Rocío Prieto, Co-Chair CEER LNG TF 20 th Madrid Forum 26-27 September 2011 Accessing European LNG terminals.

Slides:



Advertisements
Similar presentations
Permanent High Level Group meeting Athens, September 9 th, 2003 Towards a Standard Market Design for the SE Europe Electricity Market Prof. P. Capros,
Advertisements

GRIP South Region Gas Regional Investment Plans Investment WS – 29 th Sep 2011.
Zagreb, 28 September 2004 The South East Europe gas market: a preliminary analysis of facts and opportunities from the Regulators perspective GAS TASK.
1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative VI. MIBGAS.
PROPOSAL FOR SETTING-UP THE IBERIAN GAS MARKET (MIBGAS) Harmonization of trading licenses in the Iberian area Terms of reference 10 July 2008.
1 TITRE Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11 th Stakeholder Group meeting GRI.
Guidelines for Good Third Party Access Practice For LNG System Operators (GGPLNG) Rocío Prieto ERGEG’s Gas Focus Group (GFG) XIV Madrid Forum, May.
The work of European energy regulators on generation adequacy FTS-CEER workshop on Regulatory Aspects of Power Capacity Markets 7 February 2012.
CREE Site Visit Oslo, September 19, 2013 Who Should Pay for Transmission? Nils-Henrik M. von der Fehr.
Completing the EU internal energy market
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Update on GSE Activities Klaus-Dieter Barbknecht GSE President GIE General Assembly Madrid 21 November 2007.
Rocío PRIETO – Comisión Nacional de Energía Benoît ESNAULT – Commission de Régulation de l’Energie LNG TF chairs 18th Madrid Forum Madrid, 27/28 September.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
Guido Pier Paolo Bortoni President of Italian Regulatory Authority for Electricity Gas and Water (AEEGSI) UNIVERSAL ENERGY ACCESS A Focus on Universal.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
XVIII Madrid Forum Madrid, September 2010 Wholesale energy trading licenses in the EU Johannes Kindler, Vice-President Federal Network Agency Germany.
High-Level Meeting of Regional Energy Regulatory Associations of Emerging Markets Sergey Novikov Head of the Federal Tariff Service (FTS of Russia) April.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
22/11/2007GIE Annual Conference Madrid1 26/04/2007GLE1 Investment in LNG Different approaches in EU FRANCISCO DE LA FLOR - GLE PRESIDENT.
Achieving a sound investment climate – the role of regulators Boaz Moselle Joint-Chair, CEER Gas Working Group Managing Director – Corporate Strategy Ofgem.
21 Kolonaki Square, Athens, T: , F: , E: W: The Energy Community of South.
Christopher Burleson Leslie Kay Ritchie Jitesh Sharma European Energy Restructuring: The Quest for a Competitive Single Energy Market.
The Regional Initiatives: Progress and Prospects Conference Brussels, 28 March 2007 Mr Walter Boltz ERGEG Gas Focus Group Chair Status Report of the Gas.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Energy Infrastructure Package ERGEG preliminary.
DEVELOPMENT OF GAS HUBS South Gas Regional Initiative Madrid, 29th October 2007.
Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Regulation of electricity markets in the.
Natural Gas – Some Regulatory Issues Oil & Gas Industry Practice.
Madrid, 7 th February 2011 Study on Cross Border Transmission tariffs in the MIBGAS (CNE/ERSE) Current Status.
European Federation of Energy Traders GIE annual conference 2008 Bukarest, October Needs of the market participants with respect to creating an integrated.
8th SG Meeting South Gas Regional Initiative 27th April 2009, Paris.
Rocio Prieto - Comisión Nacional de Energía 19th Madrid Forum March 2011 CMPs and anti-hoarding in European LNG terminals Results from public consultation.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
1 South Gas Regional Initiative 16 th Dec 2011 South Gas Regional Initiative 16 th Dec 2011.
Walter Boltz Chairman, CEER Gas Working Group Enabling Markets Initial assessment of merging market areas & trading regions Gas Target Model.
The industrial relations in the Commerce sector EU Social dialogue: education, training and skill needs Ilaria Savoini Riga, 9 May 2012.
3 rd Athens Process Forum /24, Sofia CEER WG SEEER – Regulatory Benchmarking Standards for SEE.
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
Energy Issues and Regulatory Developments In Europe and Eurasia NARUC Winter Meeting International Committee February 17, 2008 Robert A. Archer Energy.
Rocío Prieto, Co-Chair CEER LNG TF 20 th Madrid Forum September 2011 Amendment of GGPSSO for CAM and CMP.
LNG Study: Is an European Action Plan Necessary? Bucharest, October 24 th, 2008 Pedro Moraleda Energy Markets Advice.
IV Athens Forum 3-4 June 2004 Towards a GAS market in the South East Europe Fabio Tambone – Sergio Ascari WG CEER SEEER.
Regional Storage Investment Artúr Böröcz Security of Supply Working Group GSE Regulatory Expert, E.ON Földgáz Storage Zrt. ENTSOG Workshop Bruxelles, 22.
Gas storage: GB experience and future trends Sonia Brown Director, European Strategy and Environment GSE Conference - May 2007.
ETSO-GTE Supporting a secure and liberalized European energy market A Joint Presentation by Mr Geert Joosten, GTE Mr Juha Kekkonen, ETSO 22 January 2003.
13th March 2009, Bilbao GLE Workshop on LNG ERGEG MONITORING GGPLNG Rocío Prieto.
Energy Community Secretariat Needed Reforms in Electricity High-Level Forum on Security of Supply in Kosovo Andreas Pointvogl, Energy Community Secretariat.
Directorate-General for Energy and Transport Mark van Stiphout – C2 Electricity and Gas GSE Workshop on storage investment 24 May 2007 Policy framework.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
Challenges for Natural Gas in the Context of the Energy Union
South Region Second Edition
Dr. Benoît ESNAULT (CRE) and Dr. Stefanie NEVELING (BNetzA)
Gas Regional Investment Plans
Achieving the Internal Gas Market The view of gas suppliers
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Overview on Renewable energy in Bulgaria
The LNG role to improve SoS in Europe
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Capacity Allocation Mechanisms
DRAFT DG TREN Staff Working Paper on LNG
The work of European energy regulators on generation adequacy
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Transparency & Services
LNG Workshop Bilbao, March 13th 2009 GLE.
ERGEG’s reaction on DGTREN LNG study results and policy conclusions
Market integration Security of supply Competition
Presentation transcript:

