MICEEB, 14 Dec 2007 V. Palladino TOF I shielding Shielding of TOF I Decision to add a cage to the iron donut Feb07, CERN Only proven solution available.

Slides:



Advertisements
Similar presentations
Presented by: Kreg McCall. Baseline Management & Control Define Baseline Baseline Types How to Generate a Baseline Baseline Setup for Success Baseline.
Advertisements

Observations and next works from the recent tests of the insertion tools of Mini-Drawers at CERN Roméo Bonnefoy and François Vazeille Tilecal Operation.
June 26, 2009TLH, NFMCC Friday Meeting1 MICE Updates MICE News Overview ISIS and MICE Schedules DAQ Review Spectrometer Update Aspirational Schedule Terry.
CM30 University of Oxford Engineering session Peter Ford Tim Hayler Eddie Holtom Roy Preece Jason Tarrant Steve Virostek.
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
MICE CM16, RAL, 11 Oct 2006V. Palladino Plans for MICE PI detectors & Shielding MICE CM16, RAL Oct 11, 2006 V. Palladino, Univ & INFN Napoli for the small.
Upstream PID Review Alan Bross MICE CM 16 October 12, 2006.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
paul drumm; 3rd December 2004; AFC MM 1 Cost & Schedule Review I Terms of reference: –To review the Cost and schedule of the MICE Muon beam –To review.
Introduction to Hypothesis Testing
M. Bonesini - MICE CM19 RAL 07/10/071 M. Bonesini INFN Milano PMTs tests in Milano (M. Bonesini, M. Rayner, S. Terzo)
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Phone meeting on PID Detectors 25 Jan 2006 Implementation of PID detectors in the general MICE layout By Wing Lau, Oxford.
MICE PID, 6 Dec 2007 V. Palladino Introduction to the meeting Introduction to the meeting 1 ) TOF I shielding (Vittorio introduces discussion) 2) Discussion.
Progress status of the Cherenkov / TOF support stand & TOF Shielding cage.
MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields MICE PID detectors & Shielding MICE CM17, CERN Feb 25, 2007 V. Palladino, Univ & INFN.
Please CLOSE YOUR LAPTOPS, and turn off and put away your cell phones, and get out your note-taking materials. Today’s daily quiz will be given at the.
M. Bonesini - MICE CM18 RAL 16/06/071 M. Bonesini INFN Milano Updates on TOF project.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
Spokesmouse’s News Agenda: o VC 22nd April o 12th-13th May posters for EPAC (Vittorio Palladino) o VC 20th May o VC 17th June o CM27 (RAL) 7th-10th July,
MICE CM39 Alain Blondel CB report 1 Report from the MICE collaboration board.
Using Your Calculator to Find the Future Value of a Single Sum with Annual Compounding 1 Dr. Craig Ruff Department of Finance J. Mack Robinson College.
Easy Chair Online Conference Submission, Tracking and Distribution Process: Getting Started + Information for Reviewers AMS World Marketing Congress /
Project manager report paul drumm CM16 October 2006.
MICE Collaboration Meeting Frascati 26 – 29 June 2005 Work Group report On Design & Safety Review.
The Loan Welcome! So you’re looking to finance a car? Before you look at taking out loans make sure that you are financially able to pay for a vehicle.
27/6/05 Frascati1 M. Bonesini INFN Milano MICE TOF stations updates.
MICE CM in New York Alain Blondel, June MICE COLLABORATION Columbia University June 2003 Action List (online) 1.Funding and some organization.
Equations, Inequalities, and Mathematical Models 1.2 Linear Equations
MICE Collaboration meeting (CM20) At RAL 10 – 13 Feb 2008 AFC Magnet – Status and Progress W. Lau, Oxford University.
