Presented by Matthew Patterson. Mission Conceptualize a satellite to dramatically reduce time and cost Provide a Multi-Mission platform Provide a Unique.

Slides:



Advertisements
Similar presentations
______s Room Budget Created by:. My New Room I plan on purchasing _____ items for $ ____________.
Advertisements

Basic Overview of Project Management and Life Cycle ACES Presentation T. Gregory Guzik January 21, 2003.
Lunar Lander Power Systems
Advanced Multimission Operations System (AMMOS)
Colorado Space Grant Consortium DemoSat-B Colorado State University Matthew Jui, Ian Patterson, Mark Spowart, Todd Wallis June Colorado Space Grant.
Colorado Space Grant Consortium DemoSat-B Colorado State University Matthew Jui, Ian Patterson, Mark Spowart, Todd Wallis July Colorado Space Grant.
RockSat-C 2012 SITR Full Mission Simulation Report University/Institution Team Members Date.
K. Liewer ANITA-Irvine CA 11/25/02 Gondola and Power Systems K. Liewer.
BalloonSat “Optimism Prime” Team “Thumbs Up” Conceptual Design Review Nick Lenk, Greg Nelson, Eddie Cyrus, Jake Varey, Chase Pritchett, Brian Inglis 9/23/08.
Individual Subsystem Testing Report Team Name University/Institution Team Members Date.
By Matthew Patterson. L ow E arth O rbit N anosatellite I ntegrated D istributed A lert S ystem.
Introduction to Space Systems and Spacecraft Design Space Systems Design Power Systems Design -I.
RockSat-C 2011 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
RockSat-C 2011 ISTR Payload Subsystem Integration and Testing Report Universities/Institutions Team Members Date.
Comments on this template -Leave time for questions -Leave time for demonstration -Use your actual hardware in the presentation -Practice your presentation.
Pre-Launch Readiness Review #1 Empty Space, Inc. Corina Allen Miranda Mesloh Brett Anderson Brian Taylor Mike Gainey Katherine Schreiber.
Payload Subsystem Integration and Testing Report Team Name 1 Team Name 2 Team Name N Universities/Institutions Team Members Date.
Conceptual Design Review Metro State College of Denver Daniel Bass, Matt Hanley
1 Electrical Power System By Aziatun Burhan. 2 Overview Design goal requirements throughout mission operation: Energy source generates enough electrical.
Solar Power Marine Corps Expeditionary Power Systems.
0 衛星結構設計 (II) 祝飛鴻 6/17/  What you should learn from this course?  低軌道小衛星發展趨勢  Why spacecraft structure fails?
IMPRS June Space Research, in praxis, illustrated by a ground-based example The „Ozonometer“ as a student project.
1 Formation Flying Shunsuke Hirayama Tsutomu Hasegawa Aziatun Burhan Masao Shimada Tomo Sugano Rachel Winters Matt Whitten Kyle Tholen Matt Mueller Shelby.
Bob G. Beaman June 28, 2001 Electrical Power System SuperNova / Acceleration Probe (SNAP)
1 Formation Flying Project Proposal 2/5/07 Rachel Winters (Team Lead) Aziatun Burhan Tsutomu Hasegawa Shunsuke Hirayama Matt Mueller Masao Shimada Shelby.
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
Space Grant Supported Student Space Hardware Programs in Alabama.
Morehead State University Morehead, KY Prof. Bob Twiggs Power Systems Design
COROTWEEK n°8 Toulouse May the 24th, 2005 Program Status (Th. Lam-Trong) 1 COROT.
PDR Presentation Team JHK Experiment TIC February 27, 2003.
Student Satellite Project Power Generation and Distribution 1 Power Generation and Distribution WINTER ’99 REVIEW Chieh-Kuen Woo Team Leader.
May 17NSF Small Satellite Workshop 1 Student Space Experiment Access - A National Imperative David Yoel & Gil Moore Vanguard.
THEMIS FGM CDR Peer ReviewBerlin, April 6, UCB/Swales should identify an individual that will assume responsibility for magnetic cleanliness on.
1 Mission Discussion & Project Reviews 祝飛鴻 10/14/93.
Flight Testing Small Satellites Through High Altitude Ballooning Presented by Zach Henney 18 April 2015.
ST5 PDR June 19-20, 2001 NMP 2-1 EW M ILLENNIUM P ROGRA NNMM Program Overview Dr. Christopher Stevens Jet Propulsion Laboratory, California Institute of.
Team 5 Vehicle Propulsion QDR 2 Presented By: Maria Mullins James Roesch.
DemoSat IV: Metro Triple Threat Metropolitan State College of Denver Matt Hanley David Fifield Jason Igo Evan I Spitler Devlin Thyne Matt Hanley David.
Haripriya Head, Integration Team Pratham, IIT Bombay 19 th June, 2010.
RockSat-C 2013 FMSTR Full Mission Simulation Report University/Institution Team Members Date.
ACES PROGRAM TEAM ALPHA Preliminary Design Review For Project OMEGA Presented by Alexandra Salgado (Team Spokesperson)
Supernova Brigade Conceptual Design Review Jordan Dickard, Diana Shukis, Amanda Kuker, Michael Lotto, James Bader, Blake Firner 9/22/09.
Status of EPS Battery configuration finalized Solar panel layout –finalized Solar panel Substrate is ready for bonding EM – fabricated and Completed the.
O 2 n Cloud Nine Conceptual Design Review Lea Harris, Ben Woeste, Ian Barry, Brodie Schulze, Caitlyn Cooke, Megan O’Sullivan, Sebastian-Johannes Lorenz.
Spacecraft Technology Structure
Commitment Sunday (giving to God)
The Importance of Solar Car Project Management
Planetary Lander PDR Team Name
Panoramic Rays Final Presentation
<Company name> <Sales team name>
Skillz That Killz Team 3 Final Presentation
Space Proximity Atmospheric Research above Tropospheric Altitudes
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
Project Management.
2012 סיכום מפגש 2 שלב המשכי תהליך חזוני-אסטרטגי של המועצה העליונה של הפיזיותרפיה בישראל.
Team Solkraft Conceptual Design Review
Team Members Class and Date
مفهوم الموازنة العامة المقدمة
Click Here to Create your Account
Power System for the Phoenix CubeSat
2019 First Nation Launch – PDR Virtual Review
Leonidas.
IlliniSat-3 Power Board
CS/EE/ME 75(a) Nov. 19, 2018 Today: Prelimnary Design Review Homework.
The Importance of Solar Car Project Management
NEGATIVE VOLTAGE POSITIVE.
<Your Team # > Your Team Name Here

Detector Proto-Technical board Sep 30, 2010
Presentation transcript:

Presented by Matthew Patterson

Mission Conceptualize a satellite to dramatically reduce time and cost Provide a Multi-Mission platform Provide a Unique environment for undergrads and grads

Why??? Nanosat’s main premise is to perform missions that are less expensive and responsive than large satellites0 Advanced spacecraft Tech are here, but not flight ready because of costs and time We want to be able to meet this need!

Our NanoSat

The Power Subsystem

Ultra Triple Junction Solar Cells To the NiCd battery

To be done... Account for different voltages: 28V, 14V, & 5V. Find manufactures for each item –Within budget and weight Compatibility

Timeline SeptOctNovDec AFOSR JPL PDR Power SeptOctNovDec Find Item Cost Integrating Team Timeline My Timeline

Questions???