Construction and Interfacing of a Solar Telescope Jon Turner University of Northern Colorado.

Slides:



Advertisements
Similar presentations
Android Enabled Camera Positioning system Design Team 3 Chris Sigler Yan Sidronio Ryan Popa Jeremy Iamurri Austin Fletcher Facilitator: Dr. Oweiss Sponsor:
Advertisements

EMS1EP Lecture 5 Digital Outputs Dr. Robert Ross.
Engineer Training XL1200 Electronics. Engineer Training XL1200 Electronics Confidential 2 XL1200 Electronics The XL Jet Electronic System consists of.
Optical Astronomy Final Year Double Honours Presentation Eoin Cartwright & John Loughran. Supervisor: Dr Créidhe Ní Shúilleabháin.
UNIVERSITA’ DEGLI STUDI DI NAPOLI FEDERICO II Luigi Cimmino November 12 th, Tokyo INTERNATIONAL WORKSHOP ON MUON & GEO-RADIATION PHYSICS FOR EARTH.
Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
EML 2023 – Motor Control Lecture 4 – DAQ and Motor Controller.
Observations of Active Galactic Nuclei via a Student Operated Remote Observatory Whitney Wills Michael Carini-Faculty Mentor Department of Physics and.
LSV2 Autonomous Chargers Design Team: (from the left) Branden Carpenter Wayne Romine Jon Stoker Dr. Hess (Advisor) Maggie Richardson.
LSV2 Charger Remote Control Design Team: (from the left) Branden Carpenter Wayne Romine Jon Stoker Dr. Hess (Advisor) Maggie Richardson Dr. Donohoe (Advisor)
STARLight PDR 3 Oct ‘01I.1 Miller STARLight Control Module Design Ryan Miller STARLight Electrical Engineer (734)
Darcy Bibb Oceanit Mentor: Tony Bartnicki Advisor: Curt Leonard Home Institution: Maui Community College Integration of a Small Telescope System for Space.
REAL-TIME SOFTWARE SYSTEMS DEVELOPMENT Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
P09561 – Visible Spectrum Imaging System: Final Project Review Dave Lewis Steve Sweet Joanna Dobeck Lenny Calabrese Jason Thibado Darrell Draper Customer:
Preliminary Design Review The Lone Rangers Brad Alcorn Tim Caldwell Mitch Duggan Kai Gelatt Josh Peifer Capstone – Spring 2007.
The Technion Israeli Institute of Technology Intel Inc. A cooperation of:
The Technion Israeli Institute of Technology Intel Inc. A cooperation of:
The Technion Israeli Institute of Technology Intel Inc. A cooperation of:
CosmicSatCosmicSat University of Northern Colorado April 2, 2004.
Circadian Rhythms / Biological Luminescence Detection Eitan Novotny Sean Dang Philip Tran Yu Kun Zhang.
The Nearby Supernovae Factory: Spectrograph Calibration Ben Dilday Advisor: Rick Kessler, CfCP Physics 335 Autumn 2003.
Logic Analyzer and pulse generator ECE 682. The specification Specification was handed out in ECE 582 last quarter. Basics  3 channels – dedicated output.
ASPPRATECH.
Vertical Profiling of Atmospheric Ozone Critical Design Review Western State College of Colorado Sarah Kampf Keith Nunn Brian Webb 04/02/04.
IRIS Telescope Camera Kimberly Bott Institute for Astronomy Mentor: Klaus Hodapp Home Institution: University of Hawaii at Hilo 2008 Center for Adaptive.
DESIGN OF MODERN INTEGRAGTED LABORATORY-STATION (ILS) FOR ENGINEERING EXPERIMENTAL COURSES M. Kostic, Srinivasa Rao Vaddiraju, Srinivas.
SCADA and Telemetry Presented By:.
Engineer Training Electronic System Overview. Engineer Training XL1500 Electronics Confidential 2 XLjet Electronics The XL1500 Electronic System consists.