Algebra Problems… Solutions Algebra Problems… Solutions © 2007 Herbert I. Gross Set 10 By Herbert I. Gross and Richard A. Medeiros next.
MICE PID & trigger Detectors MICE CM11, LBL Feb 12, 2005 for the PID team Bonesini, Cremaldi, Gregoire, Kahn, Roberts, Sandstrom, Summers, Tilley, Tonazzo,
MICE VC Alain Blondel 1 MICE NEWS MICE VC Spectrometer solenoid 2. Magnetic shielding 3. Next Collaboration meeting.
Technical Board and Safety Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Date processing and conversion Please use speaker notes for additional information!
Recruit, Train, and Educate Airmen to Deliver Airpower for America How Focus Groups Can Help Your Unit 1.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
How To Do NPV’s ©2007 Dr. B. C. Paul Note – The principles covered in these slides were developed by people other than the author, but are generally recognized.
MICE PID size &scraping MICE CM16, RAL, Oct V. Palladino, Univ & INFN Napoli for R. Sandrstrom and others contributing to this effort Yagmur, Holger,
Fall 2015 ECEn 490 Lecture #8 1 Effective Presentations How to communicate effectively with your audience.
DEX Publication Project OASIS PLCS Telecon 27 November 2007 Trine Hansen.
M. Bonesini - MICE Inst Meeting M. Bonesini INFN Milano TOF installation plans.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 12 Jul 2011 LAV construction status: a snapshot 2 A1 Arrived at CERN 29 Jun.
Adding and Subtracting Decimals © Math As A Second Language All Rights Reserved next #8 Taking the Fear out of Math 8.25 – 3.5.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
MICE VC Alain Blondel MICE News 9 March 2005 we did not succeed in preparing a good enough I3 proposal for EU on neutrinos. Problems were.
Multiplication of Common Fractions © Math As A Second Language All Rights Reserved next #6 Taking the Fear out of Math 1 3 ×1 3 Applying.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
Farmer to Farmer ICT Workshop Evaluation Results Based on the responses of 19 workshop participants out of 24 total Presented to USAID by the FACET project.
MICE Funding Update (U.S.) Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory CMPB Meeting August 1, 2007.
M. Bonesini - MICE RAL M. Bonesini INFN Milano PMTs tests in B field.
PId (ToF, CKoVI, EMCAL) V. Palladino et al MICEVC Frascati & Fermilab test beams in July Analysis in progress: MICE PID PhConf 4, 31 Aug aiming.
MICE – Video conference Alain Blondel, 17 December   MICE selected NEWS: Future meetings Safety review Study of controls Gateway I & Toward Gateway.
1 Taking Notes. 2 STOP! Have I checked all your Source cards yet? Do they have a yellow highlighter mark on them? If not, you need to finish your Source.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
Neutrinos from Stored Muons STORM physics with a μ storage ring.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
LBNF Cryo + Detector schedule Filling scenarios (Cryostats #1 and #2) Mohammed Elrafih, Elaine McCluskey, David Montanari, Marzio Nessi, Bob O’Sullivan.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
Spectrometer Solenoid Documents and Review Plans Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National.
MICE VC Alain Blondel, April MICE exectutive board met on 1 April 2004 after the collaboration meeting and remarked the very large amount of.
Project Controls: As-Built S-Curves
MICE PID detectors & Shielding MICE CM19, RAL Oct 10, 2007
LAMAS Working Group June 2017
CSPEC meeting - Coatings
LAMAS Working Group 6-7 December 2017
Presentation transcript:

