K.Walaron Fermilab, Batavia, Chicago 12/6/2006 1 Simulation and performance of beamline K.Walaron T.J. Roberts.

Slides:



Advertisements
Similar presentations
1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
Advertisements

Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
January 14, 2004 TJR - - UPDATED 1/25/04 1 MICE Beamline Analysis Using g4beamline Including Jan 25 Updates for Kevin’s JAN04 Beamline Design Tom Roberts.
FIGURE OF MERIT FOR MUON IONIZATION COOLING Ulisse Bravar University of Oxford 28 July 2004.
1 Angular Momentum from diffuser Beam picks up kinetic angular momentum (L kin ) when it sits in a field –Canonical angular momentum (L can ) is conserved.
TJR Feb 10, 2005MICE Beamline Analysis -- TRD SEPT041 MICE Beamline Analysis – TRD SEPT04 Tom Roberts Muons, Inc. February 10, 2005.
FODO-based Quadrupole Cooling Channel M. Berz, D. Errede, C. Johnstone, K. Makino, Dave Neuffer, Andy Van Ginneken.
Particle ID in the MICE Beamline MICE Collaboration Meeting 30 March Paul Soler, Kenny Walaron University of Glasgow and Rutherford Appleton Laboratory.
Paul drumm, mutac jan MICE Beamline Optics Design Kevin Tilley, RAL, 12th June MICE Needs Generic Solution Pion Injection & Decay Section (a) Inputs.
SLIDE Beam measurements using the MICE TOF counters Analysis meeting, 23 September 2008 Mark Rayner.
RF Bucket Area Introduction Intense muon beams have many potential applications, including neutrino factories and muon colliders. However, muons are produced.
March 30, 2004 TJR1 MICE Upstream Particle Identification Tom Roberts Illinois Institute of Technology March 30, 2004.
Slide 1 MICE Beamline Design and Commissioning Review 16 th Nov 2007 Simulation comparison / tools / issues Henry Nebrensky Brunel University There are.
TJR Sept 22, 2004MICE Beamline Analysis -- SEPT041 MICE Beamline Analysis – SEPT04 Tom Roberts Muons, Inc. September 22, 2004.
Alain Blondel MICE: Constraints on the solenoids 2.Field Homogeneity: or ? this will be dictated by the detector requirements. TPG will be.
TJR 10/30/031 MICE Beam rates Tom Roberts Illinois Institute of Technology 10/30/03.
March 30, 2004 TJR1 MICE Target Source Calculations Tom Roberts Illinois Institute of Technology March 30, 2004.
Kirk McDonald Monday, 28th May Report of the International Working Group on Muon Beamlines Bruno Autin, Roberto Cappi, Rob Edgecock, Kirk McDonald,
M.apollonioCM17 -CERN- (22/2 - 25/2 2007)1 Single Particle Amplitude M. Apollonio – University of Oxford.
Beam line summary paul drumm for beam line group.
Chris Rogers, MICE CM16 Wednesday Plenary Progress in Cooling Channel Simulation.
Diffuser in G4MICE Victoria Blackmore 09/03/10 Analysis Meeting 1/8.
TJR August 2, 2004MICE Beamline Analysis1 MICE Beamline Analysis JUNE04 Including a proposal for a JUNE04A Configuration Tom Roberts Illinois Institute.
Beamline-to-MICE Matching Ulisse Bravar University of Oxford 2 August 2004 MICE performance with ideal Gaussian beam JUNE04 beam from ISIS beamline (Kevin.
MICE Beam Line Design Oct 24 th 2005 Dean Adams, Kevin Tilley Based on TURTLE element definitions by K Walaron, T Roberts and K Tilley.
TJR 9/24/031 Update: Geant4 Simulations of the MICE Beamline – Absolute Normalization Tom Roberts Illinois Institute of Technology 9/24/03 (With thanks.
TJR 7/30/031 Geant4 Simulations of the MICE Beamline Tom Roberts Illinois Institute of Technology 7/30/03.
1Malcolm Ellis - Software Meeting - 31st May 2006 Data Challenge Requirements  First list of requirements, based on Yagmur’s document: u
MICE Experiments Introduction Introduction Disclaimers Disclaimers Assumptions Assumptions Baseline programme Baseline programme Full programme Full programme.
Mark Rayner, Analysis workshop 4 September ‘08: Use of TOFs for Beam measurement & RF phasing, slide 1 Use of TOFs for Beam measurement & RF phasing Analysis.
Chris Rogers, Analysis Parallel, MICE CM17 Progress in Cooling Channel Simulation.
1 MICE Beamline Design: General principles & expected capabilities Kevin Tilley, 16 th November Charge to beamline & desirable beam General principles.
