M.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/2008 1 M. Apollonio – MICE Operations Manager University of Oxford MICE beam line commissioning.

Slides:



Advertisements
Similar presentations
1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
Advertisements

Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
K. Long, 18 April, 2015 Beam-line status — red sky at night?
Summary of MICE 4/4/2008 shift during the ISIS machine-physics period Goals for 04 Apr08 MICE shift: 1. Radiation survey in MICE Hall with target operating,
MICE TARGET OPERATION C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England.
ISIS Related Issues for MICE Adam Dobbs Proton Accelerator Development Meeting, RAL 24 th March /03/20111A. Dobbs.
MICE Beam Loss vs Particle Rate Adam Dobbs, ISIS Meeting, 18 th December 2009.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
MICE Particle Rate and ISIS Beam Loss Adam Dobbs, Target – ISIS Meeting, 17 th September 2010.
MICO Alain Blondel 17 March MICO Alain Blondel 17 March MICE target test-run March 2008 Friday 14/03/2008 6:00-> 18:00 Saturday 15/03/2008.
Paul drumm, mutac jan MICE Beamline Optics Design Kevin Tilley, RAL, 12th June MICE Needs Generic Solution Pion Injection & Decay Section (a) Inputs.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
March 2003 Paul Drumm MICE Collaboration Meeting, CERN 1 Beam Line & Installation Plans Paul Drumm CLRC Rutherford Appleton Laboratory.
124/3/2010CM26 - Riverside1 m. apollonio ( ,P) matrix.
Luminosity Monitor Commissioning MICE Collaboration Meeting March 2010 Paul Soler, David Forrest Danielle MacLennan.
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 14 September, 2009.
Target Test Report Given permission for a maximum of 5000 actuations. Performed 3679 actuations, 3654 with the gate valve open. Ran target at 0.4 Hz to.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (?
M. apollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Magnets Dry Run ISIS Scheduling Meeting Latest news on Target Ready to run ? Summary of: Magnets.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
1June 1 st 2009MICE CM24 - RAL1 MICE Beamline m. apollonio.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
MOM - M.ApollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Summary of MICE operations – 14/15 March 2008 AIMS - establish MICE beamline in ISIS synchrotron.
Commissioning needs: K.Long. Routine: LN2 bottle: –Needs to be sited in MICE Hall or outside vault so that routine checks of contents can be made.
CMPB Alain Blondel 14 April STATUS OF MICE.
1 MICE Beamline Design: General principles & expected capabilities Kevin Tilley, 16 th November Charge to beamline & desirable beam General principles.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 7 September, 2009.
MICE Video meeting Alain Blondel 7 December MICE -- what running strategy? reflections on steps I and II.
Physics Program and Runs: Autumn 2011 & Step IV V. Blackmore MICE Project Board, 08/03/12.
(+) session, PAC09 Vancouver – TH6PFP056 Introduction The Muon Ionisation Cooling Experiment (MICE, fig. 1c) at RAL[1]
Goals and Status of MICE The International Muon Ionization Cooling Experiment J.S. Graulich.
Particle Production in the MICE Beam Line Particle Accelerator Conference, May 2009, Vancouver, Canada Particle Production in the MICE Beam Line Jean-Sebastien.
MICE Beamline Commissioning Linda R. Coney NFMCC Meeting 16 January 2010.
Results from Step I of MICE D Adey 2013 International Workshop on Neutrino Factories, Super-beams and Beta- beams Working Group 3 – Accelerator Topics.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
MICE CM /10/ RAL1 M. Apollonio IC - London beam line optics.
MICE Step 1: First Emittance Results with Particle Physics Detectors Linda R. Coney EuCARD Meeting – 10 May 2011.
M. apollonio MICE Beamline summary. - Beamline parallel session (June 1 st ): - envisaged goals (Alain) - assess readiness of the line magnet status (Ken)
M.apollonioUKNF meeting - Trinity College, Oxford - 15/16 Sep M. Apollonio IC - London beam line optics.
Luminosity Monitor UKNF Meeting 7 June 2010 Paul Soler, David Forrest Danielle MacLennan.
Particle Production in the MICE Beamline IPAC10 Linda Coney, UC Riverside, Adam Dobbs, Imperial College London, Yordan Karadzhov, Sofia University The.
Linda R. Coney – 24th September 2009 MOM Update Linda R. Coney 24 September, 2009.
RAL Muon Beam Line Properties. ISIS 70 MeV H- injection Ring accelerates up to 800 MeV in about 10 ms 50 Hz cycle - Dual Harmonic System ~ 2 x 1.5 MHz;
MICE TARGET OPERATION C. Booth, P. Hodgson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 – The MICE Experiment2 - The.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
MICE Run Plan Sept/Oct 2009 m. apollonio – IC MACHINE PHYSICS USERs RUN NO SHIFT A B C D E.
MOM report: 08May May08 M. Apollonio, P. Kyberd, M. Ellis, K. Long.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
Running plan Step I.1 Basic radiation levels. I.1.1 ISIS running with beam elements on, target off, beam stop shut. Establish permanent MICE monitoring.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
Luminosity Monitor Design MICE Collaboration Meeting 31 May 2009 Paul Soler.
1June 2 nd 2009MICE CM24 - RAL1 m. apollonio Beamline+( ,P) matrix.
1 Updated Run Plans. K.Tilley, MICO, 07/02/08 - pre-commissioning - Target, - beamline functionality - detectors, particle production - decay solenoid.
Malcolm Ellis – Brunel University – 8th April The International Muon Ionization Cooling Experiment.
M. apollonio 7/7/2010CM27 - RAL11 Beam-Line Analysis …
1June 1 st 2009MICE CM24 - RAL1 Beamline Optics m. apollonio.
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
M.apollonioNuFact??1 ABSTRACT In the Muon Ionization Cooling Experiment (MICE) at RAL, muons are pro­duced and transported in a dedicated beam line connecting.
MICE Beamline Status m. apollonio 17 December 2009 MICE VC
MICE The International Muon Ionisation Cooling Experiment
MICE Operations Scenario Run 1
Luminosity Monitor Status
K. Tilley, ISIS, Rutherford Appleton Laboratory, UK Introduction
Presentation transcript:

m.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ M. Apollonio – MICE Operations Manager University of Oxford MICE beam line commissioning

m.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ goals and design: ∙ muon beam features ∙ target ∙ optics ∙ diffuser status of beam line remarks on target operation first MICE shifts [14-15/3, 29/3, 2/4, 4/4] conclusions layout

m.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ desired features P  = [140 MeV/c, 240 MeV/c],  p = +/- 10% easily tunable matched emittance: 1 mm rad <  N < 10 mm rad deliverable to MICE high purity muon beam high rate “600 muons” per target actuation [1 Hz, 1 ms window] acceptable losses for ISIS Beam Features Beamline Target Optics Diffuser Beamline Status Conclusions

m.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/  –  decay beam line adopted … inspired by previous projects PSI uE4 TRIUMF  beam lines RAL-RIKEN  beam line MICE beam line constituted by four parts 1.  production/capture 2.  decay/  capture 3.  transport  N generation / matching Beam Features Beamline Target Optics Diffuser Beamline Status Conclusions

m.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ Beam Features Beamline Target Optics Diffuser Beamline Status Conclusions  production/capture  decay  transport match to MICE

m.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ upstream beamline (in the synchrotron vault) a) target Station: p on titanium blade   + p high P   high P   small exit angle ~25 o b) 1 st Quadrupole Triplet Q1-Q2-Q3 first focussing: maximise acceptance before the decay solenoid c) 1 st Dipole D1 first momentum selection: 60 o bending B 1 [select  ]  B 2 [select  ] 1  production/capture Muon Beam Features Beamline Target Optics Diffuser State of Beamline Conclusion

m.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ Muon Beam Features Beamline Target Optics Diffuser State of Beamline Conclusion 2  decay channel   Maximise number of muons in decay section: highest decay solenoid field 5 T consistent with controllable  beam 25 o

m.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/  transport 4 highest  momenta  allow selection of 'backward' going  for higher purity & higher fluxes. Muon Beam Features Beamline Target Optics Diffuser State of Beamline Conclusion 99 %