MICEEB, 14 Dec 2007 V. Palladino TOF I shielding Shielding of TOF I Decision to add a cage to the iron donut Feb07, CERN Only proven solution available at the time Confirmed at CM18 at RAL (TB) Jun07, CERN Exec drawings available Ghislain+Wing Summer 07 Expensive quote at Fermilab Alan Early Oct 07 Request to TB (PRR & construction approval) 5 Sep 07 No reply yet ! Discussed extensivey at CM19PID, VP slidesVP slides Now local shields are proven OK, at least for TOF II Cheaper quote near Fermilab Alan End Nov 07 history

MICEEB, 14 Dec 2007 V. Palladino TOF I shielding Dear all in my understanding the baseline and EB endorsed option for TOF1 is the cage with brackets (the "expensive design"), any other low-cost option (such as the screw-on plate option) is not endorsed at the same level of a local shielding. The low cost option will imply probably not only the crane to pull up the second plate, but also the removal of the full TOF1 detector including uncabling and putting it on a service stall for any operation on PMTs. It is impossible (with the present frame design) to unscrew the PMTs of the first plane (no access from behind). In addition I am puzzled by heavy gang operation nearby a delicate detector. It seems as handling eggs nearby one ton of iron. My position is yes for the cage as it is now or eventually local shielding, no for the screw up/down low cost option. Cheers Maurizio ps regarding the local shielding my cost estimate was around 5K with some moderate increase of work for my mechanics workshop Written opinions collected for this meeting 1) Bonesini

MICEEB, 14 Dec 2007 V. Palladino TOF I shielding Dear all, here are my comments about the shielding cage for TOF1. I am referring particularly to the simplified cage proposed by Alan and to the comments made by Maurizio. The construction of the whole cage could be divided into three categories according to their cost (raw material and machining): 1.the expensive parts (mainly labor-wise): the supporting brackets 2.the reasonable cost items : a) the Virostek plate, b) the closing flange, c) the split ring, d) the hinge mechanism 3.the inexpensive items: guide tubes, stoppers, plastic gliders, spacers, locking pins). This division into three categories is partly based on my experience and on quotations I recently asked in Belgium (Louvain workshop and commercial companies). From now on I shall neglect all items 3. Written opinions collected for this meeting 2) Gregoire I

MICEEB, 14 Dec 2007 V. Palladino TOF I shielding Comments: A. Items 1 and 2A are absolutely mandatory for the operation of MICE and PID. Their fabrication should have started since months... and specific quotations would have been asked much earlier. B. Items 2B,2C,2D and 3 could be replaced by a dedicated local shielding "à la TOF2" (... assuming an agreed design of TOF2 ! which is not yet the case up to now!). But this requires new evaluations, a new mechanical design, new QA/Audit procedure. It is not just a matter of scaling down the TOF2 case. In particular one should not cheat about the thickness of the required local iron shielding. C. Alan's proposal to make a simpler cage (no guide rails, cage opened by craning the closing flange...). In the present design, it should be remembered that TOF1 is attached to the closing flange and,as such, would be lifted with the closing flange. It would imply decabling the whole TOF1 which is not a really wise option. On the other hand and still with the present design, it is not complicated to attach TOF1 to the Virostek plate (thus avoiding decabling!). But then the split ring comes in the way, in the sense that it would be difficult to replace the PMTs located in the corners of the TOF1 setup, without dismounting the whole TOF1. Therefore, the practical way for implementing Alan's solution would be: - attach TOF1 on the Virostek plate, and - lift (as a single piece) the closing flange and the split ring. One then gets easy access to all parts of TOFI without decabling. This meets the wishes of Maurizio. - an advantage is that it completely avoids a specific support on the ground for TOF1 in an already crowded area. D. Budget-wise I do not think that Alan's solution makes lots of savings since the Virostek plate and supporting brackets already represent a very sizable fraction of the total cost. According to the preliminary quotes I got from Louvain, the hinge mechanism itself is not especially expensive compared to the rest. Vittorio already got a first overview of these quotes with other details. The closing flange should cost about 2 kEuros (including machining). I am rather confident that the total cost could be decreased to about 20 kEuros (30 k$) at most. But it is certainly better to share the construction among different manufacturers: commercial companies only for the two large items 1A and 2A, and lab/university workshops only for the more delicate and smaller parts 2A to 2D. Further transportation savings could be done if manufactured in the US. The initial quotes of 60 k$ by FNAL was ridiculous. E. Concluding remarks Considering the large amount of time lost (for various reasons!) since the completion of the whole design, and all the arguments I wrote above, I think it wiser to go ahead with the present cage design. The local shielding option for TOF1 would imply large delays (a couple of months) which are most probably not acceptable for MICE. Regards. Ghislain Written opinions collected for this meeting 2) Gregoire II

