25.2.04TRD Collaboration meeting GSIClemens Adler TRD Production in Heidelberg Manpower/Resources/ Timescales.

Slides:



Advertisements
Similar presentations
May 17th 2007 Happex Collaboration Meeting 1 Compton polarimeter Electron detector upgrade and status PREX/Happex Collaboration Meeting May 17 th 2007.
Advertisements

EMU Chambers Production Supervision FNAL Supervision Line Manag. Infor. Flow G. Apollinari N. Chester L1-L2 Managers Chamber L3 Manag. Glenn Smith.
Fermilab E906 Schedule Paul E. Reimer 20 June 2008.
TRD Collaboration Meeting GSI Clemens Adler TRD Chamber production issues General Issues, Planning and Hd Status.
Supermodule Space-Frame Integration Backpanel L6C1, L0 Bernd Windelband, Uni Heidelberg ALICE-TRD status meeting, at KIP.
TRD ROC Status Clemens Adler TRD Status Meeting TRD ROC Status.
Hd Status and Planning TRD Chamber Construction Meeting Clemens Adler.
TRD Status Meeting Münster Clemens Adler TRD ROC Status Status Meeting Münster
TRD Collaboration meeting GSIClemens Adler First TRD Production Chambers Production Tests Results Documentation.
TRD Status meetingClemens Adler TRD Production Status -Material -Tooling -Timescale.
TRD Status meeting IKFClemens Adler TRD ROC Status -Dubna -Bukarest -GSI -Frankfurt -Heidelberg.
8.7.04TRD Status meeting HdClemens Adler TRD ROC Status.
TRD Collaboration meeting GSIClemens Adler First Production Chambers Production/tests/results.
Technical Forum Alice week Clemens Adler Transition Radiation Detector Status Participating Institutions: Athens University, NIPNE Bukarest, JINR.
1 RF Power infrastructure Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
TRD Status meeting HeidelbergClemens Adler Chamber production Production status/ Material status.
TRD Status meeting GSIClemens Adler Chamber production Production status/ Material status.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
RF Cavity / Coupling Coil Module
Hall D Online Data Acquisition CEBAF provides us with a tremendous scientific opportunity for understanding one of the fundamental forces of nature. 75.
COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.
12 Dec 2005 J. Schukraft1 ALICE USA ALICE position towards US participation EU participation in emcal Requirements Formal steps & schedule.
C. Seez Imperial College November 28th, 2002 ECAL testbeam Workshop 1 Offline software for ECAL test beam The pre-processing model The offline software.
The MRI Award was the first NSF grant to the Chemistry Department and the most expensive of the total of 4 awards to the University of North Florida. This.
B2B E-Commerce Workshop Focused Topics for the Breakout Groups B2B Infrastructure Inter-operable Electronic Catalogs Cost and Evaluation of B2B E-Commerce.
PRESENTATION ON Time and Motion Study BY:- KANIKA SOOD 108K18 AASHI AGARWAL 108K22.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
ATLAS Muon System WBS 3.5 DoE/NSF M&O Evaluation Group Review BNL 19-Jan-06 Frank Taylor MIT V1.3.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Muon trigger upgrades, missing since not aimed towards DOE funding PHENIX upgrades: view presented to DOE R&D $3.5M Construction $16.6M Au-Au p-p 200 Si-Si.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
Micromegas NSW issues Tasks list. Scope  Preparation of New Small Wheel project  Set up task sharing => proto-Collaboration (MoU)  Project leader &
JINR-BMBF Workshop, Dubna Clemens Adler PI Heidelberg ALICE TRD Transition Radiation Detector Overview and Status Clemens Adler Physikalisches.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
SoLID Pre-R&D List SoLID Collaboration Meeting September 11-12, 2015.
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates.
TRD Workshop RomaniaClemens Adler Heidelberg ROC Status Material procurement, Chamber Status TRD workshop Cheile Grandistei, Romania,
CMS Upgrade Workshop, FNAL, Nov 19-21, O.Prokofiev CMS Upgrade Workshop Updated ME4/2 chamber construction costs and prototype Status and plans.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
RHIC 56 MHz Cryomodule Informational Review RHIC Integration Cross-sectional view of 56 MHz Cavity in Vacuum Vessel.
USCMS Physics, May 2001Darin Acosta1 Status Report of PRS/  D.Acosta University of Florida Current U.S. activities PRS/  Activities New PRS organization.
EDM Fast Start Presentation WBS 11 – Assembly and Commissioning Vince Cianciolo, Paul Huffman May 23, 2006.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
Xenon Delivery Japan 1 MCHF 575 kCHF granted Additional grant 656 kCHF Last 50l subject to negotiation.
Closeout. Sharing 2010 Straw production – Material study: CERN – Procurement (CERN) – Straw production: Dubna Electronics (CERN) Simulations, analysis.
TCDI Project Budget Update François-Xavier Nuiry May 10 th 2015 EN-STI-TCD.
P. Paolucci G. Pugliese M.Tytgat
Façade Management Consulting
N_TOF CERN Enrico Chiaveri Spokesperson of n_TOF Collaboration
University of Wisconsin
Committee on Information Technology Planning and Budget Sub-Committee
TDAQ Phase-II kick-off CERN background information
An Analysis of Project Management Practices Related to Constructability followed in Indian Construction Industry Sharmin Khan Assistant Professor, Department.
GEM DAQ-Chamber Integration Test Stand for GE2/1 & ME0 at Florida Tech
WP1 Metrology & Alignment
Japan Participation in Phase-II TDAQ Upgrade
10/month is the present production rate 2 FTE + sporadic contributions
Human Factors: Understanding People-System Relationships
LINAC OPS Budget Review
HL-LHC upgrade at IPHC news

NSS integrated installation plan workshop Introduction
Detector Proto-Technical board Sep 30, 2010
Evaluate the integral {image}
Presentation transcript:

TRD Collaboration meeting GSIClemens Adler TRD Production in Heidelberg Manpower/Resources/ Timescales

TRD Collaboration meeting GSIClemens Adler TRD related tasks in Heidelberg (PI) Chamber construction Raw material machining for all production sites Procurement of all building materials Procurement of tooling Supermodule design (w. Dubna) Services engineering Coordination of Integration tasks DAQ devel. (Testbeam) X-Ray stand development (w. Dubna) Electronics development, testing, evaluation

TRD Collaboration meeting GSIClemens Adler Manpower 2 Tech (100%) 1 Tech (75%) 1 Tech (30-40%) ->2,5 FTE 8 Physicists: ->4 FTE (teaching, other projects etc.) Students ? FTE includes estimate of availability and efficiency (50-80% of work time)

TRD Collaboration meeting GSIClemens Adler Work in Heidelberg 2004

TRD Collaboration meeting GSIClemens Adler Chamber Production Rate: March-April: 1 Chamber/week April- : 1,5 Chambers/week (average). Peak: 2 Chambers/week Real(Optim)istic scenario: (mid-)May: 15 Chamb. (mid-)July: 30 Chamb. (end-)Oct.: 50 Chamb. X-mas: 60 Chambers (very) Optimistic scenario: 75 Chambers by X-mas

TRD Collaboration meeting GSIClemens Adler Manpower availability in 2005 Chamber building in Hd 2005: Tech: 1-1,5 FTE Physicists: 2-3 FTE Chamber building stopps by end 2004: Tech: 2 FTE Physicists: 3-4 FTE Possible reorganization of Manpower for electronics/supermodule installation and testing (Spring 2005):