SECCHI – Sun-Earth Connections Coronal and Heliospheric Investigation SECCHI Synoptic and Special Observing Programs Simon Plunkett SECCHI Operations Lead.

Slides:



Advertisements
Similar presentations
Operations Management
Advertisements

SECCHI Flight Software Dennis Wang SECCHI Consortium Meeting July RAL CPU Utilization Memory Usage VxWorks H/W.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
Questions from the European colleagues & Answers (only) from the Chinese engineers present for Y.-W. Zhang and S.-G. Yuan Chinese Academy of Space Technology.
PHEOS PSRR Concept of Operations. 2 Scope The purpose of the PCW-UVI Concept of Operations (ConOps) is to communicate how mission systems will operate,
Sun Earth Connection Coronal and Heliospheric Investigation STEREO and SECCHI Status Consortium Meeting, Abingdon July 2001 Russ Howard.
SECCI/COR2 Status Report SECCHI CONSORTIUM MEETING D. Socker, S. Plunkett, A. Vourlidas.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center Phase E Kickoff Meeting February 23, 2007.
STEREO Space Weather Beacon: December 2003 D.A. Biesecker NOAA/SEC.
SECCHI_CDR_HW_Overview.1 Discussion of Synoptic Program and Use of SSR2 SECCHI Consortium SECCHI Consortium meeting 7 March 2007 Univ. Paris XI.
Flight Software Image Compression and Status Dennis Wang Interferometrics/NRL SECCHI Flight Software Lead Paris Mar 5-9, 2007.
CXC Chandra X-ray Observatory Operations. CXC Overview 1. Mission and Observatory Description 2. Chandra Operations 3. Chandra X-ray Center Architecture.
2007 March 61 The SECCHI Campaign Jean-Pierre Wuelser SECCHI Consortium Meeting Orsay.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
Advanced Technology Center 1 HMI Rasmus Larsen / Processing Modules Stanford University HMI Team Meeting – May 2003 Processing Module Development Rasmus.
Technical Performance Measures Module Space Systems Engineering, version 1.0 SOURCE INFORMATION: The material contained in this lecture was developed.
STEREO Science Center SWG – Dec 2004 William Thompson NASA Goddard SFC Code Greenbelt, MD
STEREO Science Center SWG – May 2005 William Thompson NASA Goddard SFC Code Greenbelt, MD
STEREO Science Center William Thompson NASA Goddard SFC Code Greenbelt, MD
1 Interpreting SECCHI White Light Images: FOV Sensitivity & Stereo Viewing Paulett Liewer, JPL; Russ Howard & Dennis Socker, NRL SECCHI Consortium Meeting.
ZTF Server Architecture Roger Smith Caltech
7/12/20011 Observing Sequences in View of the SECCHI Science Goals From the EUVI Perspective J-P. Wülser.
NASA’s Goddard Space Flight Center LRO Operations Concept Richard Saylor Jr. HTSI/Code 444 August 16-17, 2005.
“Joint planning” session Preliminary instrument operation & science plans of SOT/XRT/EIS for several months after the launch. Instrument checkout and Performance.
The 8253 Programmable Interval Timer
MICROPROCESSOR INPUT/OUTPUT
MG 1/10/01 1 PCS SMOV-3B Review Objectives Overview Activity Descriptions Requirements.
STEREO - Solar Terrestrial Relations Observatory Mission STEREO STEREO Science Team Meeting May 2, 2005 Presented by Edward Reynolds APL STEREO Project.
18-April-2006XRT Team1 Initial Science Observations Solar-B XRT Ed DeLuca for the XRT Team.
Heliospheric Imager – Scientific Operations  HI Operations Document – R. Harrison  HI Image Simulation – C. Davis & R. Harrison  HI Operations Scenarios.
Final Version Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Mission Operations Tim Rykowski Jeffrey Hosler May 13-17, 2002.
Instrument Performance Spefication 13 July 2001 SECCHI Consortium Meeting Cosner’s House, Abington Dan Moses.