The special unit for special tasks.  Installation possibilities Private area Special object Industrial park.
Undergraduate Space Research Symposium University of Colorado Boulder
Fick Observatory - Boone, IA. Observatory Automation ongo02e March 26, 2002 Faculty advisor: Dr. John P. Basart Client: Joe Eitter ISU Physics Department.
High Sensitivity Smoke Detection
Developments in the IntelliFIBER ™ Fiber Optic Fence Sensor
J. D. Cline, M. W. Castelaz Pisgah Astronomical Research Institute PARI Education and Research Programs Session 2.02 Monday, May 30, AAS 206th Meeting.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
Lecture 20: Communications Lecturers: Professor John Devlin Mr Robert Ross.
SDMAY11-01 Advisor: Dr. Ajjarapu Team Members: Luke Rupiper Shonda Butler Andrew Nigro Ryan Semler Chad Hand.
Progress report on multi-OTR fabrication and schedule IFIC-SLAC  Design and Hardware fabrication  Realistic Optics and Beam Dynamics simulations  Controls.
November 18, 2002Richard Talaga1 Target Hall Instrumentation NuMI Neutrino Beam Devices Instrumentation Review Instrumentation &Communication Overview.
Measurement and Control. Control Systems A control system usually consists of a processor, a control program, interfaces and a device under the processor's.
SSOL: Radio Telescope IRP Presentation Team Ongo-02c April 26, 2006 Client: Iowa Space Grant Consortium Advisor: Dr. Basart.
CosmicSatCosmicSat University of Northern Colorado April 2, 2004.
Abstract The goal of our project is the continued restoration of the 8.5 meter dish at the Fick observatory in Boone, IA. Before restoration began, the.
© 2008 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID 1 Chapter 3: Computer Assembly IT Essentials 5.0.
Hybrid Power Controller (HPC) Final Presentation Senior Design II.
Implementing a 10 Gb/s VCSEL Driven Transmitter for Short Range Applications Irfan N. Ali Michael C. Clowers David S. Fink Sean K. Garrison Jeff A. Magee.
System Performance Metrics and Current Performance Status George Angeli.
Mechanical Integration for the AD at LNL. Overview New reaction chamber and beam-line Telescopic Beam Line Beam Dump Summary.
Hybrid Power Controller (HPC) Mid-Semester Presentation Senior Design II.
Development of a Whitecap Measurement System Development of a Whitecap Measurement System By Garry Higgins.
IN 1900 ICT Project Final Presentation. Group name : Code Squad.
SNO Calibration System The SNO calibration source was designed to deploy sources into both the AV and light water volume between the AV and PSUP.
Current Telescope Control System Big Bear Solar Observatory Pointing and Tracking Guiding Light Beam Control.
SIDE SCAN HARDWARE CONFIGURATION
SIDE SCAN HARDWARE CONFIGURATION HYPACK Connection Block Diagram GPS, single beam and tide data go into HYPACK ® SURVEY. Sidescan (with optional.
Brandon Halleran.  The power supply for your personal computer gives your machine all the different voltages it needs to operate properly. It is able.
ECE 101 Exploring Electrical Engineering Chapter 7 Data Acquisition Herbert G. Mayer, PSU Status 11/30/2015 Derived with permission from PSU Prof. Phillip.
Project Description The Square D occupancy sensors use both ultrasonic and passive infrared technology (PIR) to detect occupancy in a room. This project.
UNIVERSITY OF MINES AND TECHNOLOGY, TARKWA
Four OTRs for ATF2 OTR History Current OTR setup New OTR design.
Fan Assembly Driven by Magnetic Fields
Intro to USB-6009 DAQ.
SOCS/Scheduler Development Plan Michael Reuter, Fransicso Delgado
Planetarium Resuscitation Ongo-06 May 1, 2002
Multidisciplinary Senior Design I: Problem Definition Review
Michael Fusco AZ / NASA Space Grant Scholar
EVLA MONITOR & CONTROL CDR
Planetarium Resuscitation Ongo-06 February 14th, 2002
Instrument Overview Larry Springer HMI Program Manager
Presentation transcript:

Construction and Interfacing of a Solar Telescope Jon Turner University of Northern Colorado

Overview Directs sunlight to a fixed target Three mirrors: two stationary, one moveable. Guided using computer controlled stepper motors. 60 foot vertical shaft

Uses Lecture demonstrations Solar astronomy Spectroscopic analysis Sunspot tracking Digital imaging Eclipse viewing Atmospheric studies

The Dome Made by Technical Innovations, Inc. Located on the roof of Ross Hall of Science Installed during renovation of foot diameter

Collector Mirror Alt-azimuth configuration Two rotation stages Two stepper motors Located inside dome

Stationary Mirrors Director Mirror Located inside dome directly above shaft Projects beam vertically Welded angle iron support Lab Mirror Projects beam horizontally into Optics Lab Bottom of shaft filled with sand

Computer Interface Dedicated computer has Advantech PCI bus interface card Has 16 digital output channels, counter/ timer and D/A, A/D conversion capabilities Connects to breakout board through 68 pin SCSI cable

Heliostat Control Windows based GUI Original software designed through a collaboration of students and faculty Allows bi-directional control of each motor Variable slewing rates

Current Events Allows for remote operation of the dome via computer Mounted inside dome Requires connection to dome motors and power supply

Dome Control Software included with dome Controls opening, closing, rotation Display of current position Links to popular telescopes

Current Events Ensure appropriate input signal to motor controller cards Enclosure containing: motor controller cards, power supply, relays, temperature sensor, fan Placement and alignment of mirrors

Budget Summary Dome - $20,000 Mirrors - $1960 Motors - $40 Motor Controller cards - $110 Rotation stages - $987 M1 and M2 mounts - $900 Computer - $1100 Internal pc card - $650 H-Alpha Filter - $4200 Cables, Miscellaneous - $200 Total - $30,147

Future Plans Tracking Algorithm Dome control integration Full system automation CCD Imaging Hydrogen-Alpha filter Spectroscopic analysis Weather Alerts (auto-shutdown) Live image monitor Upgrade to materials with low thermal expansion Vibration suppression

Acknowledgments Sponsored by NASA funds distributed by Colorado Space Grant Consortium Dr. Kendall Mallory – Dept. of Physics Dr. Robert Walch – Dept. of Physics Dr. Dick Dietz – Dept. of Physics Ken Cochran – Instrumentation & Fabrication Chad Lane and Jake Miller – Earth Sciences