Engineering H193 - Team Project Gateway Engineering Education Coalition Spring Quarter 2005 P. 1 Drive Train Calculations Week 3 Day 1.

Slides:



Advertisements
Similar presentations
Teacher Professional Development Spring, 2002
Advertisements

FRC Robot Mechanical Principles
Mechanisms Simple Machines
Gears, Gears and More Gears
ROBOT DYNAMICS. MOTORS supply the FORCE that the robot needs to move Rotational Force is called TORQUE The motor needs to supply force to wheels arms.
PHY131H1S - Class 10 Today: Equilibrium Mass, Weight, Gravity.
Engineering H191 - Drafting / CAD Gateway Engineering Education Coalition Lab 6P. 1Autumn Quarter Gears Lab 6.
Engineering H193 - Team Project Gateway Engineering Education Coalition Spring Quarter P. 1 Drive Train Calculations Week 3 Day 1.
Mechanical Concepts 101 Shannon Schnepp Dennis Hughes Anthony Lapp 10/29/05.
SUMMER INSTITUTE - ROBOTICS THE OHIO STATE UNIVERSITY Drivetrains.
Simple Machines. Would it require more work to take 100, 1kg books to the book room one at a time, or to take them in stacks of 20? Why?
Engineering H193 - Team Project Gateway Engineering Education Coalition Spring Quarter 2006 P. 1 Today and the Week Ahead Week 3 Day 1.
Motion Measuring Motion Speed – Average Speed = distance covered / time taken v = d/t metric unit of speed: m/s English unit of speed: ft/s –Constant.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2008 Robot Programming Tips Week 4 Day 2 By Matt Gates and.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2008 Week 6 Day 1 Lecture On and Examples Of Electrical Circuits.
Advanced Drivetrain Calculations John E. V-Neun, Team 229 John A. Neun, P.E., Team 20.
 Background  Problem Statement  Solution  Mechanical › Azimuth › Elevation › Concepts › Static and Dynamics of System  Software › SatPC32 › Interpolation.
The Basics of Physics.
Engineering H193 - Team Project Spring Quarter 2003 P. 1 Performance Test 2 Week 4 Day 3.
Engineering H193 - Team Project Gateway Engineering Education Coalition Spring Quarter 2004 P. 1 Drive Train Calculations Week 3 Day 1.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2007 Lecture on Oral Presentations Week 7 Day 1.
KINETIC ENERGY, WORK, PRINCIPLE OF WORK AND ENERGY
Engineering H193 - Team Project Gateway Engineering Education Coalition Final Report – An Overview Week 4 Day 2.
Marker Test #1 Size Functionality Critical marker diameter for marker chuck. Want the marker to fit snugly in the chuck. Critical marker length for the.
Engineering H193 - Team Project Gateway Engineering Education Coalition Performance Review Week 3 Day 3.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2005 Final Report – An Overview Week 4 Day 2.
Engineering H193 - Team Project Spring Quarter2005 Gateway Engineering Education Coalition P. 1 Lecture on Oral Presentations Week 7 Day 1.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter Week 6 Day 2 Lecture on and Examples of Electrical Circuits.
Robot Physics: Part 1 By: Danica Chang and Pavan Datta Team 115.
VEX Drive Systems Presented by Chani Martin Lauren Froschauer Michelle Presented by Chani Martin Lauren Froschauer Michelle.
Angular Momentum of a Particle
Section 6 Newton’s 2nd Law:
Measuring Friction between two surfaces
S8P3. Students will investigate relationship between force, mass, and the motion of objects. c. Demonstrate the effect of simple machines (lever, inclined.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Tips for Motors & Handy Board Care Week 3 Day 2.