195 Å image – behind 195 Å image – Sun- Earth line – SOHO/ EIT image 195 Å image – Sun- Earth line – SOHO/ EIT image 195 Å image – ahead SECCHI Extreme.
Solar B Mission Operations Working Group - 3 February Page 1 SS Instrument Operations for TIMED, Cluster, & Stereo C. P. Holmes Sun-Earth Connection.
Heliospheric Imager – Scientific Operations  HI Operations Document – R. Harrison (presented by Dave Neudegg – SciOps for Cluster, Mars Express, Double.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG April 2008 Meudon, France.
Advances in Space Imaging Russell A. Howard Naval Research Laboratory NSF Workshop on Small Missions, May 2007.
Space Operations as a Guide for a Real-World Scheduling Competition Eduardo Romero Marcelo Oglietti
GLAST Science Support CenterNovember, 2005 GSSC User Committee Meeting Tools for Mission and Observation Planning Robin Corbet, GSSC
2007 March 51 EUVI Early Observations Jean-Pierre Wuelser James Lemen Markus Aschwanden Nariaki Nitta.
Michael L. Kaiser STEREO Project Scientist NASA/Goddard Space Flight Center STEREO June 11, 2008 STEREO at 1.4 years.
CE Operating Systems Lecture 2 Low level hardware support for operating systems.
William Thompson L-3 Communications NASA Goddard Space Flight Center STERE The STEREO Science Center.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG March 27-28, 2007.
STEREO - Solar Terrestrial Relations Observatory Mission SECCHI Calibration Activities Simon Plunkett SECCHI Operations Scientist Naval Research Laboratory.
Telemetry Constraints during Early Operations The STEREO telemetry rate is restricted during the phasing orbits due to S/C RF interference with each other,
CE Operating Systems Lecture 2 Low level hardware support for operating systems.
Unit III Bandwidth Utilization: Multiplexing and Spectrum Spreading In practical life the bandwidth available of links is limited. The proper utilization.
Michael L. Kaiser STEREO Project Scientist NASA/Goddard Space Flight Center STEREO May 2, 2008 STEREO at 1.25 years.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG November 2007 Pasadena, California.
SECCHI Status Russell A. Howard & The SECCHI Team March 2010 STEREO SWG – Trinity College, Dublin.
P. Mokashi IES Team Meeting, SwRI 29 May IES (SwRI) Develop sequences (flight and EQM test) Develop tables, macros and patches if necessary Test.
5 th SECCHI Consortium Meeting Orsay, France March 5-8, 2007 SECCHI Planning and Scheduling Ed Esfandiari NRL/Interferometrics, Inc.
IMPACT Conjunction and Sidelobe Operations Janet Luhmann, Dave Curtis, Peter Schroeder, Dick Mewaldt and the IMPACT Team July 2, 2014.
1 Pruning of Ensemble CME modeling using Interplanetary Scintillation and Heliospheric Imager Observations A. Taktakishvili, M. L. Mays, L. Rastaetter,
1 Determination of CME 3D Trajectories using Stereoscopy STEREO CMES of 16Nov2007 and 31AUG2007 P. C. Liewer, E. M. DeJong, J. R. Hall, JPL/Caltech; R.
EIS Operation Planning H. Hara (NAOJ) 2007 Dec 10.
GLAST Large Area Telescope:
COR1 Current Status and Future Plans
First Assessments of EUVI Performance on STEREO SECCHI
LRO Mission Operations Concept
Launch and On-orbit Checkout
Instrument Performance Requirements
Net 323 D: Networks Protocols
The STEREO Space Weather Broadcast
8253 – PROGRAMMABLE INTERVAL TIMER (PIT). What is a Timer? Timer is a specialized type of device that is used to measure timing intervals. Timers can.
MDP / DHU - DR Usage vs downlinks -
COMP755 Advanced Operating Systems
N. Nitta1, J.-P. Wuelser1, J. Lemen1, M. Aschwanden1, G. Attrill2
Presentation transcript:

SECCHI – Sun-Earth Connections Coronal and Heliospheric Investigation SECCHI Synoptic and Special Observing Programs Simon Plunkett SECCHI Operations Lead SECCHI Consortium Meeting Orsay, France March 5-8, 2007

SECCHI – Sun-Earth Connections Coronal and Heliospheric Investigation SECCHI Operations Team S. Plunkett (Operations Lead) N. Rich (Ground Systems Lead) D. Wang (Flight Software Lead) L. McNutt (Operator) K. Battams (Operator) E. Esfandiari (Planning/Scheduling) R. Baugh (Program Manager) J. Newmark (Science Planning) You!

SECCHI – Sun-Earth Connections Coronal and Heliospheric Investigation SECCHI Science Objectives

SECCHI – Sun-Earth Connections Coronal and Heliospheric Investigation Concept of Operations STEREO Mission Operations Center (MOC) is located at APL in Laurel, MD. SECCHI Payload Operations Center (POC) is located at NRL in Washington, DC. –During commissioning and at times of emergencies, the POC will temporarily relocate to APL as necessary. STEREO Science Center is located at NASA GSFC in Greenbelt, MD. MOC and POC will be staffed 8 hours per day, 5 days a week, during normal business hours. SECCHI will operate primarily in a ‘synoptic’ mode, with identical observing programs coordinated between the two spacecraft. –Additional special observations will be scheduled as needed, for example as part of coordinated campaigns. –Light travel time difference between spacecraft is handled by an adjustable constant on each spacecraft (zero for Ahead). One ground contact period per day for each spacecraft, lasting from 3.5 to 5 hours. –Contact periods can occur at any time of the day. –Daily command loads must be prepared in advance, and delivered to MOC at least 8 hours in advance of the pass.

SECCHI – Sun-Earth Connections Coronal and Heliospheric Investigation Planning cycle has multiple stages, with more detailed plans established at each stage: –Quarterly SWT meetings for long-range scientific planning. –Monthly teleconferences to allocate observing sessions to specific programs. –Weekly ‘virtual meetings’ to coordinate instrument timelines and produce detailed plans. Similar observing plan will be carried out every day in any given week: –Structures take about two weeks to cross solar disk. –STEREO spacecraft separate at about 1 degree/week. Observing plan for one or more days is generated by the operator using the SECCHI planning tool and will be uploaded daily to both spacecraft: –Default observing program will be executed by flight software in case plan cannot be uploaded. Observation Planning

SECCHI – Sun-Earth Connections Coronal and Heliospheric Investigation Science Constraints Science emphasis shifts as separation angle between observatories increases. –Cannot repeat observations under the same conditions. –Requires careful planning, similar to interplanetary mission. For example, 3D studies of coronal features using stereoscopy requires “tie-point” identification and minimization of error in height (Z) determination based upon knowledge of X-Y coordinates. –Optimal angles are between 3º < α < 15º, so needs to be done during first 6 months of mission. Timing of CME related structures: one spacecraft sees a limb event while second spacecraft sees a disk event and halo CME. –Best suited for ~90º separation or ~ 2 years into mission. Desire to design a mission long synoptic program that meets the top- level science objectives, while maintaining enough flexibility to evolve as separation angle increases.

SECCHI – Sun-Earth Connections Coronal and Heliospheric Investigation Overlap of Views from CORs and HI1 Overlapping fields of view from the CORs and HI1 on the Ahead and Behind spacecraft about one year after launch.

SECCHI – Sun-Earth Connections Coronal and Heliospheric Investigation Overlap of Views from HIs Overlapping fields of view from HI1 and HI2 on the Ahead and Behind spacecraft about one year after launch

SECCHI – Sun-Earth Connections Coronal and Heliospheric Investigation Heliocentric Mission Orbit Sun Earth +22  /year -22  /year Ahead Behind Earth 1 yr. 2 yr. 3 yr. 4 yr. 1yr. 2yr. 3 yr. 4 yr. 5 yr. Heliocentric Inertial Coordinates (Ecliptic Plane Projection) Geocentric Solar Ecliptic Coordinates Fixed Sun-Earth Line (Ecliptic Plane Projection)

SECCHI – Sun-Earth Connections Coronal and Heliospheric Investigation Spacecraft Separation Angles

SECCHI – Sun-Earth Connections Coronal and Heliospheric Investigation Flight Software Constraints (1 of 2) Only one telescope from each CEB can be in readout mode at any time. –FSW keeps a separate timeline for each CEB. –Planning Tool ensures that conflicts do not occur. –Simultaneous HI and SCIP telescope readouts are OK. In the event that the scheduled start time of an image passes without the image being captured, the FSW will skip images until it is back on schedule. HI summing buffers are used for summing HI image sequences. –1024  bit pixel buffers that hold the sum of a series of HI images. –Separate summing buffers are maintained for HI-1 and HI-2. –Up to 99 images can be summed in a sequence.