m.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ match to MICE Muon Beam Features Beamline Target Optics Diffuser State of Beamline Conclusion Q4-Q9 define the optics prior to the diffuser diffuser used to inflate initial emittance in a controlled fashion variety of final configurations and several momenta  Five thicknesses of Pb  Changeable via remote control

m.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ Stepper motor Actuator Bellows New beam-pipe Target Station Top Bearing Bottom Bearing Magnets Coils Water Cooling Simplified Diagram of the Internal Mechanics Muon Beam Features Beamline Target Optics Diffuser State of Beamline Conclusion Sheffield University

m.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ Muon Beam Features Beamline Target Optics Diffuser State of Beamline Conclusion 10 ms 20 ms target working principle 1 ms titanium blade dipping at 1 Hz in the ISIS proton beam should intercept just ~1ms of ISIS accelerated beam withdrawal must be quick to avoid scraping next filling  extreme accelerations (80g) beam loss must comply with ISIS requirements

m.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ Muon Beam Features Beamline Target Optics Diffuser State of Beamline Conclusion target issues MICE target must operate with no harm for ISIS parasitic mode mechanical stress generated metal dust in the first target tests this required an improved design two new target stations are in preparation: T2a will be installed in the ISIS vault T2b will serve as a demonstrator to check T2a reliability (3x actuations) both should be ready in ~ 1 month MICE is presently allowed to produce beam losses < 50 mV on ISIS BLMs special care has been taken to cope with this limit

m.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ Muon Beam Features Beamline Target Optics Diffuser State of Beamline Conclusion [K. Tilley, MICE Beamline Review, IC 2007]  optics  optics

m.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ Muon Beam Features Beamline Target Optics Diffuser State of Beamline Conclusion determine thicknesses (T)   =1.4 mm rad x x’

m.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ Muon Beam Features Beamline Target Optics Diffuser State of Beamline Conclusion [MA, MICE Beamline Review, IC 2007] Diffuser Plates Thicknesses in ( ,P) space

m.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ Muon Beam Features Beamline Target Optics Diffuser State of Beamline Conclusion Oxford University

m.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ IC2: >29/3 IC1: 29/3 BM1: >29/3 GVA1: > 4/4GVA2: > 29/3 BM2:>29/3 Muon Beam Features Beamline Target Optics Diffuser State of Beamline Conclusion MICE beamline detector locations

m.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/  MICE has been given 5 shift times so far: 14-15/3, 29/3, 2-4/4 Summary of 14-15/3 shift operations: - power failure on D1 supply  no beam line  focus on target - Q1-3 inoperative - target successfully run in synchronization with the beam - depth and delay of target dip investigated to limit by any beam loss monitor reading <50 mV - limit reasonably stable and not oversensitive to dip depth - ran target at a good stable setting and a frequency of 50/128Hz (ISIS at 50Hz) - verified target hitting properly end of one ISIS fill without scraping following one - operation mode: MICE in parasitic mode. - radiation survey soon after shift (3679 target pulses) showed no significant increase in radiation - cabling for Beam Monitors and future detectors done - the successful operation of the target shows we can use it for our purposes with no harm for ISIS (parasitic mode): fundamental for future operations Muon Beam Features Beamline Target Optics Diffuser State of Beamline Conclusion

m.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ Muon Beam Features Beamline Target Optics Diffuser State of Beamline Conclusion Target Dip Depth and Delay

m.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ target depth vs time ISIS filling integrated BLM from ISIS MCR MICE target dipping into ISIS beam P. Hodgson no difference in beam loss at injection W or W/O target Muon Beam Features Beamline Target Optics Diffuser State of Beamline Conclusion

m.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ Summary of 29/3 shift operations: - D1, D2, Q4-5-6 powered and tested - Q6 showed water leak !  cut triplet out: only D1 and D2 to test proton selection - Beam Monitors (Fermilab) and Beam Counters (IC + Geneva) installed - D1 and D2 powered up: D1 set at 400 A, D2 scanned to find the maximum rate [4 ms gate] - use of remote control system to operate dipoles - first counts on beam monitors - first evidence of selected protons at the end of DSA - total actuations: ~ operations with dipoles and definition of particle transport from target to end of DSA (in agreement with calculations for selected momentum ~ 480 MeV/c) Muon Beam Features Beamline Target Optics Diffuser State of Beamline Conclusion

