning Bogie Body Repair Electric 9373ـــــــــــــــــ Painting Carpenter Pipefitting Upholster Total
Information Phase : Quarterly activities relationships and dependencies TypePredecessorDurationActivity Description Activity ID 9Electrical Semi-annually ItemsELCS Finish-StartELCS3Air Conditioning Semi-annuallyACS 6Body Repair Quarterly ItemsBRS 4Air Break Semi-annually ItemsABS 6Bogie Semi-annually ItemsBGS Finish-StartABS5Pipefitting Semi-annually ItemsPFS 6Carpenter Semi-annually ItemsCRS Finish-StartCRS2.5 Upholstery Semi-annually Items HSS Finish-StartBGS-ELCS7Painting Semi-annually ItemsPTS
Information Phase : Quarterly activities Gantt Chart
This means the real time that had consumed for quarterly inspection on the average is 1.56 days. Real time that had consumed for semi-annually inspection on the average is 2 days. Real time that had consumed for annually inspection on the average is 4 days. (The day in the Gantt chart represents the working hours which is from 7:00 am until 2:00 pm). Information Phase : Average times need to perform PM Activities
AnnuallySix MonthsThree Months Air Break Air Conditioning Bogie Body Repair Electric Painting Carpenter Pipefitting Upholster Total Information Phase : Average Number of breakdowns
Each breakdown in the passengers coach was happened it cause losses to the Saudi Railway Organization depend to the size of failure and in which part was happened. For example, the failure is happen in electric part is not like is happen in upholster part. Information Phase : Average Number of breakdowns
The total cost of preventive maintenance=spare parts cost + labor cost + tools cost + losses Cost. The average hour salary for workers in the Saudi Railway Organization is SR. 28.5/hour. This means the labor cost = hour work* The tools cost is depend on the working hour and the cost of tool per hour. In spare parts cost there are difference between the sections, which means the cost of spare parts depending in which parts the spare parts was used. The losses cost include the cost due to the passengers coach is stop, for the inspection or for repair the failure. And the costs for repair the failure. Information Phase : Average Cost in each PM Program
AnnuallySix MonthsThree Months Total cost Air Break Air Conditioning Bogie Body Repair Electric Painting Carpenter Pipefitting Upholster Total Information Phase : Average Cost in each PM Program
REMARKSP/W WORTH (SR) PRESENT (SR) KINDKIND FUNCTIONITEM UNIT NOUNVERB BAvailabilityMaintainAir Break1 Problem in the way of putting priorities BAvailabilityMaintain Air Conditioning BAvailabilityMaintainBogie BAvailabilityMaintainBody Repair4 Workers skills problem & Spear Parts BAvailabilityMaintainElectric BAvailabilityMaintainCarpenter BAvailabilityMaintainPipefitting BAvailabilityMaintainUpholster8 Function Analysis Phase
REMARKS P/ W WORTH (SR) PRESENT (SR) KINDKIND FUNCTIONITEM UNIT NOUNVERB BAvailabilityMaintain Air Break BAvailabilityMaintain Air Conditioning 2 Problem of the way doing the job BAvailabilityMaintain Bogie BAvailabilityMaintain Body Repair4 Problem in the way of putting priorities BAvailabilityMaintain Electric5 Problem in the way of putting priorities BAvailabilityMaintain Painting BAvailabilityMaintain Carpenter BAvailabilityMaintain Pipefitting BAvailabilityMaintain Upholster9
Function Analysis Phase REMARKS P/ W WORTH (SR) PRESENT (SR) KINDKIND FUNCTIONITEM UNIT NOUNVERB Problem in the way of putting priorities BAvailabilityMaintain Air Break BAvailabilityMaintain Air Conditioning 2 Problem in the way of putting priorities BAvailabilityMaintain Bogie BAvailabilityMaintain Body Repair BAvailabilityMaintain Electric5 Problem in the way of putting priorities BAvailabilityMaintain Painting BAvailabilityMaintain Carpenter BAvailabilityMaintain Pipefitting BAvailabilityMaintain Upholster9
Creative& Evaluation Phases Average Rank Benefits Satisfying Operation Requirements Satisfying Safety Measures Simplicity of Implementation Factor Idea # Restudy the relationship between the air conditioning section and electric section in the quarterly inspection Increase the number of worker in the air conditioning section Used other spare parts in electric section Increase the number of worker in electric section 4
Creative& Evaluation Phases Average Rank Benefits Satisfying Operation Requirements Satisfying Safety Measures Simplicity of Implementation Factor Idea # Restudy the relationship between the air conditioning section and electric section in the semi- annually inspection Restudy the relationship between the painting section and electric section in the semi-annually inspection Contract with company to inspection the bogie system Increase the number of worker in electric section Increase the number of worker in the air conditioning section Increase the number of worker in the bogie section 6
Creative& Evaluation Phases Average Rank Benefits Satisfying Operation Requirements Satisfying Safety Measures Simplicity of Implementation Factor Idea # Restudy the relationship between the air break section and bogie section in the annually inspection Restudy the relationship between the painting section and electric section in the annually inspection Restudy the relationship between bogie and electric section in the annually inspection Increase the number of worker in the air break section Increase the number of worker in the bogie section Increase the number of worker in the electric section 6
Development Phase After evaluation process, I selected the best idea (higher average rank) for develop. The best idea is the restudy the relationship between the sections. This is done by breaking down the items in checking lists then fined the relationships and dependencies between sections and items.
TypePredecessorDurationActivity Description Activity ID Finish- Start ELCQ24.25Electrical Quarterly Items from 1 to 13ELCQ1 2.75Electrical Quarterly Items from 14 to 19ELQC2 2Air Conditioning Quarterly ItemsACQ1 Finish- Start ELCQ20.92Air Conditioning Quarterly ItemsACQ2 6Body Repair Quarterly ItemsBRQ 4Air Break Quarterly ItemsABQ 1.5Bogie Quarterly Items from 1 – 12BGQ1 1Bogie Quarterly Items from 13 – 18BGQ2 Start-StartABQ0.5Bogie Quarterly Items from 19 – 21BGQ3 Finish- Start PFQ22.75Pipefitting Quarterly Items 1 to 7PFQ1 ABQ1Pipefitting Quarterly Items 8 and 9PFQ2 5Carpenter Quarterly ItemsCRQ 2.5Upholstery Quarterly ItemsHSQ Development Phase
Annually Inspection Semi- Annually Inspection Quarterly Inspection Cost Summary Original Proposed Total Cost Saving Development Phase
Conclusions 1.Finding the value index for the preventive maintenance program activity is very important for service sector in order to maximize service equipment availability while keeping the cost of performing maintenance activities at the lower level. 2.The improvement of the preventive maintenance program activity by increase its value index helps in increasing the total cost saving. 3.Value engineering techniques are very useful in increasing value index for preventive maintenance activities such as quarterly inspection, semi-annually inspection, annually inspection.