SECCHI – Sun-Earth Connections Coronal and Heliospheric Investigation Flight Software Constraints (2 of 2) Parameter tables are used to control the setup and readout of the cameras, mechanisms, exposure times and image processing parameters. –Choice of parameters is limited by the available entries in these tables. –Table entries can be changed, but this requires careful planning and configuration control to avoid conflicts. –The exposure table has 7 entries per telescope for each combination of filter/sector wheel and polarizer setting. EUVI has 7 available exposure times for each filter/sector wheel combination. –The camera setup table includes camera gain, region of interest (image dimensions), binning, serial port clocking, waveform generator control, and waveform table. Each telescope has 7 rows of parameters in the camera setup table. –Each telescope has 8 available CEB tables. At least one of these tables is reserved for use as a CCD clear table. –Each telescope has 5 available occulter and region of interest masks. These masks cannot be used with ICER compression. –The image processing table specifies processing to be applied to a raw CCD image. IP table has 100 rows with 20 entries per row. The same image can be processed in several ways and for several purposes, or several images can be processed only after the last is taken. –The threshold table is used for event detection to inhibit writing to the SSR2 partition. Threshold table is derived from data from a specific telescope and should only be used with that telescope.

SECCHI – Sun-Earth Connections Coronal and Heliospheric Investigation SSR Partition Management SECCHI solid-state recorder (SSR) allocation is 6553 Mb (819 MB), divided into two science partitions and one partition for space weather beacon data. SSR allocation for space weather beacon data is 100 Mb. SSR1 is 80% of the total science allocation (5162 Mb): –SSR1 is intended to be used for the synoptic observing program. –SSR1 stops accepting data when full; additional data sent to this partition will be lost. –SSR1 is nominally downlinked once every day during the scheduled ground contact. SSR2 is 20% of the total science allocation (1291 Mb): –SSR2 is intended to be used either to supplement the SSR1 synoptic program, or for special observations. –SSR2 is a circulating buffer, set to overwrite the oldest data when full, unless an event trigger is set. –SSR2 is nominally downlinked 20% every day during the scheduled ground contact  5 days required to downlink the full contents of SSR2. All data are written to the SSR for later downlink (including real-time and space weather data).

SECCHI – Sun-Earth Connections Coronal and Heliospheric Investigation Average SECCHI Daily Data Volume Data RateMission Time (months)Mbits/day High Medium Low Average daily data volume quoted above includes science and housekeeping data, but not space weather data. –HK data generated during the daily pass count twice, as they are sent both to the SSR and the real-time downlink channel. Average science data volume downlinked from SSR1 during each pass is approximately 4073 Mbits. Average daily volumes were computed prior to launch, and were based on pass durations of 3.5 hours. Actual pass durations are usually 4 hours, so a proportionally greater data volume is typically returned (after allowing for overhead at beginning and end of pass). In reality, high data rate will probably be available for longer than 14 months.

SECCHI – Sun-Earth Connections Coronal and Heliospheric Investigation Telescope# Images and Size (pixels)Cadence (minutes) Total Images/Day Compression Scheme Total Mbits/Day EUVI2 2k x 2k (195/304) 2 2k x 2k (171/284) 4 2k x 2k ICER4 ICER5 Rice COR13 1k x 1k (pB)10432ICER COR23 2k x 2k (pB) 1 2k x 2k (B) ICER HI11 1k x 1k4036Rice477.4 HI21 1k x 1k12012Rice214.4 Total SSR1 Daily Synoptic Program (Version A)

SECCHI – Sun-Earth Connections Coronal and Heliospheric Investigation SSR2 Daily Synoptic Program (Version A) Telescope# Images and Size (pixels) Cadence (minutes) Total Images/Day Compression Scheme Total Mbits/Day EUVI 2 2k  2k (195/304) ICER COR1 3 1k  1k 10432ICER EUVI observations are used to increase the image cadence in two wavelengths from 10 minutes in SSR1 to 2.5 minutes with SSR1 and SSR2 combined. COR1 observations are interleaved with SSR1 observations for an effective image cadence of 5 minutes. Program fills SSR2 in about 7.6 hours, after which the oldest data gets overwritten, unless an event trigger is set. This program takes a total of 5487 images per day (SSR1 and SSR2 combined). –Some of these images are also processed for space weather.