M.apollonio/j.cobbMICE UK meeting- RAL - (9/1/2007) 1 Single Particle Amplitude M. Apollonio – University of Oxford.
Oct 15, 2003 Video Conference Energy Deposition Steve Kahn Page 1 Energy Deposition in MICE Absorbers and Coils Steve Kahn November 2, 2003.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
(+) session, PAC09 Vancouver – TH6PFP056 Introduction The Muon Ionisation Cooling Experiment (MICE, fig. 1c) at RAL[1]
1 Beamline DayTimePresenterTopic Thurs9:00C.BoothMICE Target Wed16:00K.TilleyRecent Beamline Design Work Wed16:30T.RobertsMICE Beamline Performance + Emittance.
Particle Production in the MICE Beam Line Particle Accelerator Conference, May 2009, Vancouver, Canada Particle Production in the MICE Beam Line Jean-Sebastien.
2002/7/02 College, London Muon Phase Rotation at PRISM FFAG Akira SATO Osaka University.
Results from Step I of MICE D Adey 2013 International Workshop on Neutrino Factories, Super-beams and Beta- beams Working Group 3 – Accelerator Topics.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
MICE Step 1: First Emittance Results with Particle Physics Detectors Linda R. Coney EuCARD Meeting – 10 May 2011.
M. apollonio MICE Beamline summary. - Beamline parallel session (June 1 st ): - envisaged goals (Alain) - assess readiness of the line magnet status (Ken)
MICE input beam weighting Dr Chris Rogers Analysis PC 05/09/2007.
Luminosity Monitor UKNF Meeting 7 June 2010 Paul Soler, David Forrest Danielle MacLennan.
RAL Muon Beam Line Properties. ISIS 70 MeV H- injection Ring accelerates up to 800 MeV in about 10 ms 50 Hz cycle - Dual Harmonic System ~ 2 x 1.5 MHz;
Mark Rayner 14/8/08Analysis Meeting: Emittance measurement using the TOFs 1 Emittance measurement using the TOFs The question: can we use position measurements.
TJR August 2, 2004MICE Beamline Analysis1 MICE Beamline Analysis JUNE04 Including a proposal for a JUNE04A Configuration Update – August 03, 2004 (new.
Marco apollonio/J.CobbMICE coll. meeting 16- RAL - (10/10/2006) 1 Transmittance, scraping and maximum radii for MICE STEPVI M. Apollonio – University of.
Oct 15, 2003 Video Conference Energy Deposition Steve Kahn Page 1 Energy Deposition in MICE Absorbers and Coils Steve Kahn November 2, 2003.
1M. Ellis - NFMCC - 31st January 2007 MICE Analysis.
Geant4 Simulation of the Beam Line for the HARP Experiment M.Gostkin, A.Jemtchougov, E.Rogalev (JINR, Dubna)
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
Simulating the RFOFO Ring with Geant Amit Klier University of California, Riverside Muon Collaboration Meeting Riverside, January 2004.
1June 2 nd 2009MICE CM24 - RAL1 m. apollonio Beamline+( ,P) matrix.
Nufact02, London, July 1-6, 2002K.Hanke Muon Phase Rotation and Cooling: Simulation Work at CERN new 88 MHz front-end update on cooling experiment simulations.
CKOV1 design status 1. Generation of muon and pion beam files 2. PID performances with water radiator 3. Does it help with fluorocarbon FC72 ? 4. Conclusion.
Paul drumm, mutac jan Status of Muon Beamline design work Kevin Tilley, RAL, 9th Feb Including Beamline Materials in new revision Reference ('True')
This presentation will describe the state of each element in the beam line with regards to the current update being undertaken. Firstly, it will describe.
MICE Step IV Lattice Design Based on Genetic Algorithm Optimizations Ao Liu on behalf of the MICE collaboration Fermilab Ao Liu on behalf of the MICE collaboration.
1June 1 st 2009MICE CM24 - RAL1 Beamline Optics m. apollonio.
Muons, Inc. Feb Yonehara-AAC AAC Meeting Design of the MANX experiment Katsuya Yonehara Fermilab APC February 4, 2009.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
G4beamline Spin Tracking Tom Roberts, Muons, Inc. In G4beamline 2.12, the tracking of muon and electron spins is introduced: – decay of pions into polarized.
Marco apollonioAnalysis Meeting (9/12/2006)1 transmission vs amplitude with a finite size diffuser M. Apollonio – University of Oxford.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
Beam-Line Analysis m. apollonio 7/7/2010 CM27 - RAL 1.
Design of the MANX experiment
K. Tilley, ISIS, Rutherford Appleton Laboratory, UK Introduction
Presentation transcript:

K.Walaron Fermilab, Batavia, Chicago 12/6/ Simulation and performance of beamline K.Walaron T.J. Roberts

K.Walaron Fermilab, Batavia, Chicago 12/6/20062 G4beamline: An overview G4beamline is code based on full GEANT4 implementation. G4beamline is code based on full GEANT4 implementation. Very realistic. Very realistic. All stochastic physics, decays, quads and dipoles realistic. Fringe fields included. All stochastic physics, decays, quads and dipoles realistic. Fringe fields included. Decay Solenoid  Field map, Tracker Solenoid  Opera 2D field map. Decay Solenoid  Field map, Tracker Solenoid  Opera 2D field map. All materials included, windows realistic, world volume is air. All materials included, windows realistic, world volume is air. Anything that should be in vacuum is in vacuum e.g. except for air- gap to decouple ISIS/pion-channel everything is in vacuum until end of decay solenoid. Anything that should be in vacuum is in vacuum e.g. except for air- gap to decouple ISIS/pion-channel everything is in vacuum until end of decay solenoid. Point to make is that we believe the G4beamline simulation is accurate to a good level and is a powerful tool for beamline evaluation Point to make is that we believe the G4beamline simulation is accurate to a good level and is a powerful tool for beamline evaluation

K.Walaron Fermilab, Batavia, Chicago 12/6/20063 Target/beamline interface ISIS beam profile not well known ISIS beam profile not well known ISIS beam-loss constraints ISIS beam-loss constraints Assumptions have been made to best of knowledge Assumptions have been made to best of knowledge Target test in Oct ’06 will improve knowledge Target test in Oct ’06 will improve knowledge Identified as area where lack of knowledge exists. Low impact on optics design, possible impact on rates. High impact if we trip ISIS but target depth will be variable. Target test should illuminate this (no pun intended). Identified as area where lack of knowledge exists. Low impact on optics design, possible impact on rates. High impact if we trip ISIS but target depth will be variable. Target test should illuminate this (no pun intended).

K.Walaron Fermilab, Batavia, Chicago 12/6/20064 Target/beam assumptions Target materialTitanium Overall target height10 mm Target height intersecting ISIS beam2 mm Target width1 mm Target length along beam10 mm Target fraction of an interaction length0.036 ISIS total beam area at target4400 mm 2 ISIS relative beam density at target (edge of beam) 10% Target insertions per second1 Target duration in beam with good RF1 ms ISIS protons/bunch2.5·10 13 ISIS bunch rate at target1.5 MHz Protons intersecting target during 1 ms with good RF 1.7·10 12

K.Walaron Fermilab, Batavia, Chicago 12/6/20065 Rate normalisation method 3 separate target simulations: MARS, GEANT4, LAHET For each outgoing π+ determine its polar angle, and weight it according to the azimuth fraction of 360° that the polar angle intersects the angular acceptance rectangle of MICE. Sum the weights for all pions within the momentum cut Tune shown: Momentum acceptance of 427<Ptot<461 DescriptionLAHETMARS Protons on target1.000·10 7 π + weighted into acceptance π + per second into acceptance 5.64· ·10 5 π + generated into acceptance and tracked 1.000·10 6 good μ + tracked (no LH 2, no RF) 1737 good μ + per millisecond

K.Walaron Fermilab, Batavia, Chicago 12/6/20066 Beamline Optics tune method Select momentum acceptance Select momentum acceptance Magnet currents defined using turtle/transport Magnet currents defined using turtle/transport Tune both dipoles: Stochastics off, reference particle down beamline centre Tune both dipoles: Stochastics off, reference particle down beamline centre For higher/lower momentum tunes scale currents For higher/lower momentum tunes scale currents

K.Walaron Fermilab, Batavia, Chicago 12/6/20067 CM15-6pi-200MeV/c example evaluation π+ central momentum (B1) MeV/c μ+ central momentum (B2) MeV/c μ+ mean momentum in Tracker1 – design 206 MeV/c μ+ mean momentum in Tracker1 – achieved 221 MeV/c* Diffuser thickness (Pb) 0.95 cm Design input emittance 6 π mm-rad * Peak in distribution does appear to be ~206 MeV/c. High momentum tail accounts for the higher mean

K.Walaron Fermilab, Batavia, Chicago 12/6/20068 Tracker1 beam profiles

K.Walaron Fermilab, Batavia, Chicago 12/6/20069 Muon matching section beam envelopes Envelopes are the RMS of the sub- distribution of mu+ in the energy range < E mu+ <252.2

K.Walaron Fermilab, Batavia, Chicago 12/6/ D normalised emittance TOF0 and CKOV1 TOF1 Diffuser (9.5mm) mu+ in the energy range < E mu+ <252.2

K.Walaron Fermilab, Batavia, Chicago 12/6/ Singles Rates and particle contamination Descripti on LAHET singles (MHz) MARS singles (MHz) Average renormal ised singles (MHz) TOF CKOV TOF Tracker1 (1 st plane) Good mu ParticleTOF1 p0.45% π+π+ 1.29% μ+μ+ 97% e+e+ 0.03% n0.06% γ0.03% π-π- 0 μ-μ- 0 e-e- 0 Anti nu_mu1% Nu_mu0.07% Nu_e0.04%

K.Walaron Fermilab, Batavia, Chicago 12/6/ Matching We are certain that we can produce the 3x3 matrix of beam configurations (1pi is a problem) Matching into the MICE tracker important Want to match ptot design +/- 10% distrubution to desired twiss parameters inside tracker Identified as a risk and recent provision made to study this. Optimiser under development to match to beta function by altering 6 muon channel quadrupoles Initial studies show, for example, for this tune the following results Q4 Q5 Q6 Q7 Q8 Q9 beta betaDiff 4Demitt