Total Current Draw of CDC Total CDC current(8400 wires) has kept about 1mA at the maximum beam current for each years. Vacuum condition is improving from.

Slides:



Advertisements
Similar presentations
BigBite Wire-Chamber Status Report Brandon Craver University of Virginia Hall A Collaboration Meeting June 23, 2005.
Advertisements

Backwards Compatibility L4 – L2 W. Weterings LBCC - 14.
Background issues in the KEKB
Recent observations of collective effects at KEKB H. Fukuma, J. W. Flanagan, S. Hiramatsu, T. Ieiri, H. Ikeda, T. Kawamoto, T. Mitsuhashi, M. Tobiyama,
PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
September 15th 2009Olympus technical review at DESY, F.Brinker1 DORIS storage ring Olympus in the IP-region Beam optic, changes on the lattice Beam dimensions,
Gas-based tracking for SuperBelle Beam background Upgrade plan Summary Shoji Uno (KEK) April, 20-22, nd Joint Super B factory WS in Hawaii.
CMS Physics Meeting, Dec. 6, Analysis Note on the Validation of the ORCA Simulation of the Endcap Muon CSC Front-end Electronics S. Durkin -- Ohio.
Drift chamber for super-Belle Present performance and background Idea for upgrade Upgrade plan Summary Shoji Uno (KEK) Jan-20 th, 2003 at Super B-factory.
DCZ status & results B A B AR Trigger Workshop, December 2004 Jamie Boyd University of Bristol for the Trigger Upgrade Group.
April 6th 2009Olympus Meeting at DESY, F.Brinker1 Vacuum system Available beam scraper Beam dimensions, Target cell Machine Studies on February 7 th 2009.
D. Peterson, “ILC Detector Work”, Cornell Group Meeting, 4-October ILC Detector Work This project is supported by the US National Science Foundation.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
Large Cell Scope Pictures, Part II HV Gnd 1nF Large Cell Tube Anode signal Phi Cathode signal scope S1 S2 S1 S2 This is a follow-up on Richard’s measurement.
CDC Scrutineer Talk Elliott Wolin GlueX Collaboration Meeting Jefferson Lab 9-Sep-2004.
Operational Experience with machine backgrounds at KEKB 23 September 2003 T.Tsuboyama (KEK)
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
The GlueX Detector 5/29/091CIPANP The GlueX Detector -- David Lawrence (JLab) David Lawrence (JLab) Electron beam accelerator continuous-wave (1497MHz,
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
1/18 The Distribution of Synchrotron Radiation Power in the IR C. H. Yu IR Overview SR Distribution in the IR The Protection of SR Power.
IP-BSM Improvement Work N. Terunuma 2012/6/26 ATF2 Project Meeting.
Super Belle CDC Basic design Electronics  Test of pre-amplifier chips Wire stringing method Schedule Shoji Uno (KEK) Dec-12 th, 2008.
Xiao-Yan Zhao Beam Instrumentation Group Accelerator Center, IHEP BEPCII Background Issues: Beam Loss Measurement.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
Air Ballooning in Senior Math Class mathematics Big ideas / guiding questions Be able to do Assessment introduction big ideas design questions.
Zian Zhu Magnet parameters Coil/Cryostat/Support design Magnetic field analysis Cryogenics Iron yoke structure Mechanical Integration Superconducting Magnet.
TPC Design Concept: From MicroBooNE to LAr20
Malte Hildebrandt, PSIMEG - Review Meeting / 1   e  Drift Chambers Charge Division Test Chamber Testsetup for Cosmics Chamber Construction.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
マイクロメッシュを用いた 高増幅率型 μ-PIC の開発 Development of  -PIC using micro mesh 1. Introduction 2. Test operation of prototype 3. Simulation studies 神戸大学 越智 敦彦、桂華.
CDC S. Uno KEK Endplate Design sBelle 250mm 300mm 350mm.
Tsukuba-hall webcam 1 Beam Pipe and Vertex Detector extraction: on Nov. 10, 2010 Belle Detector Roll-out: Dec. 9, 2010 End-caps, CDC, B-ACC, TOF extraction:
E. Richards EE Chamber installation. Summary Position Of the EE chambers General view of EEL chambers EEL5 chamber Installation of other chambers ex.
ICT Module 4 Revision. ICT Attenuation and cable type What is attenuation What cable should be used between buildings and why?
CLAS12 Drift Chamber Prototyping
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
August 4-5, 2004 PEP-II Post Run 4 Review 1 M. Sullivan PEP-II Post Run 4 Review August 4-5, 2004 IR Summary and Issues.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
CDC Upgrade Beam background Simulation study Idea for upgrade Upgrade plan Summary Shoji Uno (KEK) Mar-20 th, 2008.
Differential Signal Path for 64 ch ZTF Mosaic Roger Smith and Stephen Kaye California Institute of Technology.
Performed at Brookhaven National Lab for Fermilab Main Injector Electron Cloud Studies June 2009 Linda Valerio September 11, 2009.
CdTe prototype detector testing Anja Schubert The University of Melbourne 9 May 2011 Updates.
After Protons from RCS 1 st DeeMe Collaboration Meeting Dec. 10, 2012 Kazami Yamamoto J-PARC Center Accelerator Division.
Compton Gamma-ray Generation Experiment by Using an Optical Cavity in ATF POSIPOL 2007 Workshop at LAL Hirotaka Shimizu Hiroshima University.
E+/e- Backgrounds at BEPCII/BESIII JIN Dapeng Aug. 22, 2011.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
High intensity electron beam and infrastructure Paolo Valente * INFN Roma * On behalf of the BTF and LINAC staff.
1 straw tube signal simulation A. Rotondi PANDA meeting, Stockolm 15 June 2010.
PreShower Characterisations
BEAM LOSS MONITORING SYSTEM
Acceptance test at Duke
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
Future Plan of the Neutral Kaon Spectrometer 2 (NKS2) Experiment
BoNuS: Radial-Drift TPC using Curved GEMs
eXtremely Fast Tracker; An Overview
Introduction to the Backgrounds Study in the BEPCⅡ/BESⅢ
CDC Structure S. Uno KEK
THE NEW FOCAL PLANE POLARIMETER
BEAM LOSS MONITORING SYSTEM
Single atom point contact when the wires bounce out of contact.
Adjusting the dcdrift.param
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
Pad Response Function Nuclear Physics Group Institute of Physics, Academia Sinica Jia-Ye Chen
MEG II実験 液体キセノン検出器の建設状況
Global chip connections
Differential Signal Path for 64 ch ZTF Mosaic
Status report MEG DC 20/6/06 Test in COBRA Hajime,Matthias,Johny Peter : beam, Wataru : COBRA Necessary Modifications in DC.
Distributions of cross-correlation coefficients between concurrent D call audio and tri-axial accelerometer signals. Distributions of cross-correlation.
Presentation transcript:

Total Current Draw of CDC Total CDC current(8400 wires) has kept about 1mA at the maximum beam current for each years. Vacuum condition is improving from year to year. Better masking system has been adopted for fixed masks near IP and movable masks in arc section.

Small Cell Drift Chamber

Small Cell Chamber Installation of the small cell chamberAfter removing Removing the cathode chamberJust after wire stringing

Small cell chamber is working. Hit histogram for layer 1, 2 and 3

XT Curve & Max. Drift Time Small cell(5.4mm) Normal cell(17.3mm)

Cross talk Signal cables between feed- through and preamp were replaced co- axial cables in order to reduce the cross talk during summer shutdown. Pulse Height Exp 31 Exp 27