SECCHI – Sun-Earth Connections Coronal and Heliospheric Investigation Telescope# Images and Size (pixels)Cadence (minutes) Total Images/Day Compression Scheme Total Mbits/Day EUVI1 2k x 2k (171) 4 2k x 2k ICER6 ICER4 ICER COR13 1k x 1k (pB)10432ICER COR23 2k x 2k (pB) 1 2k x 2k (B) ICER HI11 1k x 1k4036Rice477.4 HI21 1k x 1k12012Rice214.4 Total SSR1 Daily Synoptic Program (Version B)

SECCHI – Sun-Earth Connections Coronal and Heliospheric Investigation SSR2 Daily Synoptic Program (Version B) Telescope# Images and Size (pixels)Cadence (minutes) Total Images/Day Compression Scheme Total Mbits/Day EUVI 3 2k  2k (195/304/284) 1 2k  2k (171) ICER COR1 3 1k  1k 10432ICER EUVI observations are used to increase the image cadence in three wavelengths from 10 minutes in SSR1 to 2.5 minutes with SSR1 and SSR2 combined, and in one wavelength from 2.5 minutes in SSR1 to 50 seconds with SSR1 and SSR2 combined. COR1 observations are interleaved with SSR1 observations for an effective image cadence of 5 minutes. Program fills SSR2 in about 5.8 hours, after which the oldest data gets overwritten, unless an event trigger is set. This program takes a total of 7476 images per day (SSR1 and SSR2 combined). –Some of these images are also processed for space weather.

SECCHI – Sun-Earth Connections Coronal and Heliospheric Investigation Proposed Modifications to SSR Partition Sizes Current synoptic program assumes that average daily data volume is downlinked every 24 hours. –In reality, separation between passes can be as much as 36 hours, and frequently is at least 30 hours. –SSR allocation is sufficient for 36 hours of data at average write rates. –Since SSR1 is given higher priority than SSR2 in playback of recorder data (ratio of SSR1 packets to SSR2 packets in playback is greater than 80:20 ratio of partition sizes), SSR1 only has about 3 hours margin for separations between passes greater than nominal 24 hours. –Data will be lost with either version of this program on days when separation between passes exceeds 27 hours! Proposed solution is to reduce size of SSR2 partition from 1291 Mbits to 800 Mbits, with this space reallocated to SSR1. –Increases margin on SSR1 to allow storage of 30 hours of data with current program. –Typical pass duration of 4 hours is sufficient to downlink all of these data (plus most of SSR2) in one pass, thus freeing up SSR space for new data.

SECCHI – Sun-Earth Connections Coronal and Heliospheric Investigation Special Observing Programs SSR2 partition is intended for special (non-synoptic) observing programs. Possible uses include: –Increased cadence of observations already in synoptic program. –High-cadence sequences intended to capture onset of CMEs. –Observations in support of a JOP or campaign where the science objectives cannot be met with the synoptic program. –Observations to be carried out on only one spacecraft. Remember: data on SSR2 will be overwritten once the partition is full, unless contents are frozen by an event trigger! Remember: up to 5 days may be required to completely downlink data from SSR2 partition!

SECCHI – Sun-Earth Connections Coronal and Heliospheric Investigation Joint Observing Programs JOPs are for any instrument studies that involve special observations, from a single SECCHI telescope to campaigns involving multiple instruments or spacecraft. Modeled on the successful SOHO JOP concept. JOP description should be submitted to the SECCHI Science Operations Coordinator, who will evaluate the feasibility of the proposed observations. Once accepted, JOPs will be scheduled through the normal STEREO planning process. SECCHI Campaign in May 2007 has been written up as a JOP, including support requested from Hinode, SOHO and TRACE.

SECCHI – Sun-Earth Connections Coronal and Heliospheric Investigation SECCHI Campaign periods consist of an additional DSN track lasting 3.5 hours each day, beginning 12 hours after the start of the normal daily track, for a total of 4 weeks during the nominal mission. This will enable downlink of additional SECCHI data (approximately twice the nominal daily data volume), and will enable high-cadence observations targeted to specific science objectives. Other instruments continue to receive their normal daily data volumes. SECCHI has planned to schedule the 4 weeks as two periods of 2 weeks each: –Campaign periods will be based on spacecraft separation angles desired for specific science objectives. –First campaign period is scheduled to occur from May 4-17, 2007, when the spacecraft are separated by about 7 degrees. –Campaign periods need to be finalized at least 6 months in advance, to allow time for scheduling of extra DSN tracks. SECCHI Campaigns