m.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ TARGET control Dipoles control Beam Monitor and IC counter displays

m.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/  Summary of 2-4/4 shifts operations: - GVA1 counter installed (with proper mu-metal shield) - Cherenkov counters ON - establish target depth and delay - re-establish dipole configuration (400A,170A) = 480 MeV/c - first pions in the Cherenkov counterA - start radiation survey - stopped! due to ISIS beam failure - re-establish previous conditions - survey: completed! - D2 scan [2 ms gate]: verify reproducibility - MICE detectors DAQ turned ON - radiation survey completed (main goal of these shifts)  no radiation detected [next page] - clear control of the dipole line - first pions seen in the Cherenkov - DAQ exercised - very preliminary estimates of POT (G4Beamline): order of per dip (2 ms) [need to check vs counter efficiency] - NB: 600 good muons require POT 2/4: ~2000 actuations 4/4: ~6000 actuations Muon Beam Features Beamline Target Optics Diffuser State of Beamline Conclusion

m.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/  Muon Beam Features Beamline Target Optics Diffuser State of Beamline Conclusion “Herewith radiation survey carried out on Friday 4 April with target dipping. Nothing obvious. But should re-measure with machine at 50 pps rather than at 50/32 pps, and also if increase extent of target dip.” MICE HALL RADIATION SURVEY. DATE: 04/04/2008 TIME: HRS BEAM STATUS: 1.6 Hz 5µa. MICE TGT: IN. MONITORS: NEUTRON MONITOR 5, RO-10 C726, TELETECTOR 612. ZONEµSV/HR nµSV/HR γ 1< <1 SURVEYOR: J.KENT from D. Findlay’s mail on MICE Radiation Survey

m.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ GVA2 beam monitor CKOV 1a PMT1 CKOV 1a PMT2 CKOV 1a PMT3 Muon Beam Features Beamline Target Optics Diffuser State of Beamline Conclusion  seen in the Cherenkov Detector April 2 nd 2008

m.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ Muon Beam Features Beamline Target Optics Diffuser State of Beamline Conclusion

m.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ D1 D2 Q4 Q1 Q2 Q3 DS Q5Q6Q7Q8Q9 cold test start: 21/4, electrical test to follow MICE magnet status 17/4/2008 superconducting solenoid Muon Beam Features Beamline Target Optics Diffuser State of Beamline Conclusion  Q9  Q8  Q7  Q6  Q5  Q4  D2  D1 Q3 Q2 Q1 commissionedRemote control Soak testPolarity check PS current Magnet cooling PS cooling Magnet completeted not completed to be done

m.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ Muon Beam Features Beamline Target Optics Diffuser State of Beamline Conclusion MICE Hall on 20/2/2008

m.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ Muon Beam Features Beamline Target Optics Diffuser State of Beamline Conclusion MICE beamline upstream section

m.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ Muon Beam Features Beamline Target Optics Diffuser State of Beamline Conclusion Mississippi Team at work [Cherenkov]Fermilab Team [Beam Monitors] … mice at work

m.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ Muon Beam Features Beamline Target Optics Diffuser State of Beamline Conclusion IC beam counter and Decay Solenoid entrance Installing Beam Monitors in the DSA

m.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ Muon Beam Features Beamline Target Optics Diffuser State of Beamline Conclusion summary ∙ a tremendous amount of work in the last few months ∙ all beam line magnets in place ∙ 3 quadrupole-triplets, 2 dipoles, decay solenoid ∙ first transported protons on March 29 th ∙ initial complement of beam line detectors in place … still a lot to be done next steps ∙ complete magnet commissioning ∙ commission T2a & T2b ∙ TOF0,1 installation ∙ diffuser commissioning ∙ remotely operable beam stop, collimators, correctors

m.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ Muon Beam Features Beamline Target Optics Diffuser State of Beamline Conclusion Acknowledgements many thanks to: RAL people (PPD, Cryogenics, Design, ISIS), MERIT contractors, Electrical contractors, Daresbury Lab, MICE collaborators … … and all who made this possible