Operations Management & Performance Modeling

Slides:



Advertisements
Similar presentations
What other terms can you think of when talking about Procurement and Inventory Management?
Advertisements

Dr. A. K. Dey1 Inventory Management, Supply Contracts and Risk Pooling Dr. A. K. Dey.
Determining the Optimal Level of Product Availability
MBPF1 Managing Business Process Flows: Supply Chain Management Module Managing the Supply Chain Economies of Scale (Chapter 6) Managing Flow Variability:
Managing Facilitating Goods
Supply Chain Management
OM&PM/Class 5b1 1Operations Strategy 2Process Analysis 3Lean Operations 4Supply Chain Management –Class 5a: Inventories & Economies of Scale –Class 5b:
Supply Chain Management
OM&PM/Class 1b1 1.Operations Strategy –Class 1a: Introduction to Operations –Class 1b: Strategic Operational Audits »Strategic Operational Audit »Shouldice.
Supply Chain Management Module
Supply Chain Management Managing the between all of the parties directly and indirectly involved in the procurement of a product or raw material.
1 Process Management and Strategy Introduction 1Ardavan Asef-Vaziri Sep-09 Process -1 Business Process Management Building block of Operations Management.
OM&PM/Class 2a1 1Operations Strategy –Class 1a: Introduction to OM –Class 1b: Strategic Operational Audits 2Process Analysis –Class 2a: Process Flow Analysis.
Enterprise Business Processes and Applications (IS 6006) Masters in Business Information Systems 9 th Dec 2008 Fergal Carton Business Information Systems.
Operations Management & Performance Modeling
1 Supply Chain Management Supplemental to Chapter 6 Partnership (TEC5133)
Supply Chain Management Managing Material Waiting Time
Supply Chain Management Lecture 27. Detailed Outline Tuesday April 27Review –Simulation strategy –Formula sheet (available online) –Review final Thursday.
Distribution Strategies
OM&PM/Class 6b1 1Operations Strategy 2Process Analysis 3Lean Operations 4Supply Chain Management 5Capacity Management in Services –Class 6b: Capacity Analysis.
1–11–1. 1–21–2 Chapter 16 Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
ISQA 458/558 Distribution & Replenishment Professor Mellie Pullman.
The Value of Information Phil Kaminsky David Simchi-Levi Philip Kaminsky Edith Simchi-Levi.
Supply Chain Management Module
Reasons for Inventory To create a buffer against uncertainties in supply & demand To take advantage of lower purchasing and transportation cost associated.
Supply Chain Drivers and Metrics
E-Commerce and Supply Chain Management (SCM)
Buying Merchandise Pricing Merchandise 2. Buying Merchandise Pricing Merchandise 2.
12-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e Global Edition 1-1 Copyright ©2013 Pearson Education. 1-1 Copyright.
The Impact of the Internet on Supply Chain Management Including some excerpts form David Simchi-Levi Professor of Engineering Systems Massachusetts Institute.
Supply Chain Management
Global Sourcing and Procurement. 1. Understand how important sourcing decisions go beyond simple material purchasing decisions. 2. Demonstrate the “bullwhip.
Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved GLOBAL SOURCING AND PROCUREMENT Chapter 11.
Postponement How to respond to demands for –Customized products –Rapid delivery –Competitive prices in the face of short product lifecycles.
Managing Business Process Flows: Ch 6 Supply Chain Management
Chapter 12: Determining the Optimal Level of Product Availability
Chapter 3 Supply Chain Drivers and Obstacles
Inventory/Purchasing Questions
Slides 6 Distribution Strategies
Contents Introduction
Managing Uncertainty in Supply Chain: Safety Inventory Spring, 2014 Supply Chain Management: Strategy, Planning, and Operation Chapter 11 Byung-Hyun Ha.
Distribution Strategies Chap 05 王仁宏 助理教授 國立中正大學企業管理學系 ©Copyright 2001 製商整合科技中心.
Product Availability.
Inventory Management and Risk Pooling (1)
OM6-1Supply Chain Management Chapter 12 Supply Chain Management.
SUPPLY CHAIN MANAGEMENT SYSTEMS Part I. 7-2 LEARNING OUTCOMES 1.List and describe the components of a typical supply chain 2.Define the relationship between.
1 1 Forecasting and Logistics John H. Vande Vate Fall, 2002.
Introduction to Supply Chain Management Designing & Managing the Supply Chain Chapter 1 Byung-Hyun Ha
3-1Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Course Code MGT 561 Supply Chain Management Book: Supply Chain Management Strategy,
13-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Course Code MGT 561 Supply Chain Management Book: Supply Chain Management Strategy,
Homework 1- Gateway.
Chapter 16: Global Sourcing and Procurement
Global Sourcing and Procurement
Distribution Strategies
Chapter 3 Supply Chain Drivers and Obstacles
Chapter 3 Supply Chain Drivers and Obstacles
Chapter 18 Managing Facilitating Goods
McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved.
Determining Optimal Level of Product Availability
Supply Chain Management (SCM) Basics
Optimal Level of Product Availability Chapter 13 of Chopra
Chapter 12 Determining the Optimal Level of Product Availability
Chapter 3 Supply Chain Drivers and Obstacles
Determining Optimal Level of Product Availability
Chapter 14 Sourcing Decisions in a Supply Chain
Chapter 3 Supply Chain Drivers and Metrics
Chapter 14 Sourcing Decisions in a Supply Chain
Chapter 3 Supply Chain Drivers and Obstacles
Presentation transcript:

Operations Management & Performance Modeling 1 Operations Strategy 2 Process Analysis 3 Lean Operations 4 Supply Chain Management Class 5a: Inventories & Economies of Scale Class 5b: Dealing with Uncertainty & role of Centralization Class 6a: Supply Chain Design Multi-product Pooling: Postponement & Commonalities Benetton Accurate Response 5 Capacity Management in Services 6 Total Quality Management 7 Business Process Reengineering OM&PM/Class 6a

Postponement & Commonality: HP Laserjet Generic Power Production Unique Power Process I: Unique Power Supply Europe N. America Transportation Process II: Universal Make-to-Stock Push-Pull Boundary Make-to-Order OM&PM/Class 6a

HP LaserJet: European DC Safety Stocks (2 month Lead time) OM&PM/Class 6a OM&PM/Class 6a

HP LaserJet: The Effect of Aggregation Total European safety stock with 2 month lead time = 26,409 units. Total European safety stock with 2 month lead time on aggregation = 17,661 units. Reduction = 8,749 units (33%). OM&PM/Class 6a

Variety and Marketing/Operations Braking system Transmission Electrical design Chassis design Exterior body panels Engine block Front & rear seats Floor mats Airbags & antilock system Rear-view mirrors Dashboard layout Headlights Cup holders Remote keyless entry Consumer Hierarchy Score Technical Hierarchy Score Low High Source: Mohan Sawhney OM&PM/Class 6a

United Colors of Benetton Production Process OM&PM/Class 6a

Benetton Extra Cost of Postponement factory shipments woolen items $311M x 60% = $186.6M Labor and O/H costs woolen items 6.6% + 21.8% (assuming half of O/H from Exh. 1) = 28.4% $186.6M x 28.4% = $53.0M If 10% of items are dyed to order at 10% extra cost $53.0M x 10% x 10% = $0.53M OM&PM/Class 6a

Benetton Inventory Benefits of its Strategy Inv. Turns = Avg. Throughput (COGS)/Avg. Inventory Inventory Reduction = ($67.9-$38.875)M = $29.025M Savings in inventory carrying costs (@25%) = $7.256M OM&PM/Class 6a

