Chamber production status 75% of production (of 1st half of detector) reached in May Currently ~80% is produced 100% (1st half) expected in October. End.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Dubna report. January 28 - Programme Advisory Committee approved JINR participation plan in the ATLAS upgrade, which was presented by A.Cheplakov.
East Carolina University Compressed Gas Safety Training Program
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
TRD Collaboration Meeting GSI Clemens Adler TRD Chamber production issues General Issues, Planning and Hd Status.
1/8/04Lance Simms Thermal Testing of TOB/TEC Hybrids at UCSB.
HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
Hd Status and Planning TRD Chamber Construction Meeting Clemens Adler.
/06/2015 Christian J. Schmidt GSI Production of ALICE TRDs Progress and Quality Development Alice TRD Chamber Production Meeting Darmstadt Feb.
Test Results Of Gain Uniformity Measurements Heidelberg Chamber maximum deviation [%] L1C0#001 33,45 L1C0#002 25,94 L1C0#017 24,41 L2C0#001 16,76 L2C0#002.
TRD Status Meeting Münster Clemens Adler TRD ROC Status Status Meeting Münster
TRD Collaboration meeting GSIClemens Adler First TRD Production Chambers Production Tests Results Documentation.
TRD Status meeting IKFClemens Adler TRD ROC Status -Dubna -Bukarest -GSI -Frankfurt -Heidelberg.
TRD Collaboration meeting GSIClemens Adler First Production Chambers Production/tests/results.
Technical Forum Alice week Clemens Adler Transition Radiation Detector Status Participating Institutions: Athens University, NIPNE Bukarest, JINR.
PRR TRD COOLING A. Marín (GSI) 7/01/2004 ALICE PRR TRD COOLING P.Glässel, A.Marín, V.Petracek, J.Stachel, M.R.Stockmeier, J.P.Wessels ALICE PRR TRD COOLING.
TRD Status meeting HeidelbergClemens Adler Chamber production Production status/ Material status.
TRD Status meeting GSIClemens Adler Chamber production Production status/ Material status.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
TRD Status meeting Alice week HdClemens Adler TRD Chamber Status News: New leak rate measurements Production is imminent Some material arrived Soldering.
UIC – Physics Department Fast Timer Project Bob Dysert, Alan Bross - Fermilab November 18, 2005.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
1 TOF Aging Discussion Background information Summary of results so far Examples of gain loss mechanisms Diagnostics Possible scenarios for 2006 Discussion.
Construction and quality control of the end-cap Transition Radiation Tracker for the ATLAS experiment Vasiliki A. Mitsou CERN HEP 2003, April, Athens,
How to locate leaks on wing tanks with the Hydrogen Method Mikael Ekström norm electronics 18 Voulis st Athens Greece (T) ,
20/04/2012Rui De Oliveira1 20/04/2012. Rui De Oliveira2 30 cm x 30 cm example.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
One batch of the IC are from 15 IC for reason of reasonable uniform of flux 1 central IC is as reference chamber set up HV max 1500V 50 measured points.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
Production of Forward RPC Gaps CMS Forward RPC EDR (10/10/2002 – 11/10/2002) Seong Jong Hong KODEL, Korea University.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
SD-HCAL technological prototype – Chamber and cassette production Nick Lumb Lyon, 3 February 2011.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
TOP counter overview and issues K. Inami (Nagoya university) 2008/7/3-4 2 nd open meeting for proto-collaboration - Overview - Design - Performance - Prototype.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
G. PassalevaRoma - July 28, 2004 Status of MWPC production site in Florence G. Passaleva.
JINR-BMBF Workshop, Dubna Clemens Adler PI Heidelberg ALICE TRD Transition Radiation Detector Overview and Status Clemens Adler Physikalisches.
NCP-CERN Project status Waqar Ahmed. Items Production sites requirements Clean room Gas system Gas leak measurement station. Leakage current measurement.
Plans for MPGD Radiation hardness tests for full detectors and components Matteo Alfonsi,Gabriele Croci, Elena Rocco, Serge Duarte Pinto, Leszek Ropelewski.
HBD Status Craig Woody BNL DC Meeting October 3, 2007.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
Wafer Edge Exclusion Kevin Fisher.
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 16-Nov-2009.
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
TRD Workshop RomaniaClemens Adler Heidelberg ROC Status Material procurement, Chamber Status TRD workshop Cheile Grandistei, Romania,
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
RPC Production status for Engineering Module & Detector stack at IICHEP, Madurai Shri. S.D.Kalmani TIFR.
10-Jun-16S.Movchan Straw manufacturing and QC1 Straw manufacturing conditions and QC tape and straw parameters specification conditions of straw production.
Considerations from machine protection and the ELQA teams
Quality Control Chamber Production
Production ad Quality control of RPCs for the CMS muon barrel system
Overview of the Frascati Production Facilities
Some proposals on HV circuits realization for segmented straw detector
(On Behalf of CMS Muon Group)
Presentation transcript:

Chamber production status 75% of production (of 1st half of detector) reached in May Currently ~80% is produced 100% (1st half) expected in October. End of chamber production expected early 2008

Problems Unconnected pads/shorted pads: –Reason: solder problems/carbon fibres connecting 2 channels – < 0.01% of channels affected Gain uniformity: –Some chambers (especially largest size) show worse uniformity than expected. –So far no performance loss expected due to this, but discussion ongoing. Leakage currents due to glue: –Change in formulation of hardener created leakage currents at edge of chambers –Solution is cleaning of glue surface First batch of chambers from Dubna (18pc.) damaged due to low air pressure in plane: –Radiators cracked due to overpressure inside –All, but 2 chambers could be repaired.

Padplane design change Removal of copper of the outermost pads. –Reason: create isolation barrier between anode HV and ground. –No implications on acceptance. –Change for 2nd half of detector Edge of chamber

Chambers->Supermodules Chambers (from Bucharest/Dubna/Heidelberg) arrive at GSI. Storage area is available. Testing: –Individual testing of chambers in production site (full set of QA tests) –Before Electronics equipping in Frankfurt, HV test will be done (check for electrostatic sanity, after transport) –During assembly of SM: leak test of chamber layers. So far no indication of transport problems.