1 Team BUSS Backup Storage Source. 2 Team BUSS Backup Storage Source EHV Substation Second DC Storage Source Sponsor Idaho Power Company Team Members.

Slides:



Advertisements
Similar presentations
NERC Footnote b / 12 – Load Loss
Advertisements

PowerPoint ® Presentation Chapter 4 System Components and Configurations Components Electricity Sources System Configurations.
Study Committee Representatives Annual Report December, 2012
New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
Key Reliability Standard Spot Check Frank Vick Compliance Team Lead.
Power Grid Reinforcement Fall Presentation Team 9b: – Jon Brown – Kyle Reininger – Alan Myers – Karl Homburg – Dan Sinnott.
Transmission Transporting Electricity by Wire Darcy Neigum Montana-Dakota Utilities Co.
ERIC VANDENBURG, SPENCER HOMAN, TREVOR LARSON and NIK URLAUB Team website: / 1.
Energy Efficiency Lighting Sponsor: Presentation by: Allan Grant, VP Business Development, Corvus Energy Topic:Advanced Energy Storage Solutions as a Key.
Asia Geospatial Forum, PWTC, Kuala Lumpur 25 th September 2013.
BPS12 Battery Power Supply. December 2003 Page 2 Better Than Standard UPS systems Longer battery life –unique charging scheme DC power output –instead.
Reliability of present dc system is high, but could increase if a redundant battery or a redundant battery system were put in parallel with present system.
April 15 and May 15, 2003 ERCOT System Disturbances ERCOT TAC Meeting June 4, 2003.
Smart battery technology for a global environment Louie Lane #104 Reno, Nevada
Photovoltaic Cells Boris Krassovski Emerson Peacock 6 th Period.
ERIC VANDENBURG, SPENCER HOMAN, and TREVOR LARSON Team website: 1.
ERIC VANDENBURG, SPENCER HOMAN, TREVOR LARSON and NIK URLAUB Team website: / 1.
FRIENDS and WAR The mission of the Power Center for Utility Explorations is to explore all energy issues holistically and to develop innovative solutions.
Team BUSS Backup Storage Source. Team BUSS Idaho Power Company Backup Storage Source Project Title Extra High Voltage (EHV) Station Second DC Storage.
1 Team BUSS Backup Storage Source. 2 Team BUSS Backup Storage Source EHV Substation Second DC Storage Source Sponsor Idaho Power Company Team Members.
1 Project Overview n Review current and future problems n Develop Solutions that will provide the customer with high quality reliable power n Test the.
© ABB SG_Presentation_rev9b.ppt | 1 © ABB SG_Presentation_rev9b.ppt | 1 Smart Grid – The evolution of the future grid Karl Elfstadius,
UMKC Senior SUBSTATION DESIGN TEAM
No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means – electronic, mechanical, photocopying,
SUBSTATION MODELING: PROTECTION AND AUTOMATION
2015 World Forum on Energy Regulation May 25, 2015
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
Lesson 9: Electrical Components
Scheduled Versus Event Driven Testing of Distribution Protection IEDs Dr. Alexander Apostolov, Benton Vandiver, Will Knapek, OMICRON electronics.
Economy and calculations If 4 million households are provided with smart power cells, the total price of generators, all equipment and software will be.
Frankfurt (Germany), 6-9 June 2011 Agenda 1. Background 2. System Design 3. Experience 4. Future work Henrik Stomberg– Sweden – Session No 4 – Paper No.
APPA Engineering and Operations Technical Conference Atlanta, Georgia April 13-18, 2007 “Nailing the Basics” Earns Princeton, IL RP3 Diamond Award.
1 Some Issues about Big Data in Power Grid Gary Quan.
Shore Station UPS Requirements for the NEPTUNE Power System
BLACKOUT POWER OUTAGE By Masih Madayeni Class 3/6 English Presentation.
1 Impact of Distributed Generation on Voltage Profile in Deregulated Distribution Systems By: Walid El-Khattam University of Waterloo, Canada
Texas Integrated Energy Solutions. Development Team, Background, Objective, & Justification 2.
Presenter: Peter Busch
Golden Valley Electric Assoc. Inc © 2012 GVEA. All rights reserved. GVEA BESS Expected and Actual Performance Dan Bishop Golden Valley Electric Assoc Fairbanks,
NHA 2010, Long Beach, California, USA E. PINTON May 4th TECHNICAL AND ECONOMICAL STUDY ABOUT THE INTEREST IN USING PEMFC SYSTEMS TO FEED STAND ALONE.
Senior Design, Spring 2013 Jane Peters Riley Groves Jared Jasper Matt Murphy Muzi Li.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
General Background Senior design project May03-16, Fuel Cell Project, involves providing our client, MidAmerican Energy, a report containing a detailed.
Economic Analysis of Alternative Energy Sources Problem Statement Design for rural Iowa client Evaluate alternative energy sources - Wind - Solar - Petroleum.
Energy Storage Applications at AEP Emeka Okafor American Electric Power Presentation to SouthWest Electric Distribution Exchange May 7, 2009.
Reliability Study of Power Generation System Utilizing Wind Power Derek H. Geiger DSES-6070 HV5 Term Project 31-March-2008.
Summary Rich Bauer, Senior Reliability Engineer Event Analysis Subcommittee – LL Update March 04, 2014.
Electrical Circuits Bobbi Martin, Las Vegas, NV. What is electricity?  It is a form of energy that is created from the movement of electrons of atoms.
Automated Capacitor Control Program at TXU Electric Delivery SWEDE May 1, 2006.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
Utility Engineers, PC.  Generation  Transmission  Distribution.
SOLAR RENTING (PTY) LTD WHY SHOULD A CUSTOMER BUY SOLAR, IF HE CAN RENT? THEY CAN RATHER USE THEIR MONEY TO MAKE MONEY!
NERC Lessons Learned Summary LLs Published in September 2015.
Gavin Abo Nate Stout Nathan Thomas HydroFly Flywheel.
Distribution Systems-General
Gavin Abo Nate Stout Nathan Thomas HydroFly Flywheel.
Alternative Energy Evaluation May06-16 Team Members: Steve ChebuharEE Anhtuan DinhEE Ryan FerneauCprE Justin JorgensenEE Client : Professor Ralph Patterson.
Gavin Abo Nate Stout Nathan Thomas HydroFly Flywheel.
Preventing Voltage Sags and Interruptions. # Equipment supplier awareness: # Customers level protection: # Utility level protection: - Sag magnitude and.
Dated: 17 February 2016 Instructor :Kashif Mehmood.
Uninterruptible Power Supply Improves Reliability at The Australian Synchrotron Sean Murphy – ARW 2013 Melbourne.
ACEC National Energy and Environment Challenges in Asset Management? Brian Long Transmission Line Performance Xcel Energy August 15, 2015.
Colocation Data Center Availability : Making Maintenance Windows Obsolete Christopher Thames, Director of Critical Facilities.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
© ABB Group October 1, 2016 | Slide 1 DynaPeaQ ® SVC Light ® with Energy Storage FACTS.
SCE Energy Storage Perspective
Uniper Energy Services
Tailor-made solutions in response to increased demands on supply quality … paper 2.66 by DREWAG – Stadtwerke Dresden GmbH (Germany)
—Two power conditioning units (PCU)’s needed only if batteries are added for grid failure —AC output is consistent with the requirements of most loads.
Presentation transcript:

1 Team BUSS Backup Storage Source

2 Team BUSS Backup Storage Source EHV Substation Second DC Storage Source Sponsor Idaho Power Company Team Members Rob Butzer Mitch Colburn Brian Vandenburg

3 Presentation Outline Project Background Customer Needs Reliability Analysis Alternatives Analysis

4 Presently, substation backup battery systems are a single point of failure within the power system In the eastern U.S., utility companies are required to have dual battery backup system in any substation over 230kV Project Background

5 Operates station control equipment (communication, relays, breakers, alarms) Battery bank used during power outages to maintain control of substation DC System

Project Background6 One Line Diagram

Project Background7 Bank of up to 60 cells Each cell rated at about 2.1V Nominal Voltage of ~130V DC Battery Bank

Project Background8 Continuous load draws 5.5A for 8 hours to maintain station control Momentary load of A to be supplied after 8 hours for breaker control Minimum Voltage ~105V Battery Bank Sizing

9 1. Calculate reliability of present DC battery system 2. Seek alternatives for a backup dc storage supply and evaluate added reliability 3. Implement scaled prototype on a bench top system Customer Needs

10 50 faults * = 1.06 failures/year Present Fault Tree

11 Projected Fault Tree

12 Evaluation Basis: 1. Reliability 2. Cost 3. Maintenance 4. Life Expectancy Alternatives

Alternatives13 Economical Analysis Initial Cost $10,548 Battery Rack $1,460 Maintenance Cost ~$13,000/year

Alternatives14 Ultracapacitors High Initial Cost Low Maintenance Environmentally Friendly

Alternatives15 Fuel Cells High Initial Cost Low Maintenance Environmentally Friendly Needs Energy Partner

Alternatives16 DC Generator Set Low Initial Cost High Maintenance Cost

Alternatives17 Flywheel Low Initial Cost Low Maintenance Cost Not a stand alone source

Alternatives18 Dual Battery Backup Low Initial Cost High Maintenance Cost Field tested

Alternatives19 Nuclear Power Plant Very High Initial Cost Lots of Maintenance Terrible for Environment

20 Project Timeline

Project Background21 Discussion Conclusion