MICEEB, 14 Dec 2007 V. Palladino TOF I shielding Written opinions collected for this meeting 3) Lau

MICEEB, 14 Dec 2007 V. Palladino TOF I shielding Written opinions collected for this meeting 4) Bross

MICEEB, 14 Dec 2007 V. Palladino TOF I shielding On the basis of these opinions, debated in today’s PID ph meeting and the new quotes and informations collected the PID team recommends that to be agreed tomorrow

MICEEB, 14 Dec 2007 V. Palladino TOF I shielding The end The old remaining slides are left below as one or two may be rescued to illustrate better the motivations of the decision that we will take

MICEEB, 14 Dec 2007 V. Palladino TOF I shielding Oggetto: request to TB to approve construction of the TOF I Shielding Cage Data: Wed, 05 Sep :23: Da: Vittorio Palladino Rispondi-a: Organizzazione: INFN Napoli A: Alan Bross, CC: Wing Lau, Ghislain Gregoire, Maurizio Bonesini, Steve Virostek, Peter Lau, Alain Blondel, "Michael S. Zisman" Referenze: Dear Ken (and Alan), Ghislain completed his last checks and confirms Wing's opinion that the set of drawings at are indeed ready for production. The PID group would like therefore to ask 1) the TB to give the green light for its construction. 2) Alan to inform us and the TB about the questions raised: a) is the tentative plan to have the TOFI cage built in or around Fermilab still viable? b) would it be ready (for mounting and field mapping, including fringes for TOFI) when the first solenoid arrives there from the Far West? c) if so, are the drawings of appropriate quality for the workshop he has in mind? We hope to hear soon from both of you. Best regards Vittorio Reminder: were we to decide (soon) that a TOF II cage is also needed, the same drawings can be used with the sole modification of the inner radii Messaggio Originale Oggetto: decision process on TOF shielding cages Data: Wed, 13 Jun :18: (CEST) Da: A: Drumm, PV (Paul) CC: Alain Blondel, Ghislain Gregoire, Michael S. Zisman, Maurizio Bonesini, Alan Bross Dear Paul, I have to miss today's TB, I will only be back Saturday, unfortunately. Ghislain can attend the meeting and report the following conclusions from todays PID meeting: 1) we ask the TB to approve constructon of a shielding cage for TOF I, complementing the shielding plate, based on the concepts reiterated in Ghislain's slides today. As we have known for some time, they prove inequivocally the adequacy of the cage to guarantee appropriate performance of the detector. Constructions drawings will be produced as soon as possible by Ghislain in collaboration with Wing and made available to Alan Bross to explore the possibility of building the cage at Fermilab, where the solenoid will stop on its way to RAL. Other labs eventually interested in the construction can also step up, now. 2) it is the desire of the TOF II/KL team to postpone the decision on the TOF II cage to next collaboration meeting, at the latest. Given the schedule of TOF II, this appears acceptable. Tests of PMTs in magnetic field in Milano will meanwhile complete the exploration of the possibility to do without a cage, using only local shieldings of TOF II PMTs. These tests already indicate that local shielding, in addition to the shielding plate, is sufficient for KL (and consequently SW). See you Saturday, when I hope to discuss this also in the EB Cheers Vittorio 5 Sep