Benetton Profitability of Agents (FY 81) Commissions (4% on shipments) $311M * 4% / 70 agents = $178K / agent Earnings on Shop Sales (10% ownership) Sales = $311M * 180% (markup) * 37/44 (realized markup) = $471M NIBT = $471M*19% = $89M 10% ownership = $8.9M/70 agents = $128K / agent Total = $306K / agent OM&PM/Class 6a

Benetton Profitability of Retailers/Franchisees (FY 81) Store Sales = $305K NIBT = 19% * $305K = $58K Less agent’s share ($5.8K) = $52K OM&PM/Class 6a

Postponement and Re-assortment: The Advantage to Forecasting Actual total sales 500 1000 1500 2000 2500 3000 3500 4000 500 1000 1500 2000 2500 3000 3500 4000 500 1000 1500 2000 2500 3000 3500 4000 Initial Forecast Updated Forecast after observing 20% of sales after 80% Each data point represents the forecast and the actual season sales for a particular item (at the style-color level). OM&PM/Class 6a

Take-Away’s: Benetton is an example of how to manage an entire supply chain and make it profitable for all entities in the chain (suppliers, Benetton, agents, retailers) by tailoring its operational response very carefully: Step 1. Reduce S, L, variability: the basics: implement everywhere in supply chain: highest pay-back Step 2. Centralization intermediate: trick is in the implementation: medium pay-back Step 3. Partial postponement flexibility last step: need this on only a small set of products & processes and meshing it with financial and marketing response. OM&PM/Class 6a

Accurate Response to Demand Uncertainty when you can order only once: L.L. Bean L.L. Bean is planning the order size for winter parkas. Each parka costs the company $70 and sells for $140. Any unsold parkas at the end of the season are disposed off by a sale at $40. Using historical data and a feel for the market, L.L. Bean forecasts the winter season demand: Demand: 21 22 23 24 25 26 27 28 Probability: 3% 4% 5% 8% 10% 15% 12% 10% Demand: 29 30 31 32 33 34 35 Probability: 9% 6% 5% 4% 4% 3% 2% How many parkas should L.L. Bean plan (make/order)? ........................................................................................................................................................................................................................................ ........................................................................................................................................................................................................................................ ........................................................................................................................................................................................................................................ OM&PM/Class 6a OM&PM/Class 6a

Accurate Response: Find optimal order level Q with Excel OM&PM/Class 6a

Accurate response: Find optimal Q from formula Cost of overstocking by one unit = Co the out-of-pocket cost per unit stocked but not demanded “Say demand is one unit below my stock level. How much did the one unit overstocking cost me?” E.g.: purchase price - salvage price. Cost of understocking by one unit = Cu The opportunity cost per unit demanded in excess of the stock level provided “Say demand is one unit above my stock level. How much could I have saved (or gained) if I had stocked one unit more?” E.g.: retail price - purchase price. Given an order quantity Q, increase it by one unit if and only if the expected benefit of being able to sell it exceeds the expected cost of having that unit left over. At optimal Q, do not order more if Prob( Demand > Q ) < Co /(Co + Cu ). OM&PM/Class 6a

Wal-Mart Logistics structure Strategic goals Operations strategy Electronic data interchange Communication between retail stores Bar coding Cross docking Fast responsive transportation system Long lead time items Stored at DC and shipped as needed Stable demand items Continuous replenishment programs Short lead time items Made to order and cross-docked at DC Strategic goals Provide customers access to quality good, when and where needed at competitive prices Operations strategy Short cycle times Low inventory levels Logistics strategy Accurate information availability Rapid transportation OM&PM/Class 6a

Class 6a: Learning Objectives Pooling of stock reduces the amount of inventory physical information specialization substitution commonality/postponement Benetton: Tailored response (e.g., partial postponement) can be used to better match supply and demand Accurate Response in one-shot inventory management under uncertainty trade-off cost of over and understocking Single product Multi product OM&PM/Class 6a