SAWKRA-LAKBI ROAD: OMAN Constantinos Tsoucalas, Jad Karam, Lyle Paladin-Tripp.

Slides:



Advertisements
Similar presentations
Broadband for “Smart” Development The Fishing with 3G Nets Project Francisco Giacomini Soares, Sr. Director, Government Affairs Rio de Janeiro, June 19.
Advertisements

Invest in Loznica Belgrade,december LOCALITY: 44°33’ N,19°14’ E POPULATION residents (94,1 homogenous Serbian population)
Factoring, Forfaiting and Leasing as Nontraditional Forms of Foreign Trade Financing FEM, MPA Martina Horňáčeková 2nd year, Andrea Králiková 2007/2008.
1 Comprehensive Disaster Risk Management Framework National Disaster Management Systems 1111 Introduction to Damage and Reconstruction Needs Assessment.
Farmland Values and Leasing Key Questions Chapter 20 §What determines the value of farmland? §What are the advantages and disadvantages of owning vs. leasing?
Making the economic case for better streets and places.
SAUDI ARABIA – A GLOBAL POWER FOR THE INTERIORS AND FIT-OUT INDUSTRY INDEX International Design Exhibition, Saudi Arabia.
Trade, Regional Cooperation and Connectivity between North East India and Bangladesh Focus on Tripura Siddhartha Mitra Director (Research) CUTS International.
17:Long-Term Economic Growth
Growth & Structural Change. Measuring Production & Growth Production: total market value of final goods and services produced in one year Growth: percentage.
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
Economic Indicators. Concepts  Variables that provide information about the state of the economy.  Every economic indicator has a story to tell.  Need.
KFUPM, Department of Construction Engineering and Management CEM 520 LIABILITY ALLOCATION AMONG THE PARTIES TO FIXED-PRICE CONSTRUCTIN CONTRACTS IN SAUDI.
COUNTRY STUDY - POLAND POLISH PROGRAMME OF MOTORWAYS CONSTRUCTIONS - BARRIERS OF IMPLEMENTATION Prof. Jan Burnewicz, dr Monika Bak University Of Gdansk.
Sunny Spain Tourism in Spain Mr Boland Geography.
Negative & Positive Aspects of Expanding Local Attractions
Public Presentation Presented by Smart International Consulting. May 2013.
Department of Economics and BusinessBIS Phuket
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 14 Energy Efficiency Module 14: DEMAND-SIDE MANAGEMENT.
Ibrahim Almutaz 1, AbdelHamid Ajbar 2, Emad Ali 3 1 Chemical Engineering Dept., King Saud University, Riyadh, Saudi Arabia
Surety Bonds The Sensible Choice For Managing Risk.
SS7E7a,b,c.d The student will describe factors that influence economic growth and examine their presence or absence in Israel, Saudi Arabia, and Iran.
GPS 2011 Slide - 1 CAPTURING LARGE DEALS. HOW TO TARGET LARGE DEALS AND CLOSE THEM. Success story from Oman.
Part-financed by the European Union Priority 2 of the BSR Programme External and internal accessibility of the BSR Ryszard Toczek, City of Gdynia.
 We will be watching the video about the population of the world again. I want you to pay attention to the little white dots. There are time periods.
Principles of foreign exchange Chapter 4. Overview Trading one currency for another arises from the elements that make up a nation’s balance of payments:
Gross Domestic Product and Growth Chapter 12. Why Measure Growth? After the Great Depression, economists felt it was important to measure macroeconomic.
Factors that Affect Profit Margins In the hospitality, travel, and tourism industry…
Aid for Trade Needs Assessment – Georgia United Nations Development Programme.
China CGG3O. China 3 rd largest country in the world in area –9.6 million km 2 Largest population –1.3 Billion 4000 years of history Diverse landscape.
Challenges for the corn supply chain in Brazil: from investments in logistics infrastructure to regulation of biotechnology Profa. Dra. Andréa Leda R.
Chapter 1 Overview of a Financial Plan
TRACECA PROJECT EVALUATION
IFIs role in Tsunami Rehabilitation presentation by S.M.Prithiviraj Voices from the margins (VFM) Tamilnadu, India. &
The Political and Legal Environment
Project Monitoring and Evaluation in the GMS 7-18 May 2012, Mekong Institute, Khon Kaen Project Monitoring and Evaluation for Road Construction in Lao.
Accessibility project in Denmark Phase 1 - Collect data, define congestion, establish methods to estimate congestion and the marginal congestion costs.
Tourism project (1) TM481 week 4.  An organization’s mission is its current purpose and scope of operation, while its vision is a forward – looking statement.
1 Long-Run Economic Growth and Rising Living Standards Economic Growth.
© 2007 Thomson South-Western. In this section, look for the answers to these questions: Why does productivity matter for living standards? What determines.
How the process is significant for people: Economic Impacts of Tourism.
Input Demand: The Capital Market and the Investment Decision
1 Chapter 5: Developing a Global Vision Copyright Cengage Learning 2013 All Rights Reserved Designed & Prepared by Laura Rush B-books, Ltd. Introduction.
Chapter 19 Economic Growth in Developing Nations.
Capital, Investment, and DepreciationCapitalInvestment and DepreciationThe Capital MarketCapital Income: Interest and ProfitsFinancial Markets in ActionCapital.
GOSA 14 March SA GRAIN ECONOMIC PERSPECTIVE PRESENTATION TOPICS 1.AGRICULTURE IN PERSPECTIVE 3.OUTLOOK FOR 2012 / TRENDS IN THE GRAIN INDUSTRY.
Welcome To Invest in Timor-Leste
2008 Cyclone Season in Madagascar Results of the Assessment.
CAI-Asia is building an air quality management community in Asia Investment Implications of the Action Plan Sustainable Urban.
Planning the New Rural Economy Fergus Murray Argyll and Bute Council Development Policy Manager.
Circular Flow Model and Economic Activity
Michigan State University Global Online. The Structural Analysis of Industries Forces that Determine Industry Profitability Rivalry among current competitors.
Chapter 1 Overview of a Financial Plan. Copyright ©2014 Pearson Education, Inc. All rights reserved.1-2 Chapter Objectives Explain how you benefit from.
Poland’s 10 years in the European Union. Political dimension of Poland’s EU membership: how Poland has changed Europe.
Location The park is located between the major centers of consumption in Russia Industrial Park MSB-Udomlya is located in the Tver region. The developed.
Construction in Vietnam – Key Trends and Opportunities to 2018 Market Research Report ©reportscue.
PERU: STATE OF THE HOUSING INDUSTRY IHA Secretariat.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Welcome.
PRESENTATION PREPARED FOR IRC INTERNATIONAL CONFERENCE DUBAI, DECEMBER 2014 Dr. Alexandrina Maria Pauceanu STRATEGIES FOR IMPROVING.
Performance-Based Management for Brownfields - Best Practices and Approaches November 2006 Eliana Makhlouf, Ph.D., P.E. Marsh Environmental Practice.
ГММ -1( а ) Li Jianfei. By 2040, the world and, in particular, countries which have large and technologically advanced economies – such as the USA,
BUILDING ENERGY ANALYSIS OVERVIEW OF ENERGY CONSUMPTION IN BUILDING SECTOR- GLOBAL AND SAUDI PERSPECTIVE.
Logistics Solutions Services
Globalization Unit 5.
PPPs for Value Chain Development
CE 2303 Railways, Airports & Harbor Engineering
Southwest Asia The Middle East
Healthcare Policies in GCC: Challenges and Future Directions:
Unit 8 The tertiary sector.
Presentation transcript:

SAWKRA-LAKBI ROAD: OMAN Constantinos Tsoucalas, Jad Karam, Lyle Paladin-Tripp

WHERE IS OMAN?

BACKGROUND Oil was discovered in the 70’s in Oman Oil was discovered in the 70’s in Oman The economic development underwent a period of rapid expansion The economic development underwent a period of rapid expansion Oil export considerably raised the standard of living in Oman Oil export considerably raised the standard of living in Oman YEAR Income per Capita ($) 3603,1407,0008,000

MODERNIZATION PROGRAM Sultan Qaboos Bin Saeed implemented a modernization program Sultan Qaboos Bin Saeed implemented a modernization program Priority was given to the country’s almost non-existent physical infrastructure Priority was given to the country’s almost non-existent physical infrastructure In the form of: roads, a new deepwater port, an international airport, electricity-generating plants, desalination plants, schools, hospitals, and low-cost housing In the form of: roads, a new deepwater port, an international airport, electricity-generating plants, desalination plants, schools, hospitals, and low-cost housing Oil receipts almost exclusively made this possible Oil receipts almost exclusively made this possible

THE PROJECT Our project involves the construction of a road that connects the two towns of Al Lakbi and Sawqra Our project involves the construction of a road that connects the two towns of Al Lakbi and Sawqra Sawqra is a small town of 2000 people Sawqra is a small town of 2000 people It is surrounded by high mountain ranges on three of its sides, and by the sea on its fourth side It is surrounded by high mountain ranges on three of its sides, and by the sea on its fourth side It lacks the services and institutions that its neighboring town, Al Lakbi, possesses It lacks the services and institutions that its neighboring town, Al Lakbi, possesses

PROBLEM STATEMENT MOUNTAINS SAWQRA AL LAKBI SEA

ALTERNATIVES BENEFITSDISBENEFITS Displacement of citizens of Sawqra Eliminates need to build new services Tribal/Familial issues Building services in Sawqra Eliminates need to walk over mountain Very Costly & need road anyway Road around the mountain Access to Sawqra No contact with sea 16 km long Road through mountain Shortest path/No contact with sea Huge amounts of excavation Coastal road Short path/least costly Contact with sea

EVALUATING THE PROJECT: TWO PERSPECTIVES  Contractor/Businessperson  Omani People