MICEEB, 14 Dec 2007 V. Palladino TOF I shielding Oggetto: [Mice-tb] Note on the TOF I shielding cage for the next TB: 14Sep07; 14:30 GMT... Data: Thu, 13 Sep :40: Da: Vittorio Palladino Rispondi-a: Organizzazione: INFN Napoli A: CC: Richard Apsimon, Ghislain Gregoire, Maurizio Bonesini, Lucien Cremaldi Referenze: Dear Tech Boarders, please find attached the note on the TOF I shielding cage that Ghislain wrote in record time. Concerning point 3 of the agenda. Concerning point 2 of the agenda, the TOF0-CKOV support stand, our hope is to hear that a Production Readiness Review indeed is (or about to) taking place. I take the liberty to invite Maurizio, Lucien and Ghislain are invited to the meeting for these items, if there are no objections Vittorio 13 Sep

MICEEB, 14 Dec 2007 V. Palladino TOF I shielding general picture CKOV+TOF0 stand is Production Ready …. green light for Wing to build it due Jan 15 at Fermilab due Jan 20 at RAL TOF0,CKOV TOFI, KL at RAL before Xmas TOFII at RAL Jun 08 SW at RAL uncertain TOFII & beyond ……. final shield & layout being decided cage, expensive, less practical local PTM niches, attractive as more practical and cheaper TOFI stand & shield undergoing Production Readiness Review shielding plate + global PMT niche (cage) PRR started …… first Fermilab quote sobering (60K$) … more quotes coming …. the fewer changes the better SW = back end of eμC AL finish its design & find the money

MICEEB, 14 Dec 2007 V. Palladino TOF I shielding MICE PID PMT shielding needs 4 Tesla Large B fields at PMTs An iron donut, the “Gregoire plate” then to become known as Virostek plate, drastically reduces the fields will be built in each solenoid

MICEEB, 14 Dec 2007 V. Palladino TOF I shielding 1) “Gregoire cage” global shield Further PMT shielding needed however 2) local heavy shields

MICEEB, 14 Dec 2007 V. Palladino TOF I shielding Jul Jan 08 B-mapped at FNAL Jan 15-Feb 15 including fringe fields Jul 08 Apr 08 B-mapped at FNAL Apr 15-May 15 including fringe fields With Cage II

MICEEB, 14 Dec 2007 V. Palladino TOF I shielding Jul Jan 08 B-mapped at FNAL Jan 15-Feb 15 including fringe fields Jul 08 Apr 08 B-mapped at FNAL Apr 15-May 15 including fringe fields No Cage II

MICEEB, 14 Dec 2007 V. Palladino TOF I shielding GENERAL DOWNSTREAM LAYOUT G. Gregoire Shielding of TOF II & beyond: 3D calculation (15') M. Bonesini Decision process for shielding of TOF II & beyond (15') Discussion on downstream layout (10') Second 90’ of PID session on Sunday

MICEEB, 14 Dec 2007 V. Palladino TOF I shielding Note to TB on Sep 14 Other file put on the web today

MICEEB, 14 Dec 2007 V. Palladino TOF I shielding We have two options 1)stick to the baseline and “pay for it” ….or for a cheaper version of it ….. Vittorio, At the PID meeting tomorrow can you bring up the following? The current design of the TOF1 mag cage is expensive partly because of the mechanism that allows the TOF1 assembly to be slid out. A much cheaper approach would be to have the TOF1 cage simply be a ring with a cover plate and the proper supports to hold the TOF1 assembly. But there would be no mechanism to move it out sideways. To access the TOF1, the cover plate would have to come off. Ask Maurizio if he can do any foreseeable maintenance in this configuration. Having to take off the cover plate is cumbersome and access may be an issue, but we should look into this approach. Still Trying. Thanks, Alan cheaper may not imply downsizing ….. Mississipi would be great Wing, Ghislain, Maurizio ready to focus on it 2)evaluate if the alternative of local shields can seriously be set up in time Ghislain can let us know if local shields are good enough within few (2-6) weeks if he gives some priority to this on KL Maurizio tells us that he can do in time (mid April) with 5 to 10 thousands extra Euros to have the design adapted and the shields built & mounted on TOFI in magnetic contact with the upstream Virostek plate Our recommendation is not to do anything that delays 1) Conclusion