Rocío Prieto, Co-Chair CEER LNG TF 20 th Madrid Forum September 2011 Accessing European LNG terminals

220 th Madrid Forum, 26/27 September 2011 LNG is increasing its role in European gas markets ( 15% of total European gas supplies in 2010 ) Security and diversification + current competitive prices. Elements that could influence LNG further expansion: Optimising existing LNG import capacity ( 2010 average LNG terminals utilisation ratio: 51%); Building new infrastructures (There are initiatives in almost any coastal country in the region); New market arrangements and LNG codes; Gas demand recovery. Spot trading, potential role of shale gas…; LNG supply sources, capacities, prices, number of agents in the downstream markets. 0 10,000 20,000 30,000 40,000 50,000 60, LNG imports in Europe. Tm Year Greece Portugal Italy Belgium United Kingdom France Spain European LNG import sources in 2011 European LNG market trends 2011/2010 imports growth: +17% until May Source: Waterbone

320 th Madrid Forum, 26/27 September 2011 Conclusions of the 1 st Workshop on Access to European LNG terminals Madrid, 6 th September 2011 Panel 1. Trends in European gas markets: potential role for LNG  Increasing role of LNG in European gas sector;  In a competitive scenario, it is essential to ensure the attractiveness of the EU markets´ conditions for LNG imports to effectively contribute to security of supply, competition and renewables integration in Europe. Panel 2. European regulation governing LNG markets  Further regulatory harmonisation is not foreseen in the short term;  Challenges can emerge from the cohabitation of both regulated and exempted terminals in Europe;  It is important to consider the role of LNG in the gas target model and the relation of network codes and LNG operational rules. Panel 3. Accessing European LNG terminals: operation and transparency  GLE + CEER Transparency Template presented.

420 th Madrid Forum, 26/27 September 2011 Transparency Template 19 th Madrid Forum mandated CEER and GLE. If harmonisation is not considered, transparency must be guaranteed. The purpose is to provide information for promoting potential users´ access + facilitate “terminal to terminal” deviation. CONTENT LSO´s will publish, on their websites, a common template with the information needed to access all European LNG terminals; Information available: All necessary requirements for a fair LNG terminal access (i.e. licenses, arrangements to be signed, services description, main regulatory and technical provisions, tariffs, agendas.…) Discussions with GLE are advanced. Expected to be finished in A commitment by LSOs is needed to implement it along 2012.

520 th Madrid Forum, 26/27 September 2011 Thank you for your attention!