Project Overview E911 Provisioning System Royal Flush Software

Slides:



Advertisements
Similar presentations
Making the System Operational
Advertisements

RNG – RSS News Generator Team Evensteven Phil LightBecky Vanderhoff Carol CoonLars Avery Madura MahenthiranChris Mamorella.
© ABB AB, Corporate Research - 1 5/19/2015 abb Project Breakdown Structure Creation.
1 RUP Workshop By George Merguerian Senior Partner Business Management Consultants
System Analysis and Design (SAD )
Kangaroo Software Use of Portlet Technology for Dynamic Generation of User Interfaces Jon Ferry Chris Helmeset Greg McGraw Jonathan Peffer.
0-1 Team # Status Report (1 of 4) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team #: Team Name.
Project Status E911 Provisioning System Royal Flush Software Kevin Francis, Jason Plaisted, Jessica St. Croix, Mike O’Connor, Derrick Hudson.
E911 Provisioning System Project Overview Royal Flush Software Kevin Francis, Jason Plaisted, Jessica St. Croix, Mike O’Connor, Derrick Hudson.
0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description.
MdH/IDt1March 11, 2003 Software Engineering Lesson 8 Project preparation Andreas Sjögren.
Harris JTRS Project The A-Team Garrett Wampole Ben Litchfield Jason Offord Jason Gillman David Bryant.
© 2005, Cornell University. Rapid Application Development using the Kuali Architecture (Struts, Spring and OJB) A Case Study Bryan Hutchinson
APPLICATION DEVELOPMENT BY SYED ADNAN ALI.
0-1 Team 1 Status Report (1 of 3) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team 1: Auto-Owners.
0-1 Team ?? Status Report (1 of 3) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team 1: Auraria.
Technion – Israel Institute of Technology Department of Electrical Engineering Software Lab Grades Server on J2EE Technology Edo Yichie Sagee Rosen Supervisor:
The Solution to Your Product Problems. Overview - What is PDS? ➲ Project Management System ➲ Web Based Easy to use Scalable ➲ Streamlined tools for software.
IMPORT WIZARD 491a Summer 2005 Roudabeh Moraghebi.
Jump to first page Medical Data Analysis/Record Broker Project Team Team Members: Leader: Tracy Giglio: Data Analysis  Kai Unewisse:
U-Mail System Design Specification Joseph Woo, Chris Hacking, Alex Benson, Elliott Conant, Alex Meng, Michael Ratanapintha April 28,
Software Design and Development Tool. The quality of our products come as result of the more of 50 successful years of combined experience of our technical.
CryptKeeper Project Plan 1 CryptKeeper Project Plan.
Planning Iteration Demo Suunto Training Program Planner.
IBM WebSphere Architectural Overview. Content Management ● Controlled by Java – Servlet – Enterprise Java Beans (EJB) – Java Server Pages (JSP) ● Base.
EXTENDING GIS INTO EMR Final Presentation. Project Team  Rahkiya Hawkins (Team Leader)  Cristian Andrade  Perry Estes  Steve Friedlander  Kevin Gravesande.
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
Copyright © Team # 2 CSCI 6838 Spring All Rights Reserved.1 Electronic Human Resource Management Software CSCI Research Project and Seminar.
MSE Presentation 3 By Padmaja Havaldar- Graduate Student
Course Presentation EEL5881, Fall, 2003 Project: Network Reliability Tests Project: Network Reliability Tests Team: Gladiator Team: Gladiator Shuxin Li.
IT 499 Bachelor Capstone Week 8. Adgenda Administrative Review UNIT Seven UNIT Eight Project UNIT Nine Preview Project Status Summary.
Introduction to J2EE Architecture Portions by Kunal Mehta.
® IBM Software Group © 2007 IBM Corporation J2EE Web Component Introduction
PROJECT SECME1 Carthik A. Sharma Juan Carlos Vivanco Majid Ali Khan Santhosh Kumar Grandai Software Engineering Fall 2002.
1 R.O.M.P Robot Orientation Mapping Project (Project Plan) Team Evolution Peri Subrahmanya: Lead Designer Michael Lazar: Project Manager Sean Hogan: Lead.
Project Presentation eProcurement System. M.TECH S16- Team S03 Institute of Systems Science Table of Content Project Background Project Requirement User.
T Final demo I2 Iteration Agenda  Product presentation (20 min) ‏  Project close-up (20 min) ‏ Evaluation of the results  Questions.
© Mahindra Satyam 2009 Configuration Management QMS Training.
UAH Course Scheduler 9/29/2011 Status Team Pegasus: John Gleason Julie Poole Steven Boyer.
MSE Presentation 1 By Padmaja Havaldar- Graduate Student Under the guidance of Dr. Daniel Andresen – Major Advisor Dr. Scott Deloach-Committee Member Dr.
BTW ”If you go, my advice to you” - Distributed Software Development.
9/23/2009 NOTICE! These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of.
Enterprise Java Beans. Model 1 J2EE – Web View Model/View/Controller Model View Control Data base Web Server Model One Architecture HTTP Request HTTP.
Software Life Cycle The software life cycle is the sequence of activities that occur during software development and maintenance.
Experiment Management System CSE 423 Aaron Kloc Jordan Harstad Robert Sorensen Robert Trevino Nicolas Tjioe Status Report Presentation Industry Mentor:
EFinanceFactory Andriy Kurhanevych, development group manager.
T Iteration Demo Team 13 I1 Iteration
Running Kuali: A Technical Perspective Ailish Byrne (Indiana University) Jonathan Keller (University of California, Davis)
Connecting with Computer Science2 Objectives Learn how software engineering is used to create applications Learn some of the different software engineering.
Oracle Warehouse Builder - Beta 1 New Features Jean-Pierre Dijcks.
© FPT SOFTWARE – TRAINING MATERIAL – Internal use 04e-BM/NS/HDCV/FSOFT v2/3 JSP Application Models.
Requirements Management Overview NIGMS Software Development.
Web-based Front End for Kraken Jing Ai Jingfei Kong Yinghua Hu.
29 September 2004Spartacus Computing Solutions1 Welcome Mr. Brian Smith, Siena College Webmaster & Ms. Kate Zimmerman, Siena College Academic Program Administrator.
Team-Based Development ISYS321 Managing the Information Systems Project.
T Project Review Muuntaja I1 Iteration
GW ToDo A Task Manager CSCI 6442 Project Spring, 2016.
1 Sean Aluoto Anthony Keeley Eric Werner. 2 Project Plan Overview Project Lifecycle model Time line Deliverables Organization plan Risk management Design.
Course Summary surveys.12.ppt CS 121 “Ordering Chaos” “Mike” Michael A. Erlinger.
Ashley Montebello Katie Githens Wayne Rowcliffe. Project Overview Create graduate student review system for ECpE department Review system is used by students.
Building J2EE Applications Based on Design Patterns with Business Components for Java Olivier LE DIOURIS Principal Product Manager Oracle Corporation.
What is J2EE?  Java J2ee developers on top of this provide the various kinds of services that are essential to develop large scale, allocated, component.
Yesdatabas Team Void Main. Team Members Daniel MeteyerMichael MartinCorey McClymondsPatrick Stetter.
Review of Definitions Software life cycle: –Set of activities and their relationships to each other to support the development of a software system Software.
Distributed Software Development Link Analysis Tool Project Plan Adrien Olivier Dominik Rojković Hassan Aziz Khan Petar Butković.
The Holmes Platform and Applications
J2EE Platform Overview (Application Architecture)
Introduction to J2EE Architecture
Design and Maintenance of Web Applications in J2EE
Our Process CMSC 345, Version 1/04.
Presentation transcript:

Project Overview E911 Provisioning System Royal Flush Software Kevin Francis, Jason Plaisted, Jessica St. Croix, Mike O’Connor, Derrick Hudson

Project Goals Provide E911 provisioning software for Paetec Communications Replace existing E911 software, fixing several known problems Update system to current technologies to improve maintainability

Description Rewrite PaeTec’s existing E911 provisioning software using J2EE, JSP, and Enterprise Java Bean technology Fix existing problems in, and make improvements to, the current database model Rewrite C++ code in Java for generating flat files for ILEC’s

Technology Technology being used Resin Enterprise Application Server Specified by PaeTec J2EE More extensible and flexible than C++ Enterprise Java Beans Increases scalability of system Java Server Pages Replaces no-longer-supported Oracle Web Design

Architecture Overview Verizon E911 Flat File E911 UI (JSP Pages) Verizon data record Ameritech E911 Flat File E911 Batch Data Extract (Java) Ameritech data record E911 Processing & Data Modeling (EJB based) PacBell data record PacBell E911 Flat File Other ILEC data record PaeTec E911 Local Database Other ILEC E911 Flat File

Color Denotes Deliverables Schedule Date Action / Deliverables Weeks 1-3 Examine existing system and documentation Week 3 Create Project Plan Weeks 4-5 Gather Requirements / Software Requirements Document Week 6 Revised Data Model Week 7 Architecture Document Week 9 Design Document Week 10 Begin Implementation Week 12 Begin Testing Week 18 Beta Software Complete Week 19 Conclude Testing Week 20 Presentation & Post Mortem, Deliver Final Product Color Denotes Deliverables

Risks E911 Related Software Resin Enterprise Application Server Time Leaves little-to-no room for error Resin Enterprise Application Server New tool to all members of the development team Time Extremely strict deadline

Team Jon Templin Kevin Francis Jason Plaisted Michael O’Connor PaeTec Contact, Customer Kevin Francis Development Team Leader Jason Plaisted Planning Leader Michael O’Connor Configuration Manager Jessica St. Croix Development Leader Derrick Hudson Testing Leader

Current Status High-level Overview of Progress Project Plan created and is being maintained Requirements Gathering is commencing and on-track Prototype for the user interface is under development Revised data model is almost ready

Questions