Wind energy in the Netherlands Public consultation Ronald van den Heuvel Ministry of Transport, Public Works and Water Management North Sea Directorate.

Slides:



Advertisements
Similar presentations
Legal issues on shale gas activities raised in petitions received by the European Parliament Committee on Petitions.
Advertisements

TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
November 10, 2010 High-Water Protection Programme Anske van der Laan, Technisch Manager. Ministry of Infrastructure and the Environment.
New law governing the impacts of deep water petroleum and mineral extraction Robert Makgill Barrister & Solicitor North South Environmental Law.
Optimising Site Investigations for Offshore Wind Farm Projects Mark Finch Geotechnical Engineering Manager Hydrosearch Associates, Aberdeen UK Offshore.
Key Environmental Issues for Round Two Sue Sljivic Director – RSK ENSR Environment Ltd
BULGARIAN COMPETENT AUTHORITIES IN THE FIELD OF IPPC Kalin Iliev Ministry of Environment and Water Bulgaria.
Nsel North-South Environmental Law (NSEL) Beca International Consultants (Beca) 6 June 2011.
Arklow - GEWE 3.6 MW Offshore Project Lessons Learned
North Hoyle Offshore Wind Farm 17th April 2002 BONUS Energy A/S.
The Wider Offshore Industry - Introduction. Why Renewables? Mb/doe Gas Nuclear Oil Renewables Coal Incremental.
BWEA OFFSHORE CONFERENCE 17 – 18 APRIL 2002 Offshore Consents Planning for the Future Nigel Peace Director, Energy Regulation Department of Trade & Industry.
BMT Cordah Limited 1 Offshore Wind Energy Strategic Environmental Assessment (SEA) Phase 1 “Progress and Lessons” Mark Jennison and Trevor Baker BMT Cordah.
Public consultation in EIA procedures Geert P.J. Draaijers Netherlands Commission for Environmental Impact Assessment (
Injection of Gas and Improved Oil Recovery - the Norwegian Experience By Steinar Njå, Norwegian Petroleum Directorate.
Ministry of Petroleum and Energy Norway - British Colombia Offshore Oil & Gas November 18th Oil and gas development from an environmental perspective by.
Work package 3 Analysis of international MSP Instruments Sophie Jacques 3E Support by: WP 2: National MSP - France SEANERGY 2020 project Sophie Jacques.
National MSP in the Mediterranean Sea: Spain (and Portugal)
EU Environmental approximation in the WB and Turkey- ETNAR Conference Natural resources policy analysis in Montenegro Jelena Marojević-Galić Green Home.
In France, many authorisations are required to operate an offshore wind farm. The international conventions such as the Convention of Montego Bay do not.
UNEP-GEF DEMONSTRATION PROJECTS ON IMPLEMENTATION OF NATIONAL BIOSAFETY FRAMEWORKS Arhus GMO Working Group 24 March 2004.
Croatian Report on new Environmental Protection Law Josipa Blažević-Perušić, B.Sc. Arch. State Secretary Anita Pokrovac-Patekar, B.Sc. Pharm. Senior Environmental.
Marine Natura in UK offshore SAC consultation Charlotte Johnston, Mark Tasker, Paolo Pizzolla JNCC North Sea RAC.
FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.
State Permitting Issues for Wind Developments Southeast and Mid-Atlantic Regional Wind Summit 19 September 2005 Jennifer A. DeCesaro Energy Policy Specialist.
Potential of Extraction of Shale Gas in Germany in the Context of Mining Law Scientific support to energy security in the Baltic Sea Region.
Rom for bransjestandard?
Energy from the Sea An International Law Perspective on Ocean Energy Utrecht, February 2014 The Increasing Role of Private Actors in the Offshore.
UNEP Training Resource Manual Topic 10 Slide 1. UNEP Training Resource Manual Topic 10 Slide 2 EIA is a process to: F gather information necessary for.
Future European issues on off-shore wind power deployment Steffen Nielsen Head of Section Danish Energy Authority Ministry of Transport and Energy European.
Oil for Development The Norwegian experience
Nwtboardforum.com For reference only. Not a legal document Inuvialuit Settlement Region.
1 August 2010 Shell Upstream International - Europe Consenting Carbon Capture & Storage Scottish Government Workshop - Offshore Pipeline 11 August 2010.
EIA-legislation and practice in Norway history history latest amendments of regulations latest amendments of regulations integrated planning/EIA processes.
Work package 3 Analysis of international MSP Instruments Sophie Jacques 3E Support by: Offshore Wind Power in Italy SEANERGY 2020 project Andrea Marchisio.
EU Member State experience in implementing the Espoo Convention ESTONIA 21 September 2007, Moscow.
Riga 4th December 2008 Renewable energy: is there a Latvian masterplan? Ieva Indriksone Riga Graduate School of Law.
Environmental Impact Assessment in the Slovak republic.
EIA and sensitive areas – from case to case The role of the Directorate for Nature Management Mari Lise Sjong Advisor, Directorate for Nature Management.
PERMIT ISSUANCE SYSTEM IN CROATIA ENVIRONMENTAL REVIEW Authors: Jasna Paladin-Popović Iva Milić Štrkalj Renata Sinovčević Brijuni, 27 November /21/02Croatia.
LEGAL and REGULATORY FRAMEWORK for NUCLEAR and RADIATION SAFETY in BULGARIA General overview Dr. M. Mateeva – Chief Inspector R. Markova-Mihaylova – Chief.
SEA in the Czech Republic Prague, 24 September 2008.
Environmental Protection and Permitting Nurhan IZAIRI Minister of Environment and Physical Planning Republic of Macedonia CONSTRUCTION PERMITS FOR A COMPETITIVE.
Finland’s experience in implementing and applying the Espoo Convention Seija Rantakallio Councellor Moscow, 21 September.
Bulgarian Geology and Mining Ministry of Environment and Water.
Rob Verheem The Netherlands EIA Commission
Division of Environmental Sciences Environmental Studies Program Ronald Lai Program Coordinator of Physical Sciences.
Building Capacity: Responding to SEA Consultation Lucia Susani Environmental Assessment Policy and Process Manager Environment Agency of England and Wales.
IAIA’07, Partidário et al., Building capacity for SEA in Brazil Building capacity for SEA in Brazil Maria Rosário Partidário IST-Technical University of.
Meeting the operational criteria in Norway - through the reform of the Food Safety Administration byJoakim Lystad Director General The Norwegian Food Safety.
| faculty of law groningen centre of energy law The role of law in regulating offshore energy production and securing energy supply Hannah.
Dutch environmental accounts: implementation and compilation Bram Edens Statistics Netherlands.
Protection assessment of Natura 2000 network areas in Poland – main problems Marzena Modrowska Krzysztof Suliński Ministry of the environment in Poland.
Peter Lukáč Ministry of Environment of the Slovak Republic Department of Environmental Assessment.
North Coast Wind Farm Tolano Environmental Consulting.
Public Consultation Session: Consultation and Transparency Requirements for Offshore Petroleum Activities Francesca Astolfi A/g General Manager, Offshore.
Jussi helske1 Workshop on the learning of EC approaches and experience in Licensing of New NPP’s Existing in European Union countries procedures.
Challenges for Wind Farm Development in Bulgaria: The Environmental Aspect Case study: Saint Nikola Wind Farm, Kavarna April 2009.
(input from the Directorate: Coastal Pollution Management Status of legislation and policies regulating the development and practice of aquaculture Oceans.
Strategies to manage human activity in deserts 11.
1 European Regulatory Approach to Free Movement of Goods Daniel PIERRE General Director.
Regulatory Impact Assessment in Poland
Overview of public participation in strategic decision-making in the UNECE area David Aspinwall.
Environmental assessment system in Finland
Business environment in the EU Prepared by Dr. Endre Domonkos (PhD)
PRESENTATION OF MONTENEGRO
National Environmental Policy Act of 1969 (NEPA)
Electricity generation in Japan
SCREENING SCOPING SEA QUALITY CONTROL DECISION
Overview of the implementation of the SEA directive
Presentation transcript:

Wind energy in the Netherlands Public consultation Ronald van den Heuvel Ministry of Transport, Public Works and Water Management North Sea Directorate

Situation At this moment no wind farms on Dutch Continental ShelfAt this moment no wind farms on Dutch Continental Shelf Q7-WP (120 MW):Q7-WP (120 MW): – permit issued in 2002 (realization 2004/2005) 23 km offshore (NSW demonstration project, 100 MW):(NSW demonstration project, 100 MW): –application in process (permit early 2004, realization 2005) – 8 km offshore

Dutch Continental Shelf

Location Q7-WP and NSW IJmuiden Amsterdam Q7-WP NSW 12 mile Territorial seaEEZ

Policy Wind farms only outside 12 mile zoneWind farms only outside 12 mile zone 6000 MW offshore in MW offshore in 2020 Offshore wind location policy in developmentOffshore wind location policy in development Until new legislation no applications acceptedUntil new legislation no applications accepted

Permit procedure Environmental Impact Assessment (EIA)Environmental Impact Assessment (EIA) Application for permitApplication for permit 4 official consultation rounds for public4 official consultation rounds for public Permit issued by ministry of Water Management, other ministries involvedPermit issued by ministry of Water Management, other ministries involved

Consultation nr. 1: Starting note EIA Informal meeting applicant and competent authorityInformal meeting applicant and competent authority Starting note EIA publishedStarting note EIA published Consultation for 4 weeks: viewsConsultation for 4 weeks: views In some cases: informative meetingIn some cases: informative meeting Legal advice of other authoritiesLegal advice of other authorities Advice on Guidelines from Commission for EIAAdvice on Guidelines from Commission for EIA Start of processing EIAStart of processing EIA

Consultation nr. 2: EIA/Application Publication of EIA (and permit application)Publication of EIA (and permit application) Consultation for 4 weeks: viewsConsultation for 4 weeks: views HearingHearing Advice on EIA from Commission for EIAAdvice on EIA from Commission for EIA Legal advice of other authoritiesLegal advice of other authorities Start of processing draft permitStart of processing draft permit

Consultation nr. 3: draft permit Draft permit discussed with applicantDraft permit discussed with applicant Publication of draft permitPublication of draft permit Consultation for 4 weeks: objectionsConsultation for 4 weeks: objections Start of processing final permitStart of processing final permit

Consultation nr. 4: final permit Objections are handled in final permitObjections are handled in final permit Final permit issued and publishedFinal permit issued and published Appeal possible for 6 weeksAppeal possible for 6 weeks

Permit regulates a.o. : Safety for nature/environmentSafety for nature/environment Safety for shipsSafety for ships Safety for other uses (oil and gas, sand and gravel extraction etc.)Safety for other uses (oil and gas, sand and gravel extraction etc.) Safety for archeologySafety for archeology Monitoring and Evaluation Programme (MEP)Monitoring and Evaluation Programme (MEP)

Conclusion / Discussion issues Public consultation results in a better permitPublic consultation results in a better permit Public consultation may lead toPublic consultation may lead to –increase of social acceptance –increase of social resistance Process of decision making takes years; during process change of situation, change of techniques, change of policy/plansProcess of decision making takes years; during process change of situation, change of techniques, change of policy/plans