 Energy is the capacity of doing work.  Energy methods are useful in analyzing machines that store energy. counterweights springs flywheels Energy Methods.
Engineering H193 - Team Project Gateway Engineering Education Coalition Lab 2P. 1Spring Quarter Motor Dynamics Lab 2.
ME 101: Measurement Demonstration (MD3)
 Scalars are quantities that have magnitude only, such as › position › speed › time › mass  Vectors are quantities that have both magnitude and direction,
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Engineering H193 Course Introduction Team Assignments Team Working.
Warm up 1. a 30 kg child is on a slide (inclined plane) which is at a 55 degree angle with the ground. A. Draw a Free body Diagram of the situation B.
Lab # 3: The Programmable Robot General Engineering Polytechnic University.
Machines and MA Page Simple machines ► Means a machine that only uses the forces directly applied and accomplishes its work with a simple motion.
Copyright © Cengage Learning. All rights reserved. CHAPTER Radian Measure 3.
Mechanisms Jeopardy Q $100 Q $200 Q $300 Q $400 Q $500 Q $100 Q $200 Q $300 Q $400 Q $500 Final Jeopardy.
In Unit 5: Speed, Power, Torque, and DC Motors, you build a VEX test stand winch that enables you to learn key engineering concepts and principles so.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter Final Report – An Overview Week 4 Day 2.
Sci 701 Unit 5 Speed is a measure of how fast an object is moving, that is, how much distance it will travel over a given time. This measure is given.
KINETIC ENERGY, WORK, PRINCIPLE OF WORK AND ENERGY
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter Observations from the Individual Competition Week 8 Day 3.
Mechanical Workshop FIRST Mid Atlantic Region January 2016.
Engineering Analysis ME 4182 Submitted 6/28/06 Yuki Miyasaka, Anthony Palladino, David Price, Whitney Price, Ricky Sandhu.
Speed, Power, Torque and DC Motors
Warlocks 8/5/05 TMU FIRST Robotics 101 u Week 1) Gears, Pulleys, Sprockets, Bearings u Week 2) Motors & Controls u Week 3) Pneumatics u Week 4) Materials.
2/25-26 Obj: I can apply concepts of physics – energy, work, and efficiency--- to describe motion. What you should have in the ENB: Write down the first.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Lab Day – Controller Lab 1 Brief Follow-up from Wednesday Grading.
Frictional Forces This topic may be abrasive. Friction Friction is a force that opposes motion Friction will cause a moving object to slow down and finally.
Warm Up Activity 1.Pick up a poker chip from the teacher. 2.3 chips per team: 1 white, 1 blue, and 1 red per team. 3.Sit with your team members.
Physics 218 Lecture 8: Dynamics Alexei Safonov.
Free-Body Diagrams ForceSymbol/FormulaDescription WeightF w = mgAlways directed downward Tension ForceTPulling forces directed away from the body Normal.
Speed, Power, Torque & DC Motors
V = 20 m/s magnitude of the velocity vector.
Imagine a ball… Draw the forces acting if: It is at rest on the ground
Performance Review Week 3 Day 3 Spring Quarter.
Mousetrap Car Project Research mousetrap cars and design a car that meets the TSA specifications in the Technology Day at the Fair Competition rules. Draw.
Performance Review Week 3 Day 3 Spring Quarter.
KINETIC ENERGY, WORK, PRINCIPLE OF WORK AND ENERGY
Six Simple Machines Lever Wheel & Axle Pulley Inclined Plane Wedge
Solar Car Project Research solar cars and create a short powerpoint presentation with the following slides: Title Slide with name, date, project Pictures.
P09203 RP1 Motor Module Gen 2.
Presentation transcript:

Engineering H193 - Team Project Gateway Engineering Education Coalition Spring Quarter 2005 P. 1 Drive Train Calculations Week 3 Day 1

Engineering H193 - Team Project Gateway Engineering Education Coalition Spring Quarter 2005 P. 2 Drive Train Calculations Draw pictures Make estimates Draw force diagrams Do calculations in terms of algebraic symbols - include ‘safety’ factors Substitute numbers Refine calculations as robot takes shape

Engineering H193 - Team Project Gateway Engineering Education Coalition Spring Quarter 2005 P. 3 Drive Train Calculations Speed Required - Example only –Distance to be traveled - 20 feet –Time allotted – 2 minutes (120 seconds) but consider using something less like 90 or 100 seconds to be somewhat conservative Torque Required –Static analysis of robot on ramp –Constant velocity on ramp allows static analysis

Engineering H193 - Team Project Gateway Engineering Education Coalition Spring Quarter 2005 P. 4 Calculating the Velocity Required Distance to be traveled - measure your own robot's path on the course - example: 20 feet Time allotted – 2.0 minutes - example: use 90 sec V = Distance / time = 20 feet / 90 sec = 0.22 ft/sec Assume the robot must go faster, for example, 0.25 ft/sec or 3 inches / sec (allow for pick and deposit time, turning, obstacle avoidance) Robot wheel is 1.75 in diameter, radius is in Drive shaft speed required = velocity / (2*pi*r) which is rev/sec or 32.7 rpm

Engineering H193 - Team Project Gateway Engineering Education Coalition Spring Quarter 2005 P. 5 Calculating the Torque Required Estimate weight of Robot - ~ 5 lb (use scale to weigh parts) –Handy Board and Motors –Drive Train - gears / axles / wheels / shaft encoders –Chassis - includes hot glue –Sensors - micro switches, CdS cell Estimate internal Friction - FI ~ 0.5 lb. Try pulling or pushing robot on level ground using the spring scale. Estimates of velocity and weight include some ‘safety’ factors

Engineering H193 - Team Project Gateway Engineering Education Coalition Spring Quarter 2005 P. 6 W WNWN W II P FIFI Sum of Forces parallel to plane = 0 P - W II - F I = Check the length and height of the ramp Static (Const. Velocity) Analysis

Engineering H193 - Team Project Gateway Engineering Education Coalition Spring Quarter 2005 P. 7 P - W II - F I = 0 W II = W sin (slope angle) slope angle = atan(3/7) = ~23 degrees W II = 5 lbs (sin(23)) = 1.97 lb P = 1.97 lb lb = 2.47 lb Torque = P x Radius of Wheel = 2.47 x = 2.16 lb-in = 34.6 oz - in Torque Speed Stall No Load Speed Usable performance Static (Const. Velocity) Analysis

Engineering H193 - Team Project Gateway Engineering Education Coalition Spring Quarter 2005 P. 8 Torque Speed Stall No Load Speed Usable performance Different Power Settings Motor Performance Curves

Engineering H193 - Team Project Gateway Engineering Education Coalition Spring Quarter 2005 P. 9 Drive Train Calculations Is the required Torque divided between two motors? If Torque and speed required don’t match characteristics, then gearing or motor change is required What are critical factors? –Weight –Internal Friction –Time –Slope of ramp

Engineering H193 - Team Project Gateway Engineering Education Coalition Spring Quarter 2005 ItemPoints COVER PAGE2 SKETCH - PATH ON COURSE4 AVERAGE SPEED CALCULATION4 SKETCH - FREE BODY DIAGRAM (Show calculation of robot weight) 4 CALCULATION OF TORQUE REQUIRED (On level surface & up ramp) 4 PLOT OF REQUIRED TORQUE & SPEED (On motor curve for your motor) 4 DECISIONS/CONCLUSIONS4 FORMAT/CLARITY/NEATNESS4 TOTAL30 Grading for Power Train Calculations

Engineering H193 - Team Project Gateway Engineering Education Coalition Spring Quarter 2005 Shop Availability and Shop Safety For this week the shop will be in Rm 208 Hitchcock on MWF from 8 am to 5:30 pm and on TR from 10:30 am to 5:30 pm Eventually we plan on using the EE wood shop in Caldwell. You will receive notice when the shop moves. The FEH staff members are responsible for the shop and we will follow all safety rules in the shop ! Remember your safety glasses. No open-toe shoes in shop or lab Must have a TA “buddy” with you in the shop Only two people per team in the shop at a time