Agenda Functional Requirements Performance Requirements Data Flow Diagrams Screen Shots Summary Upcoming Dates.

Slides:



Advertisements
Similar presentations
Presented by Thabo Letopa
Advertisements

JobTracker™ A Job Tracking System for Architects & Engineers Produced by LA Solutions.
Unversity Car Rental Final Project of the E-Development Team: Donna, Brian, Mike, Art, & Stephen.
Rest Hours Monitoring and Planning. About RHMP RHMP is a system that provides A check on the compliance of an employees work / rest schedule within a.
Welcome Mr. Swarner November 5, 2004 TCP/IP Packet Descriptor Requirements Specifications Paradigm Solutions.
System definition and boundaries Subsystems, environment, connections, dependencies Payroll Rules, contracts Working time Reductions, tax Accounting and.
OO Process Steps  Define requirements Allocate and Derive requirements Map requirements to use cases Map requirements to classes  Define use cases Draw.
1 Remote Monitoring System EIN Systems Environmental Intelligence Network Systems Remote Monitoring System - Requirements Specification - Welcome Mr. Ken.
Falcon Enterprises Welcome Mr. Jay Bebb & Mr. Brian Peppiatt.
11/28/06Preliminary Design1 Automated Excel Grading System Welcome Ms. Jami Cotler and Dr. Scott Hunter And Guests.
Track the different events in which individuals have participated in throughout the year Track the amount of credits any member has and their eligibility.
Alumni Spotlight Web System Preliminary Design by Initrode Solutions 12/01/2006.
Pear Software e-SATA (The Electronic Spreadsheet Automated Teaching Assistant) Requirements Specification.
Requirements Specification MAJIK Software Solutions 1 Virtual Network Device Mapping System Requirements Specification By MAJIK Software Solutions October.
11/30/2007SKYNET Preliminary Design Dynamic Network Device Mapping System (DNDMS) Preliminary Design By SKYNET Software.
School of Science Network Device Display System Requirements Specification by Orion Technologies Roger Bacon Hall Room 328 October 24, :15 AM.
Alumni Spotlight Web Systems Requirements Specification by Initrode Solutions 10/25/2006.
March 4, 2008Sonata Software - Detailed Design1 Dynamic Network Device Mapping System Preliminary Design Sonata Software Roger Bacon Hall Room 328 March.
Title. Preliminary Design2 Agenda Overview Life Cycle Model Data Flow Data Dictionary Constraints Prototype Summary.
Welcome to the Requirements Specification Presentation Mr. Jay Bebb & Mr. Brian Peppiatt.
Pear Software e-SATA (The Electronic Spreadsheet Automated Teaching Assistant) Preliminary Design.
FSH Technologies Preliminary Design: F.I.L.E.T. December 9, 2011.
Competitive Algorithm Calculation Testing in a Unified System (C.A.C.T.U.S.) Requirements Specification 11/2/2011 Presented By: ExoNET Solutions 1.
10/24/2007SKYNET Requirements Specification Dynamic Network Device Mapping System (DNDMS) Requirements Specification By SKYNET Software.
Competitive Algorithm Calculation Testing in a Unified System (C.A.C.T.U.S.) Preliminary Design 12/7/2011 Presented By: ExoNET Solutions 1.
Senior Design Group 10 – December 2010 Solution  Our solution to this problem was to design and build a web based application that can be run on the servers.
Senior Design 2010 Group 10.  Students  Nathan Dane  Jamin Hitchcock  Eric Tweedt  Advisor  Tien Nguyen  Client  Mary Greeley Medical Center 
Welcome to the Manage Flood Mapping – Setup Map Production module of the “MIP Release 3 Study Workflow Training” course! This module guides you through.
IT 499 Bachelor Capstone Week 8. Adgenda Administrative Review UNIT Seven UNIT Eight Project UNIT Nine Preview Project Status Summary.
Team Members ? ? Chintan Goswami Nirav Tank Project Guide ? ? Mrs. Darshana H. Patel [Internal] Mr. Manish I. Vora [External]
Šenaj Lelic, Managing Director, oneAssist UG, and Visio MVP Visio 2010 in Real Business: Improving the Design Productivity of Your IT and Engineering Diagrams.