CONTRACTOR’S PERSPECTIVE Contractor receives advance payment of 10% of contract value Contractor receives advance payment of 10% of contract value Bill of Quantities: Contractor’s estimate of costs Bill of Quantities: Contractor’s estimate of costs Contractor’s Income: Monthly payment from the Sultanate Contractor’s Income: Monthly payment from the Sultanate

CONTRACT DETAILS Successful bid: 2.5 million Omani Rials (OR) Successful bid: 2.5 million Omani Rials (OR) Project completion time: 1 year Project completion time: 1 year Penalty for delay: 2,000 OR per day (1% of contract value) Penalty for delay: 2,000 OR per day (1% of contract value) Guarantee: 5 % of contract Value Guarantee: 5 % of contract Value

CASH FLOW: CONSTRUCTION COMPANY

BENEFITS TO OMANI PEOPLE Sawqra Sawqra Hospital Access Hospital Access School Access School Access Commerce Commerce Al-Lakbi Al-Lakbi Investment Opportunities Investment Opportunities Sultanate Sultanate Improved National Communication/Interaction Improved National Communication/Interaction

OMANI’S PERSPECTIVE The Ministry of Transportation pays the contractor monthly The Ministry of Transportation pays the contractor monthly Benefits will be seen upon completion of the road until 50 years hence Benefits will be seen upon completion of the road until 50 years hence All benefits are a result of providing the villages with better access to each other All benefits are a result of providing the villages with better access to each other

CASH FLOW: OMANI PEOPLE

RISKS AND UNCERTAINTIES Prof. Pena-Mora defines two types of uncertainty, external and internal Prof. Pena-Mora defines two types of uncertainty, external and internal External uncertainty includes: social impacts, regulations, weather, and unpredictability External uncertainty includes: social impacts, regulations, weather, and unpredictability Internal uncertainty includes: unforeseen site conditions and incomplete scope Internal uncertainty includes: unforeseen site conditions and incomplete scope

EXTERNAL UNCERTAINTIES Social Impact Social Impact Local population claimed that the route encroached on their private property Regulations Regulations After the contractor agreed to build the road, the government stipulated that 30% of the workers must be Omani

EXTERNAL UNCERTAINTIES Weather Weather Severe storms during the summer due to the Monsoon season extended in time beyond expectations Unpredictability Unpredictability Tombs were discovered on the road site during construction during construction Fuel costs soared by 40% during the construction period

INTERNAL UNCERTAINTIES Unforeseen Site Conditions Unforeseen Site Conditions Rock Armor had lower density than expected Incomplete Scope Incomplete Scope The local desalinization plants could not handle the demand from the contractor, which caused long delays The local desalinization plants could not handle the demand from the contractor, which caused long delays

BENEFITS EVALUATION Factors considered: health, education, and commerce Factors considered: health, education, and commerce Monetary values were assigned to each of these categories using data from official Omani records Monetary values were assigned to each of these categories using data from official Omani records Missing data was obtained from neighboring countries’ records, which include Saudi Arabia, UAE, and Bahrain Missing data was obtained from neighboring countries’ records, which include Saudi Arabia, UAE, and Bahrain

HEALTH BENEFITS ANALYSIS New road provides quicker access to Lakbi hospital New road provides quicker access to Lakbi hospital This increases preventable deaths and helps reduce severity of injuries This increases preventable deaths and helps reduce severity of injuries

EDUCATIONAL/COMMERCE BENEFITS EDUCATION  Road provides access to Lakbi schools  This may increase the number of high-school graduates and net average income COMMERCE  Road provides trade-route between Sawkra and neighboring towns  The majority of Sawkra citizens are fishermen and the road allows for the extension of their market

COMMERCE: TOURISM Allows tourist access to Sawkra’s beaches and Sawkra’s traditional ways of living Allows tourist access to Sawkra’s beaches and Sawkra’s traditional ways of living Potential for population growth as the price of land may rise with the establishment of holiday resorts and an increase in economic activity Potential for population growth as the price of land may rise with the establishment of holiday resorts and an increase in economic activity

SENSITIVITY ANALYSIS:BENEFITS SCENARIO AVG. CHANGE IN NET PRESENT VALUE (O.R.) AVG. CHANGE IN NET PRESENT VALUE (O.R.) Commerce500,000 Health1,200,000 Education200,000 As evident in the sensitivity analysis, health is the predominant factor

SENSITIVITY ANALYSIS: COSTS There are many uncertainties in the cost side of the analysis There are many uncertainties in the cost side of the analysis These uncertainties are discussed in great detail in our report but we will highlight the main ones which are: Preliminary delays, lack of geologic knowledge, and increase in fuel price These uncertainties are discussed in great detail in our report but we will highlight the main ones which are: Preliminary delays, lack of geologic knowledge, and increase in fuel price

SENSITIVITY ANALYSIS: COSTS SCENARIO AVG. CHANGE IN NET PRESENT VALUE (O.R) DELAYS70,000 INCREASE IN FUEL COST 20,000 GEOLOGY COST 30,000 As evident from sensitivity analysis, delays in time are the predominant factor affecting costs

ENGINEERING DEDICATED TO THE LOCAL COMMUNITIES