1 Business Processes BA 339 Mellie Pullman. 2 Littlefield Login Buy your code this week! Log onto:

Slides:



Advertisements
Similar presentations
Product Design & Process Selection-Manufacturing
Advertisements

Agenda of Week IX. Capacity and Process Capacity planning Midterm exam Capacity planning Review of week 8 12 Approaches Purposes : Finishing the capacity.
PROCESS SELECTION Chapter 4.
Production Systems Design Types of Production Systems.
MBA 570 Summer How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities.
Process Selection.
Process Choice and Layout Decisions in Manufacturing and Services
Process Choice and Layout Decisions in Manufacturing and Services Chapter 3.
Process Choice and Layout Decisions in Manufacturing and Services.
Entrepreneurs’ Boot Camp November 7, 2010 Stern Business Plan Competition Operations Management Plan.
OM&PM/Class 2a1 1Operations Strategy –Class 1a: Introduction to OM –Class 1b: Strategic Operational Audits 2Process Analysis –Class 2a: Process Flow Analysis.
Entrepreneurs’ Boot Camp October 5, 2008 Operations Management Plan Presented by Harry Chernoff Clinical Associate Professor of Operations Management.
Job Shop, Flow Shop, and Batch Processing. 2 Ardavan Asef-Vaziri Jan-1011Operations Strategy: 1- Introduction Facility Layout : Job Shop A C B D Product.
1 Manufacturing Processes BA 339 Mellie Pullman. 2 Process Choice & Layout.
Business Process A logically related sets of tasks or activities geared toward some business outcome. 1. Primary (value-added) 2. Support 3. Developmental.
1 IE Production Planning and Inventory Control Saif Benjaafar Industrial & Systems Engineering University of Minnesota.
Irwin/McGraw-Hill 1 Process Analysis Terms Process: Is any part of an organization that takes inputs and transforms them into outputs. Cycle Time: Is the.
OPSM 301 Operations Management Class 3: Process selection Koç University Zeynep Aksin
Operations Management
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Job Shop, Flow Shop, and Batch Processing. 2 Ardavan Asef-Vaziri Aug.-2013Product-Process Matrix Facility Layout : Job Shop A C B D Product 1 Output Input.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Chapter 6 Process Analysis.
1 © The McGraw-Hill Companies, Inc., 2004 Introduction (from Chase) Process Analysis.
1-1 1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved.
II. Operations Strategy and Process Choice
Operational Research & ManagementOperations Scheduling Flow Shop Scheduling 1.Flexible Flow Shop 2.Flexible Assembly Systems (unpaced) 3.Paced Assembly.
5.1 Production Methods IBBM.
Process Choice and Layout Decisions in Manufacturing and Services
Operations Management Dr. Ron Lembke.  Price / Quality / Speed?  Decoupling Point  Make to Stock – ready on the shelf – Breyer’s  Assemble to Order.
CHAPTER 12 DESIGNING THE DELIVERY PROCESS. 2 PROCESS INNOVATION IN SERVICE- DELIVERY SYSTEM n Initial Analysis – Customer for service : customer type.
Designing Goods and Services and Process Selection
Manufacturing Process Selection and Design
Manufacturing Processes
Chapter Objectives Be able to:
©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 7, Slide 1 Manufacturing Processes Engineering.
Process Choice and Layout Decisions in Manufacturing and Services
McGraw-Hill/Irwin  The McGraw-Hill Companies, Inc. 2007, All Rights Reserved PROCESS SELECTION Chapter 4.
Process (Job Shop) Layouts
© 2007 Pearson Education Process Strategy Chapter 4.
Chapter 6 Production Processes.
22/04/2017 Process selection.
ALL MCQS
Process Selection Chapter 3, Part 2. Intermittent Operations Intermittent operations: processes used to produce a variety of products with different processing.
Production.
1  Types of production systems. 2 Factors Influencing Process Choices  Volume: Average quantity of the products produced in a manufacturing system –Low.
McGraw-Hill/Irwin.
Process Selection Chapter 3, Part 2.
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 5 Manufacturing and Service Process Structures McGraw-Hill/Irwin.
Operations Management For Competitive Advantage 1 Process Analysis Operations Management For Competitive Advantage Chapter 4.
Designing Goods and Services and Process Selection Chapter 3.
Process Analysis I Operations -- Prof. Juran.
MBA.782.Mfg.ProcCAJ The Product Design Process Factors in Design Decision Process Types Process Flows Product-Process Matrix Break-Even Analysis.
Designing Goods and Services and Process Selection
OPERATIONS & TECHNOLOGY MANAGEMENT (JMP 5023)
Process Choice and Layout Decisions in Manufacturing and Services.
Operations Fall 2015 Bruce Duggan Providence University College.
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Master Production Scheduling (MPS) Slide Set #9.
1 ME Production Planning and Inventory Control.
Fundamentals of Production Planning and Control David Bolton, CFPIM, C.P.M. Materials Manager, Rotek, Inc. Past President, APICS.
Algorithm A procedure described by a series of steps. Click here for Hint project or algorithm or load distance?
Work-in-process (WIP) Inventory resulting from transformation of raw materials, but not yet ready for sale to consumers. Click here for Hint finished goods.
MIS Topic # 2 1 Demand Management. MIS Topic # 2 2 Definitions: Demand Management: the function of recognizing and managing all demands for.
OPSM 301 Operations Management Spring 2012 Class 3:Process Types
Chapter 3 MANAGING THE TRANSFORMATION PROCESS
Chapter 5 Process Analysis. Chapter 5 Process Analysis.
Supply Chain Management Principles
Process Design and Analysis
organizational structure
Presentation transcript:

1 Business Processes BA 339 Mellie Pullman

2 Littlefield Login Buy your code this week! Log onto: Enter “dollars” It will ask for your team name & password must consist only of numbers and lower case letters must not contain spaces or punctuation

3 After Game has started Oct. 8 at 5 PM, you will then logon with: We will look at the running factories on October 10 in class but you can make changes as soon as it starts on October 8.

4 Process Analysis Terms Process: Is any part of an organization that takes inputs and transforms them into outputs. Cycle Time: Is the average time needed to complete a business process. Utilization: Is the ratio of the time that a resource is actually activated relative to the time that it is available for use.

5 Process Throughput Rate or Flow Rate R Number of jobs (or customers) that flow through the system per unit of time. Cakes per hour Kitchen orders per shift Drive-in customers per day Process Throughput rate R = 1. Takt Time

6 Bottleneck Slowest activity or operation in system. Sets the pace for throughput rate of system.

7 Process Choice & Layout

8 Process Types (in order of decreasing volume) Continuous Flow Production Line Batch (High Volume) Batch (Low Volume) Job Shop Project

9 Continuous Flow Large production volumes High level of automation Basic material passed along, converted as it moves Usually very high fixed costs, inflexible

10 Production Line High-volume production of standard products or “design window”

11 Job Shop Low volume, one-of-a-kind products Job shops sell their capability Highly flexible equipment, skilled workers Equipment arranged by function

12 Batch I Somewhere in between job shop and line processes Moderate volumes, multiple products Production occurs in “batches”

13 Batch II Layout is a cross between that found in a line and that found in a job shop: Group Technology

14 Project Used when a product is: one-of-a-kind too large to be moved Resources moved to where needed Equipment, people, etc. are highly flexible Finite duration, often with deadline

15 Mixing Together the Process Types... Spindles Arms and Legs Seats BATCH for fabricating parts... ASSEMBLY LINE for putting together final product

16 Choosing a Process type Job ShopBatchLine Volume Variety Skills AdvantageFlexibilityPrice and Delivery

17 Product – Process Matrix One of a Kind Low Volume Multiple Products Moderate Volumes Few Major Products High Volume Commodity Products Job Shop Batch Line Very Poor Fit

18 What is “Customization”? An operations-centric view:

19 Customization Models Definitions: ETO – engineer to order MTO – make to order ATO – assemble-to-order MTS – make to stock Upstream: before the customization point, “off-line” activities Downstream: after the customization point, “on-line” activities

20 Make-to-Stock Planning Issues When, how much, and how to replenish stock at location Success Balancing level of inventory against level of service Other examples?

21 Assemble-to-Order Success comes from: Flexible Engineering design Modularity

22 ATO Planning Issues Options configurations (Smart Car) 8 different colors 2 different trims 2 different seats Possible combinations? Less finished good inventory & waste than MTS

23 Make-to-order or Engineer-to-order The Joinery

24 Difficulty versus Customization