Confidential and Proprietary © 2002 All rights reserved. October 19, 2015 Texas Market Notification Update.
Advanced Higher Computing SOFTWARE DEVELOPMENT PROCESS.
Friday, December 7 th 2012 Preliminary Design. IntroductionRestatement of ProblemProject ProgressionUser Case NarrativesUse Case DiagramDeployment DiagramWebsite.
Functional, Technical and Creative Specs and Web Navigation.
CCRS Comprehensive Conference Registration System Preliminary Design December 7 th,
1. Agenda Introduction Problem Restate Project Progression Use Case Narratives UML Use Case Diagram Data Flow Diagrams Functional Requirements Prototype.
Johnson Beck & Taylor. AGENDA  Accuracy, Thoroughness & Quality  Billable Hours  Effective Communication with Attorneys  The Client Comes First.
Capstone Project Phase Two! Design Phase – Functional Specification Document.
Preliminary Design By Phoenix Tech. Dr. Darren Lim Assistant Professor Department of Computer Science Siena College Mrs. Pauline White Visiting Instructor.
Activity 4 Data flow diagram of a school attendance system
Business Process Management
September, 2005Cardio - June 2007 Retrieve Information for Display (RID) and Retrieve ECG for Display (ECG)
Polsko-Norweski Fundusz Badań Naukowych / Polish-Norwegian Research Fund POST-INSPECTION INFORMATION FOLLOWING INSPECTION CARRIED OUT BY FUND OPERATOR.
Korea Connectathon 2011 Briefing Kyungpook National University IT Building #4 Room #106.
Data Flow Diagrams Often a good way of summarising sources and destinations of data and the processing that takes place Shows how data is transformed into.
CIAF Summary Report 2012/13 TPM Software within Good Spirit School Division.
U.S. Department of Agriculture eGovernment Program April 13, 2004 eAuthentication Initiative Employee Registration Process Screen Shots eGovernment Program.
شناخت مراجعه کننده و چگونگی گرفتن شرح حال باروری سالم.
Date of download: 5/30/2016 Copyright © 2016 SPIE. All rights reserved. The diagram of actors (boxes) and transactions (lines) used in the XDS-I.b profile.
Date of download: 5/30/2016 Copyright © 2016 SPIE. All rights reserved. The diagram of actors (boxes) and transactions (lines) used in the XDS-I.b profile.
As Is Future, Alaska & Providers ITOTS Working Group August 18, 2008.
Target Audience All QA members Objective: This presentation aims to deliver the following: Writing Test plans. Managing test cases repository as per.
EPICenter: Data Management Tool Geers, Dorothea Page 1 EPICenter E&P Data Management RWE Dea AG Geo Support Center Hamburg - Germany Dorothea Geers Geoscience.
Project Presentation Template (Replace this with title of your project) Designer Names.
BIS 220 Week 3 Individual Types of Electronic Commerce Activitya Resources: Types of Electronic Commerce Activity Complete the Types of Electronic Commerce.
CIHI’s New Learning Centre
G063 - Data flow diagrams.
Report Bullying Fill out the info on page 2
Thirteen Types of Graphics
تحلیل سیستم‌ها مدل‌سازی پردازشی.
G063 - Data flow diagrams.
Preliminary Design Presentation
Press Ad Screen-shot.
STORE MANAGER RESPONSIBILITIES.
More to Learn Viewing file details
Thing / Person:____________________ Dates:_________________
Martin Coetzer | Portfolio Architect, Microsoft Learning eXperiences
Join LinkedIn Groups.
Flow of reports Ops Managers GM Site Visit Engen Conv. Manager
Presentation transcript:

Agenda Functional Requirements Performance Requirements Data Flow Diagrams Screen Shots Summary Upcoming Dates

Functional Requirements Manage Duties Manage Activities Generate Reports Manage Archive Authenticate Manage Profiles

Data Flow Diagrams Source/Sink Process Data Flow Data Store

Screen Shots

Important Dates 11/1/02 – Requirements Specification Presentation 11/7/02 – Next Client Meeting 11/25/02 - Preliminary Design Documentation Delivered 12/4/02 - Preliminary Design Presentation